2014-06-21   CE/5283/SS - Specialist Systems and Services (Iarnrod Eireann-Irish Rail)
The primary objective of this Contract is to provide support and maintenance to the Chief Civil Engineers (CCE) Buildings & Facilities department of IÉ for Specialist Systems and Services currently in usage at Asset Locations throughout the rail network. The list of sub systems deemed inclusive are categorised as follows: 1) Automated powered Door Sets 2) Manual & Powered Security Shutters 3) Access Control Systems 4) Door Entry Systems 5) Gates & Barriers Systems 6) Intruder Alarm Systems 7) Clocks View the procurement »
2014-06-21   CE/5281/SS - Mechanical Systems and Services (Iarnrod Eireann-Irish Rail)
The primary objective of this contract is to provide support and maintenance to Chief Civil Engineer (CCE) Buildings & Facilities department of Iarnród Éireann for Mechanical Systems and Services currently in use at asset locations throughout the rail network. The list of sub systems shall be categorised as follows: 1) Oil & Gas Boiler Heating Systems 2) Heat Recovery Systems 3) Solar Heating Systems 4) Air Handling Systems 5) Air Conditioning Systems 6) Water Storage & Pumped Systems 7) Hot and Cold … View the procurement »
2014-06-21   ED & Dialysis Fit Out & Other Works Project - New Emergency Department & Dialysis Unit Fit Out & Associated Other... (Health Service Executive (HSE))
The project includes the fit-out for new Emergency and Dialysis Departments and related other works at University Hospital Limerick. The Emergency Department will be mainly accommodated in a shell building at level 0, part of which is directly underneath the hospital's current live Intensive Care Unit and the remainder of the shell space is underneath another shell space at level 1 which will also be fitted out as part of the works to provide a new dialysis unit for the hospital. The works will include … View the procurement »
2014-06-05   Pool and Outdoor Facilities — Construction of a new swimming pool complex, outdoor educational building and outdoor... (Mayo County Council)
Site 1. New development of a swimming pool complex and outdoor educational building, incorporating indoor swimming pools, viewing area, changing and storage facilities, fitness gym, aerobics studio, climbing wall, lecture rooms and associated offices, site services, car park, pedestrian links at Knockacroghery, Castlebar, Co. Mayo. Site 2. New development of outdoor playing pitches, athletic track and clubhouse, incorporating changing, toilet and storage facilities and all associated site services, … View the procurement »
2014-05-29   Kevin Street Garda Divisional HQ – Phase 2 – Lift Specialist Prequalification (Office of Public Works ( OPW ))
The works will consist of the construction of a new 6,840 sqm Garda Divisional Headquarters building adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace), with a 5,400 sqm double basement, The development consists of a 2-3 storey building with flat roofs along the west boundary; a 5 storey building with flat roof and curved street elevation along the east boundary and a connecting glazed atrium with a mono-pitch glass roof. Lift … View the procurement »
2014-05-29   Kevin Street Garda Divisional HQ – Phase 2 – Main Contractor Prequalification (Office of Public Works (OPW))
Scope of the proposed work comprises a New Garda Divisional Headquarters (Phase 2) which will be adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace). This project is a 2 phase development, the first phase of which is now complete. This second phase of the works will consist of the construction of a new 6 840 sqm Garda Divisional Headquarters building with a 5 400 sqm double basement. The development consists of a 2-3 storey building … View the procurement »
2014-05-29   Kevin Street Garda Divisional HQ – Phase 2 – Electrical Specialist Prequalification (Office of Public Works (OPW))
The works will consist of the construction of a new 6,840sqm Garda Divisional Headquarters building adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace), with a 5,400 sqm double basement, The development consists of a 2-3 storey building with flat roofs along the west boundary; a 5 storey building with flat roof and curved street elevation along the east boundary and a connecting glazed atrium with a mono-pitch glass roof. The … View the procurement »
2014-05-02   LYIT Ref: 02/14 Local Energy Supply Contract for Biomass Fuelled Heat Centre with Local District Heating Distribution (Letterkenny Institute of Technology)
Letterkenny Institute of Technology (LYIT) through the National Energy Services Framework as developed by the Department of Communications, Energy and Natural Resources and the Sustainable Energy Authority of Ireland propose to enter a Local Energy Supply Contract to design, finance, install, commission and operate a wood fuelled Biomass heat centre with district heating distribution to the Main Building, Nursing and CoLab buildings all on the LYIT Campus at Port Rd., Letterkenny Co. Donegal. The … View the procurement »
2014-04-27   CON/0021/2014 – Proposed Military Archives Facility at Cathal Brugha Barracks, Dublin 6 – Electrical Specialist (Department of Defence)
