Recent procurements of power distribution cables in Ireland
2023-07-178376 - OHLE Maintenance, Repair and Renewal Services (Iarnrod Eireann-Irish Rail)
Iarnrod Éireann requires the services of competent and experienced Overhead Line Equipment (OHLE) personnel suitably equipped to assist its Signalling, Electrical and Telecommunications (SET) Dept. in carrying out its maintenance, repair and renewal programme on the OHLE network. This contract will be set up for 8 years with a option to extend by two more years at Iarnrod Éireann decretion See attached documents for more details
View the procurement »
2022-03-29The Design and Build of 400kV Shannon Estuary Cable Project (Electricity Supply Board ( ESB ))
The Contracting Entity intends to procure a Contract for the Design and Build of 400kV Shannon Estuary Cable Project.
The Contracting Entity requires the manufacture and installation of a 400kV land and subsea cable circuit in the South of Ireland. The new 400 kV cable circuit is required to be installed in the Shannon Estuary and adjoining lands to connect Moneypoint 400 kV Gas Insulated Switchgear (GIS) Substation to a 400kV Air Insulated Switchgear (AIS) compound within Kilpaddoge 220 kV …
View the procurement »
2021-04-29Overhead Line Construction for North-South 400 kV Interconnector under a Multi-contractor Framework Agreement (Electricity Supply Board (ESB))
Electricity Supply Board (ESB) proposes procuring a multi-contractor framework agreement for the installation of a North-South 400 kV overhead line. ESB is undertaking the procurement of the framework agreement on behalf of itself for works in the Republic of Ireland (ROI) and on behalf of Northern Ireland Electricity Networks Ltd (NIE Networks) for works in Northern Ireland (NI) and is the contracting entity for the purposes of this Procurement. The successful contractors to this framework agreement …
View the procurement »
2021-01-19RTÉ MV Switchgear (Raidio Teilifis Eireann (RTE))
RTÉ has a requirement to upgrade its existing TV Block medium voltage switchgear at its Donnybrook site. As part of this upgrade, it is planned to replace the existing MV switchboard as detailed in this tender document. This turnkey project incorporates both Civil and M&E works. A single contractor will be awarded this turnkey project and will be responsible for the Project Management of the project from Contract Award to Practical Completion.
View the procurement » Mentioned suppliers:CJK Engineering
2018-08-22Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in …
View the procurement »
2017-10-31ROV Umbilical (Marine Institute)
At present a requirement exists for the supply, installation and commissioning of a replacement umbilical of 4 300 m for the Institute's deep water ROV Holland 1.
The umbilical will be used with the ROV Holland 1 in a free boating/live boating mode and will require installation on the existing ROV umbilical winch. The tender requires the supply of the umbilical cable, adjustment of the existing winch drum to accommodate a smaller size umbilical, adjustment of spooling mechanism and spooling of the new …
View the procurement » Mentioned suppliers:Soil Machine Dynamics Limited
2016-01-22Cables and Connectors for Marine Test Site (Marine Institute)
The Marine Institute wishes to invite Applicants to submit a tender under an Open Procedure with the objective of putting a Single Supplier Framework Agreement in place for the design, manufacture and supply of Cables and Connector Units for the Galway Bay Marine and Renewable Energy Test Site for a period of 2 years (2016-2018). 1 unit of cables and connector to be delivered by end of August 2016, with additional unit(s) dependant on available funding. The Marine Institute is seeking design, manufacture …
View the procurement »
2015-10-29Framework Agreement for the Supply of Cable (Iarnrod Eireann-Irish Rail)
Iarnrod Eireann is seeking to establish a 4 year multi party framework agreement for the supply of signalling and telecoms cable. The framework agreement will include 3 lots:
1. Signalling Cable;
2. Fibre Optic Cable (Singlemode and Multimode);
3. Telecommunications Copper Cable.
Tenderers may bid for one or more lots. Interested candidates are required to download, complete and return the Pre Qualification Questionnaire attached to this notice.
