2016-06-09Dublin District Heating System — Phase 2 — Engineering, Business and Implementation Strategy (Environment and Transportation Department)
The purpose of this brief is to secure the services of a suitably qualified and multi-disciplinary Economic Operator to examine the engineering, business and implementation strategies for managing, administrating, developing and financing the District Heating System for a specified area in Dublin's Docklands which will recover waste heat and distribute it from plants in the Poolbeg peninsula. The Economic Operator shall be required to make recommendations to management of Dublin City Council in relation …
View the procurement »
2016-05-24TEN-T Priority Route Improvement Project Donegal (Donegal County Council)
Multi-disciplinary engineering and other specialises consultancy services for the delivery of Phases 1, 2, 3 and 4 of the current edition of the National Roads Authority (NRA) Project Management Guidelines and all associated services and deliverables as set out in the Requirements and Particulars of the Tender and Schedule for the TEN-T Priority Route Improvement Project Donegal.
View the procurement » Mentioned suppliers:RPS Halcrow Barry
2016-04-29Extension of St Luke‘s Radiation Oncology Centre at Beaumont Hospital (Health Service Executive (HSE))
A horizontal expansion, of approximately 4 500 sqm [Net Floor Area] over three
[3Nr.] floors to the existing facility;
To provide for departmental adjacencies required, including bunkers for six
[6Nr.] Linear Accelerators and support accommodation;
Provision of on-grade car-parking. The design shall allow for structural
capability of a five [5Nr.] storey structure, to allow for future expansion.
View the procurement »
2015-11-06The Provision of Expert Services for Mine Inspections and Environmental Advice (Department of Communications, Energy and Natural Resources)
The Department of Communications, Energy and Natural Resources seeks the provision of expert services involving the regular physical inspections by suitably qualified personnel of mining operations under State Mining Leases/Licences, to ensure compliance with terms and conditions of those Leases and Licences. In addition, the Department will request on an irregular and as required basis specialist expertise (which may include ecology, hydrogeology, noise etc.) in screening and evaluation of the …
View the procurement » Mentioned suppliers:Wardell Armstrong
2015-10-16Establishment of a multi-party framework agreement for integrated design team services with the back-up of a... (Galway County Council)
The Contracting Authority is seeking to establish a multi-party framework agreement for integrated design team services for the re-mediation of 2 landfill sites, namely Pollboy Landfill, Ballinasloe and the East Galway Landfill, with the backup of a multi-disciplinary environmental consultancy team for the licence reporting and monitoring of the landfill sites. The framework agreement will be established comprising the following disciplines:
(a) Civil and Structural Engineering Services,
(b) Mechanical …
View the procurement » Mentioned suppliers:Fehily Timoney and Company
2015-07-24Environmental Consultancy Services for Capital Works Projects in Dublin Port (including the Alexandra Basin... (Dublin Port Company)
The Contracting Authority, the Dublin Port Company is engaging in a competitive tendering process for the establishment of a multi-operator framework agreement for the provision of environmental consultancy services for the undertaking of environmental management, assessment, monitoring and overseeing of all capital works projects (including the Alexandra Basin Redevelopment Project) in Dublin Port undertaken on behalf of the Dublin Port Company over a 7 year period.
The framework agreement will be …
View the procurement »
2015-07-23N70 Sneem to Blackwater Bridge Road Project — Engineering and Environmental Consultancy Services (Kerry County Council)
The scope of services required by Kerry County Council consists of all services necessary or desirable for the purposeful management and delivery of Phases 3 and 4 of the National Roads Authority (NRA)‘s Project Management Guidelines 2010 (NRA PMG 2010) in relation to the N70 Sneem to Blackwater Bridge Road Project.