Electrical Services Installations to new build Archive Building with a footprint of approximately 800 m, to accommodate a multi level storage system for archive material connecting to an existing building, is required to be restored and converted to reading rooms and offices with a floor area of approximately 550 m. View the procurement »
2014-04-21   CERC Project – construction of a clinical education and research centre at University Hospital Limerick (Health Service Executive (HSE))
The development will comprise the construction of a circa 3 442 m 4 storey clinical education building containing a lecture theatre, tutorial rooms, library, office accommodation and research facilities, roof mounted plant, and including a ground floor circulation link to the existing hospital and associated external works. View the procurement »
2014-04-17   Courts Bundle Public Private Partnership (PPP) (National Development Finance Agency)
Following on from the Prior Information Notice ("PIN") (RFT 80008), the National Development Finance Agency, acting for and on behalf of the Department of Justice and Equality (“DJE”) (as Sanctioning Authority ) and the Courts Service (as Sponsoring Agency) intends to procure the Courts Bundle PPP (the Project) to design, build and/or extend and/or refurbish (as outlined in the Project Information Memorandum/Pre-Qualification Questionnaire document attached to the eTender's notice), finance and maintain … View the procurement »
Mentioned suppliers: BAM PPP PGGM Infrastructure Cooperatie UA
2014-03-28   Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-03-27   CE/5218/GM - Mechanical & Electrical Services [Framework Agreement] (Iarnrod Eireann-Irish Rail)
Iarnród Éireann are advertising a call for competition for the establishment of a multi-party framework agreement. This framwework agreement will be split into 3 lots (East Region, South Region, West Region) with each lot containing a provision for Planned Preventative Maintenance Works, Un Planned Asset replacement Works, Planned Preventative Renewal Works (PPR), Provision of Technical & Skilled personal with Transport, associated tools, test equipment and CAD terminals; and Provision of Call Out / … View the procurement »
2014-03-26   Mar 2014 – Tender for the provision of Electrical Maintenance Services to IT Tralee (Institute of Technology Tralee)
The Institute of Technology Tralee is seeking the services of an Electrical Contractor to provide on-going, electrical, plumbing/mechanical and general maintenance services on a full-time basis to the Institute. The main component of this tender is Electrical Maintenance and Installation and it may not be subcontracted. Applicants must be registered Electrical Contractors and must hold current membership of a licensed regulatory body for Electrical Contracting in Ireland. Full details can be found in the … View the procurement »
2014-02-21   Novation for WGB Phase 2 Fit Out - Novation of Mechanical, Electrical & Facade Installation works for UCC Western... (University College Cork (UCC))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical ,Electrical & Facade Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF … View the procurement »
Mentioned suppliers: Gunn Lennon Fabrications Ltd Kiernan Electrical Ireland Ltd. Winthrop Engineering Ltd
2014-02-14   Novation of M & E Installations - Mechanical & Electrical Installations for The ASSERT Centre Project -UCC... (University College Cork (UCC))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical & Electrical Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF Model Form … View the procurement »
Mentioned suppliers: KD Mechanical Ltd Mercury Engineering Ltd
2014-02-05   Department of Education & Skills - Design and Build Contractor Framework for Rapid Build Schools, 2014–2016 (Department of Education & Skills)
The Contracting Authority intends to establish a Design & Build Contractor Framework for the delivery of school projects in rapid developing areas across Ireland. The framework will be established following short listing of candidates and will be based on the results of a first tender competition. This first competition will include the award of one school project. The Contracting Authority is seeking expressions of interest from Design & Build Contractors who have the capability of delivering a minimum … View the procurement »
2013-12-20   UCC/2013/31 - Supply, Installation and Commisioning of Audio Visual Equipment (University College Cork (UCC))
University College Cork has a wide audio visual infrastructure covering 157 Central Teaching Rooms. In addition The University has more than 120 departmental laboratories, teaching rooms and meeting rooms containing AV equipment. Included in these are over 220 permanent data projection systems and more than 20 rooms using large monitor presentation displays. Each system typically incorporates a permanent PC and DVD player and allows connectivity for laptops, document cameras and other presentation … View the procurement »
2013-12-20   The ASSERT Centre Project - UCC Brookfield Health Sciences Complex - The ASSERT Centre Project, College Road, Cork (University College Cork ( UCC ))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (restricted procedure) for applicants and is inviting expressions of interest from Works Contractors as the first stage of a two stage process under the restricted procedure. The purpose of the first stage is to obtain information from Works Contractors to determine their suitability to carry out the requested works. Please note this is not a tender document. The proposed works comprise - the construction … View the procurement »
