2018-11-13Onshore and Near Shore Geotechnical Surveys (Sure Partners Ltd)
Provision of offshore and near shore geotechnical surveys works at Arklow Offshore Wind Park. The work comprises 10 boreholes and 30 cone penetration tests (CPT's) located on as yet undefined locations across the Arklow Offshore Wind Park development area (reference ARK-SK-0007), and associated in-situ, and geotechnical laboratory testing and factual reporting.
View the procurement »
2018-11-07Greater Dublin Drainage Project – Wastewater Treatment Plant and Abbotstown Pumping Station DBO Contract (Irish Water)
The WwTP and Abbotstown Pumping Station are the subject of this competition and will be constructed utilising a design, build and operate contract. Within the WwTP site, a second pumping station is required to lift the incoming North Fringe Sewer (NFS) intercepting pipeline to the inlet works. Scope of works for this competition — Detailed design and construction and Operation of a WwTP with an initial capacity of 500 000 PE to treat a Dry Weather Flow (DWF) of 112 500 m/day and a total sludge tonnage of …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Marine Outfall DB Contract (Irish Water)
Scope of Works includes for the design, build, testing and commissioning of the following•Approximately 2 km length of 2 000 mm internal diameter outfall pipeline, installed using tunneling methods and passing beneath Baldoyle Bay to Velvet Strand:
— approximately 4 km length of 2 000 mm internal diameter outfall pipeline, installed using dredging methods from Velvet Strand to approximately 1 km North East of Irelands Eye,
— outfall diffuser,
— dredge crossing/protection works of existing fibre optic …
View the procurement »
2018-11-07Greater Dublin Drainage Project – Terrestrial Pipelines DB Contract (Irish Water)
The Scope of Works includes for the design, build, testing and commissioning of the following:
— orbital sewer from Blanchardstown, Dublin 15 in the NW of Dublin to the WwTP at Clonshagh (approximately 13,8 km),
—— approx. 1 km length of gravity pipeline through Connolly hospital installed using trenchless techniques (1 800 mm internal dia., c. 10 m depth),
—— approximately 5,4 km length of 1 400 mm dia. rising main,
—— approximately 7,4 km length of 1 800 mm dia. gravity pipeline,
— live connection of …
View the procurement »
2018-10-25Extension to Learning Resource Centre at Institute of Technology Carlow (Institute of Technology Carlow)
This competition is for the appointment of design team consultancy services for the design and delivery of an extension to the existing Learning Resource Centre (LRC) on behalf of Institute of Technology Carlow. The overall gross internal floor area of the proposed extension will be circa 3 000 m spread across 3 or 4 stories. An element of refurbishment and reconfiguration of the existing 6 200 m, 3 storey building will also be required as part of the contract. The proposed extension will be to the east …
View the procurement »
2018-10-05Establishment of a Multiple Operator Framework for Integrated Design Consultancy Services (Sophia Housing Association)
Sophia Housing Association wish to establish a multiple operator Framework Agreement for integrated design teams for the provision of professional design related services for its ongoing development and refurbishment programmes. The design team services to be provided comprise the following principle services/disciplines and specialists as set down in the suitability assessment questionnaire:
— architect including fire safety design, conservation, planning and PSDP,
— civil/structural Engineer,
— …
View the procurement »
2018-10-03The Contracting Authority, Waterford City and County Council (WCCC) is seeking to establish a Multi-party Framework... (Waterford City and County Council)
The Contracting Authority, Waterford City and County Council (WCCC) is seeking to establish a multi-party framework agreement for mechanical and electrical consultancy services.
WCCC has a property portfolio in excess of 100 buildings, which are located throughout City and County Waterford and plan to upgrade a significant number of services within a number of the buildings over the next 4 years from 2019 -2023.
WCCC properties include offices, libraries, fire stations, sports centres, local authority …
View the procurement »
2018-10-02Kanturk National School — Pre-qualification for Selection as Mechanical Reserved Specialist (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 m on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage …
View the procurement »
2018-09-10The Supply and Installation of Vehicle Lifts (Bus Eireann/Irish Bus)
The Contracting Authority proposes establishing a Single Supplier Framework Agreement for the supply and installation of Vehicle Lifts for a four (4) year period.