All queries must be submitted in writing only to …
View the procurement » Mentioned suppliers:See Additional Information
2015-10-29Framework Agreement for Supply of Cable (Iarnrod Eireann-Irish Rail)
IE is seeking to establish a 4-year multi-party framework agreement for the supply of fibre optic cable, telecommunications copper cable and signalling cable. The framework agreement will be split into 3 lots. Tenderers may bid for 1 or more lots. Interested candidates are required to download, complete and return the Pre Qualification Questionnaire attached to this notice. All queries must be submitted in writing to sinead.leonard@irishrail.ie
View the procurement »
2015-05-08Public Lighting and Associated Services Maintenance 2015 (Mayo County Council)
Mayo County Council (the Lead Contracting Authority) is procuring on its own behalf and on behalf of the following local authorities; Galway County Council, Galway City Council, Roscommon County Council, Leitrim County Council and Sligo County Council a contract for the repair, service/maintenance of its public lighting. The successful Tenderer (Contractor) will be required to enter into a contract with each individual local authority once the tender has been evaluated. However, the contracting authority …
View the procurement » Mentioned suppliers:Electric Skyline Ltd
2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-01-12SET/4827/GM - Signalling Cable Framework Agreement (Iarnrod Eireann-Irish Rail)
Irish Rail are looking to establish a multi-party framework agreement with a number of specialised cable suppliers. The contract will cover both fibre optic and copper signallingh cable. Mini-tenders will be issued to the framework as and when cable requirements present themselves to Irish Rail.
View the procurement »
2012-07-20ENQEIR312 - Extra High Voltage (220kV - 400kV) Infrastructure development (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning, consultation and communication services as described below.
EirGrid is to undertake major capital investment in the North West of Ireland as part of the Grid25 strategy, this project is also part of the Renewable Integration Development Project (RIDP). This proposed …
View the procurement » Mentioned suppliers:Mott MacDonald
2011-10-31Electrical contracts relating to Bord Gáis Éireann wind farm development (Bord Gais Eireann)
It is anticipated that the applicants can provide all services outlined in this section.
2.1 Bord Gáis wind farms.
It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all …
View the procurement »
2011-08-11Extra High Voltage (400 kV) infrastructure development in the South West of Ireland (EirGrid plc)
The objective of this pre-qualification questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning & consultation services as detailed below.
EirGrid is to undertake major capital investment in the South West of Ireland as part of the Grid25 strategy. This proposed scheme shall involve development of a 400 kV circuit of approximately 26 km length between Moneypoint 400 …
View the procurement »
2011-07-12Supply of AGL Primary Cable (Dublin Airport Authority plc (DAA))
You are hereby invited to submit a tender for the supply, delivery and off loading of primary cable for Airfield ground lighting at Dublin, Cork and Shannon Airports over 4 years as per the RFP available at www.etenders.gov.ie.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=270632.
View the procurement »
2011-06-02Specialist consultancy framework (EirGrid plc)
EirGrid requires the services of multiple specialist consultants to assist it with the development of the Irish Electricity transmission system assets. This pre-qualification questionnaire provides a description of the services EirGrid wishes to procure, as well as information about the selection procedure to be used.
EirGrid intends to establish a framework for the provision of these services using the following lots;
Lot 1: advice on project feasibility – phase 1 development of transmission assets;
Lot …
View the procurement » Mentioned suppliers:Various suppliers admitted to the 4...Various suppliers admitted to the...
2011-04-01Extra High Voltage (110kV – 400kV) Infrastructure development in the South East Region of Ireland (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the provision of project management, engineering, environmental, planning, consultation and communications services as detailed below.
EirGrid is to undertake major capital investment in the South East region of Ireland as part of the Grid 25 strategy. The proposed scheme shall involve development of Extra High Voltage Electricity Transmission …
View the procurement » Mentioned suppliers:Rps
2011-02-28Multi supplier framework for civil contracts relating to Bord Gáis wind farm development (Bord Gais Eireann)
This pre-qualification questionnaire is issued by Bord Gáis Éireann (“the Client”) for the purposes of providing information to applicants interested in applying to pre-qualify and proceed to the tender stage for the procurement of a framework for the provision of certain civil construction works in connection with the development of wind farms by the client (or any subsidiary of the client).
The anticipated scope of civil works applicable to the framework includes but is not limited to the following …
View the procurement »
2011-02-11Combined Cycle Gas Turbine (CCGT) -Great Island Project - Generator 220 kV Cable Connection (Endesa Ireland Limited)
Endesa Ireland wishes to invite expressions of interest for the design, manufacturing, supply and delivery, installation at site, testing and commissioning of the High voltage (HV) cable for the new Combined cycle gas turbine generating station site in Great Island, Co. Wexford (Ireland).
All the activities will be carried out according to the relevant IEC Standards.
The minimum characteristics required are:
Insulation material XLPE triple extruded.
Material and section of the conductor mm2 CU / 2 …
View the procurement » Mentioned suppliers:NKT CABLES GMBH
2011-01-13Engineering environmental, planning and communications services (EirGrid plc)
Provision of project management, engineering, environmental, planning and communications services for further information please see the information memorandum and PQQ document attached to the notice on www.e-tenders.gov.ie.
Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=191877.
View the procurement » Mentioned suppliers:Tobin Consulting Engineers