Mentioned suppliers: Clancy Construction
2013-12-19   Primary Care Centres PPP Contract (National Development Finance Agency (as agent acting on behalf of HSE and Dept. of Health))
The National Development Finance Agency (NDFA), as agent acting on behalf of HSE and Dept. of Health, intends to procure a Public Private Partnership (PPP) within the Primary Care Centres (PCCs) Programme to design, build, finance and provide facility management services to between 10-14 PCCs. The NDFA intends to include provisions within the contract and tender documents relating to the provision of social and/or community benefits, including in particular training and/or employment opportunities for … View the procurement »
2013-12-17   Road Signs - Road Signs – Tender for the supply and delivery of Road Signs to Mayo County Council and other Local... (Mayo County Council)
Tenders are invited by Mayo County Council for the supply and delivery of Road Signs and associated products to various locations throughout County Mayo and participating authorities. These locations will include area depots, and works sites around the counties. View the procurement »
2013-12-10   13/113 - The Provision of Major Process and MEICA Works (Incorporating Associated Civil Works) to Irish Water (Bord Gais Eireann)
Irish Water is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Major Process and MEICA Works (Incorporating Associated Civil Works) to support the provision of Water Services (water and wastewater) Capital Investment. It is envisaged that these Major Process and MEICA Works will be carried out in a planned manner where work packages are identified in advance of each call off. The works will be sub-divided into two … View the procurement »
2013-11-20   SCp2 - Refurbishment of Science Centre Exhibition at Birr Science Centre (Birr Castle)
The works shall include a review and redesign of the layout of the exhibition, reordering of the reception foyer and entry procedures, the review, updating and renewal of the exhibition, including displays, exhibits, audiovisual equipment, signage, colour and branding schemes, provision of additional display and exhibit lighting, replacement of CCTV recording, and supply and commissioning of multilingual GPS operated handheld Audio tour guide devices and mapping and signage for the Castle demesne walks. View the procurement »
2013-11-15   Framework for the supply of Fixed Voice and VoIP services (Department of Public Expenditure and Reform)
The Department of Public Expenditure and Reform has decided on the establishment of framework agreements for fixed voice and voice over IP (VOIP) services and associated products and services, and the OGCIO will operate as the Contracting Authority for their establishment on behalf of the non-commercial public sector in Ireland. View the procurement »
2013-11-12   2013.11.12 - 75 Bed Ward Block University Hospital Galway (Health Service Executive (HSE))
A 75-Bed 3 storey Ward Block plus one level of plant, on the grounds of University Hospital Galway, located between Block 2A and the Maternity wing. The proposal includes a link corridor to connect over 3 storeys to Block 2a and at Ground Floor to the existing circulation corridor adjacent to the Maternity wing. The proposal also includes for demolition of a single storey ward, temporary buildings and plant rooms which are being displaced by the proposed Ward Block ground floor plan. View the procurement »
2013-10-31   DIT Campus at Grangegorman PPP - Contract Notice for DIT Campus at Grangegorman Central & East Quads PPP (National Development Finance Agency)
Following on from the Prior Information Notice ('PIN') (RFT 75915), the National Development Finance Agency, acting for and on behalf of the Minister for Education and Skills, intends to procure the Dublin Institute of Technology ('DIT') Campus at Grangegorman Central & East Quads PPP (the 'Project') to design, build, finance and maintain 2 third level education buildings within the proposed DIT campus. It is expected that the Project will have an ex VAT capital value of the order of EUR 200 million in … View the procurement »
Mentioned suppliers: Eriugena Designated Activity Company
2013-10-24   13/101 - Provision of Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to Irish Water (Bord Gais Eireann)
Irish Water wants to establish a multi-supplier framework agreement for the provision of all required works and services associated with Minor Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) Works to support the provision of water services capital investment. It is envisaged that these Minor MEICA Works will be carried out in a planned manner where work packages are identified in advance of each call off. The works will be sub-divided into five separate lots detailed below. Lot 1: … View the procurement »
2013-10-09   Energy Efficient Retro-Fit Works - Framework Agreement for Energy Efficient Retrofit Works to some School Buildings... (Kildare and Wicklow Education and Training Board)
The Kildare and Wicklow Education and Training Board (KWETB) plan to establish a Framework Agreement for Energy Efficiency retrofit works in a number of existing school buildings in the Kildare and Wicklow Areas. View the procurement »