The requirement is for mobile column vehicle lifts, which combined, must be capable of lifting large bus and coach vehicles with a design gross vehicle weight in the region of 30 000 kilograms.
Column lifts must be able to work in synchronisation to ensure smooth-running lifting and lowering even in situations where the distribution of vehicle …
View the procurement »
2018-08-30Engineering Training And Development (Electricity Supply Board (ESB))
ESB International provides commercial, engineering, environmental and asset management services to the ESB Group and other clients. ESB International engineering teams operate within an energy sector specific environment and provide services to international utility clients in the areas of management contracting, consulting and owner’s engineering (transmission/distribution and generation).
View the procurement »
2018-08-28HVDC Technical Advisor for the Celtic Interconnector Project (EirGrid plc)
The Scope of Requirements is expected to include, but is not limited to provision of support and advice across a number of work packages:
Work Package 1 (WP1) — Support EirGrid in the evaluation of potential HVDC technical solutions and prepare a technical report;
Work Package 2 (WP2) — Support EirGrid in the technical documentation preparation for EPC Contracts procurement;
Work Package (WP3) — EPC Procurement Support from publication of OJEU Notice to Contract Award;
Optional work packages:
Work …
View the procurement » Mentioned suppliers:WSP UK Ltd
2018-08-09Cloncreen Client Engineer (Bord Na Mona)
Bord na Mona wishes to invite proposals from suitably qualified parties for the provision of services relating to the role of Client Engineer to develop a fully consented large scale onshore wind farm in Ireland. It is expected the Client Engineer will provide support services required to deliver the project including the following: support the procurement of turbine, civil and electrical contracts in preparation of documentation, assessment of tenders and commercial negotiations; specialist support for …
View the procurement » Mentioned suppliers:Ionic Consulting Ltd
2018-08-035Nr. National Frameworks (Multiple Operator) for Design Team Services 2018 (Health Service Executive (HSE))
4Nr. National Frameworks and 1Nr. Regional Framework for Design Team (DT) Services 2018 having 6Nr. Principal DT Disciplines:
1) Architect Services (including Planning Consultancy Services);
2) Quantity Surveying Services;
3) Building Services Engineering (M&E) Services;
4) Civil/Structural Engineering Services;
5) Fire Safety Consultancy Services; and
6) Independent Project Supervisor Design Process (PSDP) Services.
View the procurement »
2018-07-2460 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development.
View the procurement »
2018-07-20Ringsend WwTP — Phosphorus Fixation Contract (Irish Water)
The Ringsend WwTP treats most of the wastewater arising in the Greater Dublin Area. Irish Water is currently planning an upgrade to the Ringsend Treatment Plant based on the application of aerobic granular sludge technology (Nereda®) which will provide for nutrient removal, including Enhanced Biological Phosphorus Removal (EBPR). The introduction of aerobic granular sludge and EBNR will be carried out in phased upgrades of the Ringsend plant, with the aim (inter alia) of reducing the Phosphorus (P) …
View the procurement » Mentioned suppliers:Murphy International Ltd
2018-07-20Design Team Services for 125 Bed Residential Development at Leopardstown Park Hospital Campus (Leopardstown Park Hospital)
The proposed development will consist of two residential buildings (2-3 storeys) providing 125 nr. single en-suite bedrooms, day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities. In addition, the project will also comprise all associated enabling, site and general landscaping works and refurbishment of the existing Hospital as required to accommodate linkages to the 2 new residential buildings.
