2022-01-18Mechanical & Electrical Engineer Services for Additional Accomodation at Scoil ChaitlĂn Maude (Scoil Chaitlin Maude)
Scoil Chaitɨn Maude is a primary school under the patronage of An Foras Pátrúnachta
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise
Section A:
• Central Activiies Space 80 m2
• Classroom safe base 70m2
• Classroom safe Base 70m2
• Toilets and shower area 20m2
• Quiet Space 1 12m2
• Quiet Space 2 12m2
• Multi Activity Room 20m2
• Daily living skills 15m2
• Staff Toilets 10.0 m2
• Storage 25m2
• Cleaner store / linen / …
View the procurement »
2022-01-17Powered Gates and Shutters (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing Powered Gates, Shutters, Doors and Barriers. The requirements under this contract will include; planned preventative maintenance, unplanned repair works, installation of new and certificate submissions to IE Sharepoint document library.
View the procurement »
2022-01-06UCD - Framework Agreements for Building Construction Works (University College Dublin ( UCD ))
UCD (and any wholly owned subsidiary thereof), is issuing this Project Information Memorandum and the accompanying Suitability Assessment Questionnaires (SAQ) in order to obtain information from Applicants to determine their suitability on the basis of financial standing, technical competence and capability, and relevant experience to carry out the projects under these two framework agreements. Separate SAQ’s for each of Lots 1and 2 are included in the accompanying documentation. Applicants should only …
View the procurement »
2021-12-16Kerry - Theatre Extension Project, University Hospital Kerry, Tralee (Health Service Executive (HSE))
The development will consist of the construction of a new single-storey rooftop extension to the existing Theatre Department at first floor level, located on the west side of the campus at University Hospital Kerry, to provide an expanded Theatre Department incorporating two new Operating Theatre Suites, a six-bay Recovery Area, support rooms and new Plant Rooms at first and second floor levels, enclosed escape stairway and associated site works.
View the procurement »
2021-11-22Installation, Testing & Repair of Mechanical Systems and Sub Systems (Iarnrod Eireann-Irish Rail)
This notice replaces RFT 201818, TED Reference 2021/S 215-567070
The provision of a mechanical contractor to undertake planned preventative maintenance and the provision of technical & skilled certified resource’s for all work types including but not limited to: testing, maintaining and repairing of;
• Heating Systems
• Chilled water & CRAC units -HVCA
• Air Conditioning units – F gas
• Building management systems
• Air Handling units
• Ventilation systems
• Domestic Cold water systems
• Domestic Hot …
View the procurement »
2021-11-17Ennis Town Centre Public Realm Regeneration Project B (Clare County Council)
The proposed works represents the second phase of street upgrade works being completed as part of the overall rejuvenation and enhancement programme for Ennis Town Centre. The first phase involved the regeneration of Parnell Street and the extensive network of Lanes and Bow-Ways. This phase, which is funded under the URDF, is scheduled to commence construction in 2022.
View the procurement »
2021-11-05Upgrade of Lighting at Smithfield Square (Dublin City Council)
Dublin City Council is seeking a contractor to:
1. Supply, install and maintain a controllable LED colour changing lighting system for the feature lighting on the masts in Smithfield, replacing the existing CMD fittings.
2. Supply and install Public Realm Lighting scheme to deliver a EN13201 P1 Lighting Class with capabilities for dimming and future CMS integration capabilities. The specification for this scheme is detailed in the Works Requirements in Volume A. There is also a requirement to upgrade …
View the procurement » Mentioned suppliers:Al Read Electrical Company Ltd.
2021-11-037846 - Fire & Security Systems and Sub Systems Maintenance (Iarnrod Eireann-Irish Rail)
The provision of Fire Detection, Alarm Monitoring and CCTV Maintenance Services Examples of maintenance works required will include but are not limited to any of the following:
• Planned preventative maintenance works
• Unplanned ASSET Replacement
• The provision of technical, administrative & skilled personal with transport, associated tools, test equipment and CAD IT terminals.
• The provision of call out and emergency attendances in the event of loss of service or failure of equipment …
View the procurement »
2021-11-01Installation, Testing & Repair of Mechanical Systems and Sub Systems (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified mechanical contractor with the expertise to undertake maintenance, repairs and replacement of mechanical systems and sub systems in safety critical environments such as National Traffic Control Centre, safety critical SET equipment, operational stations, Operational level crossing control centers and public facilities.
The requirements under this contract will include; planned preventative maintenance and the provision of technical & skilled …
View the procurement »
2021-10-11Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022
EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from …
View the procurement » Mentioned suppliers:ESB Generation & Wholesale MarketsHuntstown Power Company Limited
2021-09-28Fixed Broadband and PSTN Services (Fáilte Ireland-National Tourism Development Authority)
Fáilte Ireland wish to engage with a single supplier to maintain and support existing telephony infrastructure. Fáilte Ireland are embarking on a new enhanced telephony solution to deliver Unified Communications using Microsoft Teams which will allow staff receive and make calls without the need for handsets. While this will replace the necessity for BRA’s and PRA’s we will still require some of our existing analogue lines which supports services that require dedicated lines, such as broadband, alarms and lifts.
View the procurement » Mentioned suppliers:eir Business
2021-09-17WCCC 20/190 TRAFFIC SIGNALS, MAINTENANCE & ANCILLARY SERVICES (Waterford City and County Council)
Waterford City and County Council wishes to appoint a suitably qualified and experienced Contractor for the provision of:
• Second-line maintenance service for WCCC traffic control equipment when required;
• To provide on-call repair service as required (normal hours);
• To provide emergency on-call out of hours service to alternate with WCCC electrician (every second week).The required services comprises of:
a) Periodic inspections;
b) Routine maintenance;
c) Fault repairs;
d) Non-routine …
View the procurement » Mentioned suppliers:Civic Integrated Solutions Ltd.
2021-09-10Meeting Room Infrastructure Single Party Framework 21P052 (Raidio Teilifis Eireann ( RTÉ ))
RTÉ plans to rollout Hybrid Meeting Rooms over the next three years, starting with the fit out of up to 37 MS Teams Rooms devices in 2021 and the installation and commissioning of existing systems for a further six. RTÉ is also seeking to enter into a framework agreement with a supplier for future supply and services. RTÉ plan to upgrade a maximum of 100 meeting rooms in that period. The estimated cost is for the duration of the rollout.
View the procurement » Mentioned suppliers:Creative Technology Ireland Ltd
2021-08-2621/007 - Industrial & Commercial Meter Modules (Ervia)
The initial scope of the contract consists of but not limited to; procurement & quality assurance of materials and components, threads, fabrication, welding, non-destructive testing meter modules and materials (including radiography), pressure testing, certification, assembly, painting, delivery and provision of documentation for various gas meter modules.
Each module consists of an inlet valve, gas meter, control valve, filter, pressure regulator (with or without an integral pressure cut-off), relief …
View the procurement »
2021-08-19Electrical Installation: Demolition of the existing school facilities and construction of a new school building and... (Rush National School)
Electrical Installation.
Phased demolition of the existing 1,980m2 single storey Rush National School buildings.
Construction of a new 5,717m2 two-storey school building with complex phasing, requiring
multiple decant, on a live operational campus within the extremely restricted existing school
site. The new school will contain 32 classrooms, a 2 class Special Educational Needs Unit,
general purposes hall, library, resource area, administration and staff areas, storage and
ancillary accommodation. Site …
View the procurement »