2013-10-02   Group B - Donegal Group B Sewerage Schemes - Contract no 1 - DBO Contract for Killybegs, Bundoran, Glencolumbkille &... (Donegal County Council)
DBO Contract for the construction of new waste water treatment plants at Killybegs, Bundoran and Glencolumbkille and the upgrade/extension of the existing waste water treatment facility at Convoy. View the procurement »
2013-09-19   Road_Signs_2013 - Supply Road signs to Mayo County Council and 6 othe local authorities (Mayo County Council)
Mayo County Council and participating authorities have identified a core list of products for this tender. A prepared list of core requirements detailed on an excel spreadsheet will accompany this document. You are required to enter your price, opposite the products listed. View the procurement »
2013-09-13   UCDOPP522 - UCD Science Centre - Works Package 4 Electrical Services Installation (University College Dublin ( UCD ))
As part of the expansion and refurbishment of the UCD Science Centre development, UCD is currently constructing c.20 000 m2 of new accommodation in conjunction with the refurbishment of c.10 000 m2 of existing facilities. The purpose of this qualification process is to prepare a shortlist of suitably experienced and qualified Works Contractor Candidates to tender for a contract to undertake elements of the fit-out works to the Science Centre development. This notice relates to Works Package 4 which … View the procurement »
Mentioned suppliers: CJK Engineering Ltd
2013-08-30   A158/3/1 - Construction of a new 8 classroom Gaelscoil Eadan Doire and a new 30 classroom Scoil Bhríde at Edenderry,... (Office of Public Works ( OPW ))
Gaelscoil Eadan Doire: New single / two -storey primary school with a total internal floor area of 1,363 sq. m., to consist of 8 classrooms, a general purpose room, library, support accommodation and all ancillary works. Provision of 19 on-site car-parking spaces, vehicular access roads, set-down area, pedestrian access pathways, ball court, play area, bin store, bicycle shelters, oil storage tank, on-site foul drainage system, surface water attenuation, signage and landscaping as part of the overall … View the procurement »
2013-08-29   Server Room Fit out - Open Tender for a complete Server Room Fit Out in the Dublin City Area (FAS - Foras Aiseanna Saothair, Training and Employment Authority)
FÁS plans to vacate its current Baggot Street offices in the coming months. A new location for HO has not yet been identified, but it will be within the central Dublin area. There are currently two server rooms in Baggot Street and these will be merged and relocated to our new premises. Our two server rooms support FÁS in all its business functions. There are currently over 100 offices on our WAN, in addition to the services we provide our own staff – our internal applications are accessed by the DSP, … View the procurement »
2013-08-15   13/086 - A Multi-Supplier Framework for the Provision of Water Services Repair and Maintenance Works to Irish Water (Bord Gais Eireann)
IW is tendering to establish a Multi-Supplier Framework Agreement for the Provision of Water Services Repair and Maintenance in respect of: (1) Civil Engineering Works; (2) Mechanical and Electrical Works; (3) SCADA and Telemetry Works; and (4) Instrumentation, Servicing, Calibration and Certification Works. View the procurement »
2013-08-13   Dublin Institute of Technology Research Hub (EHSI & HHI) (Grangegorman Development Agency)
The GDA is seeking to appoint a design & build contractor with an integrated multidisciplinary contractor design team who will design and construct a new build Research Hub incorporating the Environmental Health Sciences Institution (EHSI) and Hot House Incubation Unit (HHI) within a 5 storey development circa 4 500 m². The Grangegorman Site is a brownfield site of 28.7 Hectares that is in a process of change from institutional use as the former St Brendan's Hospital to a new urban quarter comprising of … View the procurement »
Mentioned suppliers: Bam Building Ltd
2013-07-19   Novation of M and E Installations – Mechanical and Electrical Installations for New Beaufort Maritime and Energy... (University College Cork ( UCC ))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to appoint Individual Lots for Mechanical and Electrical Specialists for the project. Each Individual Lot will be evaluated separately. The successful applicants for each lot will enter a contract with the employer and will subsequently be Novated to the Main Contractor under clause 5.4 of the Public Works Contract for Building Works designed by the Employer PW-CF1 using the CWMF Model Form … View the procurement »
2013-07-18   Childcare Special Care Units – Proposed new HSE Childcare Special Care Residential Units at Portrane, Co. Dublin,... (Health Service Executive (HSE))
Proposed New HSE Childcare Special Care Residential Units at Portrane, Co. Dublin, Castleblayney, Co. Monaghan and Glanmire, Co. Cork. View the procurement »
2013-06-06   NUIG/BUILD/013/13 - Electrical Services Installations for NUI Galway Clinical/Translational Research Facility at... (National University of Ireland, Galway (NUI Galway))