View the procurement »
2018-07-06Cloncreen Client Engineer (Bord Na Mona)
Bord na Mona wishes to invite proposals from suitably qualified parties for the provision of services relating to the role of Client Engineer to develop a fully consented large scale onshore wind farm in Ireland. It is expected the Client Engineer will provide support services required to deliver the project including the following: support the procurement of turbine, civil and electrical contracts in preparation of documentation, assessment of tenders and commercial negotiations; specialist support for …
View the procurement »
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:Tim Kelly Electrical
2018-07-04New Radiation Oncology Centre at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8 050 m in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:T Bourke
2018-06-05A contractor to provide mechanical and electrical services installations for the fitout of Fitzwilliam 27 (Building... (Electricity Supply Board (ESB))
The Contracting Entity intends to procure a contract for the mechanical and electrical services installation for the fitout of Fitzwilliam 27 (Building B) of the new office development, c. 15 000 m (Net Internal Floor Area) of Grade A office/ mixed use development on the Site at 27 Fitzwilliam Street Lower, Dublin 2 comprising part of a city block bounded by Fitzwilliam Street Lower to the west, Mount Street Upper to the north, James’s Street East to the east and Baggot Street Lower to the south. The …
View the procurement »
2018-06-01Request for Tenders for the Provision of Condition Surveys for the Courts Service (The Office of Government Procurement)
The Courts Service operates out of approximately 110 buildings located in 26 counties in Ireland. The Courts Service wishes to undertake a comprehensive on site condition survey of 67 courthouse buildings in its estate. The properties to be surveyed comprise mainly of historic buildings dating from the 1800's. The survey of each building will assess the condition of the building fabric, the condition of its M+E services and compliance with relevant statutory requirements. The survey will further identify …
View the procurement » Mentioned suppliers:AECOM Ireland Ltd
2018-05-25Architect Led Design Team — Three Park Place (Science Foundation Ireland)
Science Foundation Ireland wishes to procure the Services of an Architect Lead Single Point Design Team (SPDT) to ensure that the design of Science Foundation Ireland’s new premises in Dublin 2 is carried out effectively, efficiently and on a timely basis. The successful Tenderer will be responsible for full delivery of services as required to complete the relocation of the SFI office.
View the procurement »
2018-05-24Commercial Concession to Operate and Maintain the 3 Masted Barque Jeanie Johnston (Dublin City Council)
Dublin City Council proposes to award a commercial concession for a period of 5 years subject to the conditions set out in this ITT. The Successful Tenderer shall have an exclusive right to provide services on the Jeanie Johnston, the primary use of which is that of a famine museum. The Successful Tenderer will be expected to achieve their earnings by maximising trade through pro-active and commercial management, and as such are expected to identify and put forward proposals best suited to the space to …
View the procurement » Mentioned suppliers:Sea-Cruise Connemara Ltd
2018-04-27Multi-Party Framework Agreement for Dublin Port Ground Investigation Works (Dublin Port Company)
DPC proposes to establish a framework of ground investigations contractors, to facilitate the engagement of a competitive process for the award of call off contracts between 2018 and 2024. The scope of the works envisaged under this ground investigation’s framework are as follows:
— percussion boring,
— rotary drilling,
— pitting and trenching,
— sampling and monitoring during intrusive investigation,
— probing and cone penetration testing,
— geophysical surveying,
— In Situ testing,
— instrumentation,
— …
View the procurement »
2018-04-27Appointment of Architect and Design Team (Shannon Commercial Properties DAC)
Shannon Commercial Enterprises DAC strategy under this appointment is to design and gain planning approval for both the phase 1 and phase 2 developments as outlined below with associated provision for car parking and ancillary site development works as well as construction procurement and management for the Phase 1 buildings only, along with the provision of a full time Resident Engineer for the construction period. The square footage is approximate and may vary up or down depending on final design. It …
View the procurement » Mentioned suppliers:— Neill — Malley Ltd
2018-04-20Architect Led Design Team Consultancy Framework for Cranmore Regeneration Project including an award for Phase 1 Works (Sligo County Council)
Sligo County Council (the “Authority”) has a lead role in the delivery of the Regeneration Project at Cranmore Housing Estate. The pillars of the Regeneration Project are as follows:
— social regeneration,
— physical regeneration.
Sligo County Council proposes to establish a Multi-Operator Consultant Framework Agreement for Design Team Services for a fully integrated Architect Led Design Team Service, hereafter called ‘Design Services’ for the detailed Design and Construction Management of Building …
View the procurement » Mentioned suppliers:Rhatigan Architects