The proposed Clinical Research Facility and Translational Research Facility (CRF-TRF) is a four-storey building plus roof level penthouse plant enclosure with a gross floor area of approximately 5,300m². This facility is a joint development of the Health Service Executive and National University of Ireland Galway. The CRF-TRF will be located on the grounds of University Hospital Galway and is directly adjacent to the Clinical Science Institute, Critical Care Facilities, Ward Accommodation Block and the … View the procurement »
2013-04-17   PLMC 2013 - Public Lighting Maintenance Contract 2013 Laois & Offaly (Laois County Council)
Laois & Offaly Local Authorities now requests tenders from suitably qualified contractors for the provision of maintenance and associated services for these public lights as set out in these documents. The maintenance contract will initially operate for a period of one (1) years from the 1st September 2013 to 31.8.2014 and may be extended annually up to further Three (3) years at the discretion of the contracting authorities. View the procurement »
2013-03-28   Mar 2013 - Public lighting maintenance works and associated services contract (Westmeath County Council)
Westmeath County Council and Longford County Council are responsible for public lighting within their administrative areas. Tenders are invited from suitably qualified and experienced Contractors for the Maintenance Works and Associated Services for this public lighting during normal contract hours with an on-call service after contract hours. Much of the lighting is mounted on ESB Network Supply poles and access to these lights is under license subject to ESB Networks training and approval. View the procurement »
2013-03-14   2013/03/1 - Framework Agreement for General Maintenance and Small Building Works (The National Maternity Hospital)
Framework Agreement for General Maintenance and Small Building Works. You must expressed you interest via www.etenders.gov.ie. All documents are available for download and submission via www.etenders.gov.ie View the procurement »
2013-03-12   responsive repairs and voids repairs to occupied dwellings (Cluid Housing Association)
Responsive repairs to occupied domestic dwellings and repairs to void properties to achieve lettable standards for incoming tenants View the procurement »
2013-02-08   Revised UPS /Data Centre - UPS and Data Centre Equipment for Tallaght & Ballyshannon (Health Service Executive (HSE))
Supply of UPS and Data Centre (with integrated cooling PDUs etc) to Ballyshannon and Tallaght. View the procurement »
2013-02-06   ITT13-003 - Supply of engineering project management support for Marine Institute, Rinville, Oranmore, Co. Galway (Marine Institute)
The Marine Institute, a semi State body, wishes to invite tenders for the supply of Engineering Project Management Support to the Marine Institute, Rinville, Oranmore, Co. Galway. It is anticipated that this will be for a period of up to 2 years, however this may be extended to into a third year if there are delays in the granting of a foreshore licence or other unforeseen delays. View the procurement »
2013-01-23   UL0279 - Main contractors, mechanical contractors and electrical contractors for construction of the Bernal... (University of Limerick)
The development will comprise of 7 500 m2 of highly serviced science and engineering research laboratories, offices, teaching and seminar rooms, lecture theatre and associated ancillary accommodation including associated external works. View the procurement »
2013-01-16   Construction of a community and library building of circa 2,250m2, 4 synthetic pitches,3 grass... (Dun Laoghaire Rathdown County Council)
Construction of community and library building 2,250m2, 4 synthetic pitches, 3 grass pitches, playground,skate park, car parking and landscaping works on 18 acre green field site in Ballyogan County Dublin. View the procurement »
2012-12-20   DCUW12114 - DCU Selected Works Contracts Frameworks (Dublin City University (DCU))
DCUW12114 - DCU Selected Works Contracts Framework - Lot 1 t is the requirement of Dublin City University ("DCU") to appoint 6 Contractors to a Framework to carry out selected building works on all properties owned and operated by DCU, and it's subsidiaries and associated colleges in the Dublin region. Sample works will include, but are not limited to: -General Building Work -Extensions, Demolitions and Alterations to and of existing structures; -Construction of new buildings; -Repair and Refurbishment … View the procurement »
2012-12-18   NDFA DSBP D&B Framework - National Development Finance Agency Devolved Schools Build Programme Design and Build Framework (National Development Finance Agency)
The NDFA is seeking to establish a Framework Agreement of contractors in respect of school projects to be procured and delivered on a design and build basis by the NDFA acting on behalf of the Department of Education and Skills (DoES) - (the 'NDFA Devolved Schools Build Programme' or 'DSBP'. Documents relevant to this competition are set out in the Tender Document Index and attached to this notice. Parties to the Framework Agreement will be chosen by means of this Framework tender competition. View the procurement »
Mentioned suppliers: ABM Construction and Clancy Conctruction... JJ Rhatigan Sammon Contracting Ireland Ltd Stewart - Treacy Brothers Joint Venture Western Building Systems