The project comprises of the on-line widening / realignment of the existing N70 to provide a Type 3 Single Carriageway Road with cycle facilities over a distance of approximately 4.4 …
View the procurement » Mentioned suppliers:Rps Consulting Engineers
2015-07-10Single Party Framework Agreement Student Residential Accommodation for Grangegorman (Grangegorman Development Agency)
Grangegorman Development Agency invites applications from groupings, consortiums, joint ventures and other entities interested in being considered for a major student accommodation development project. on the Grangegorman Campus. The development consists of 2 100 bed spaces in all, to be provided by a long-term concessionaire as a commercial enterprise. The optimum return on such an enterprise requires that 3 separate phases of bed-space provisions(700, 900, 500 beds respectively) in several blocks …
View the procurement »
2015-04-22Establishment of a single-party framework for an integrated consultancy service for a Spatial Implementation and... (Wexford County Council)
The Contracting Authority is seeking to establish a single-party framework agreement for an integrated multi-specialist consultancy service to deliver a Spatial Implementation Plan and an Economic Development Plan for the revitalisation of the Wexford Quay Area in Wexford Town. The framework agreement will be established with a single economic operator comprising at a minimum the following disciplines:
Spatial and Urban Planning Services;
Economic and Business Service;
Architectural Services;
Cultural …
View the procurement »
2015-01-16Design and construction of 2 no Radiation Oncology centres at Cork and Galway University Hospitals (Health Service Executive (HSE))
Design and construction of 2 no Radiation Oncology centres.
Cork University Hospital (CUH): A new facility of approximately 8 800 square metres (Gross Floor Area) over 3 storeys above ground level, including Bunkers for 7 Linear Accelerators and support accommodation, a Brachytherapy Suite, Shelled Out MRI Suite, 2 no CT Scanners, On-Treatment Support, Technical and Administration support accommodation and associated site works, and University Hospital Galway (UHG): A new facility of approximately 8 000 …
View the procurement »
2014-12-23Multi-Party Framework Agreement for Architect Led Integrated Design Teams (Grangegorman Development Agency)
Grangegorman Development Agency wishes to establish a Multi-Party Framework
Agreement for architect led integrated design teams to provide design and advisory services for an initial and additional call-off contracts for the development of Student Residences and related projects at Grangegorman.
The duration of the framework agreement is four years. For the avoidance of doubt Call-Off Contracts may extend beyond the life of the Framework Agreement.
The initial contract under the Framework is intended to …
View the procurement »
2014-12-11Appointment of various multi-disciplinary consulting engineering and design teams pertaining to the remediation and... (Cork County Council)
The Contracting Authority (acting as agent for the Minister for Agriculture, Food and the Marine in relation to the remediation of Haulbowline Island) is now engaging in a competitive tendering process for the appointment of various multi-disciplinary consulting engineering and design teams pertaining to the remediation and development of Haulbowline Island, Cork Harbour, Ireland.
The requirements are divided into 2 no. lots:
— Lot 1: multi-operator framework agreement for Site Preparation Design and …
View the procurement » Mentioned suppliers:RPS Group Ltd
2014-10-06Engineering Consultancy Services and Coastal Protection Works at Cloughaninchy and Framework (Clare County Council)
Engineering Consultancy Services associated with the construction of approximately 2.2 km of coastal protection centred around rock armour construction and providing protection for residential properties and the local public road network at Cloughaninchy, Quilty, Co. Clare. (“The Project“).
The Project will also be used for establishment of a multiple operator framework agreement for Engineering Consultancy Services for the Coastal and Inland Storm/Flooding Remediation Programme, Clare County Council …
View the procurement » Mentioned suppliers:Arup
2014-08-01Establishment of a Multi Party Framework Appointment of Design, Contract Procurement and Construction Phase... (Port of Cork Company)
The Contracting Entity proposes to engage in a competitive process for the establishment of a multiple supplier framework agreement with a number of service providers for Appointment as Design, Contract Procurement and Construction Phase Technical Advisors.
The tenderer, which is found to be fully in conformance with the tender documentation and the most economically advantageous tender under the award criteria contained in the Invitation to Tender will be identified as the successful tenderer designate …
View the procurement » Mentioned suppliers:Rps
2014-07-30Contract for the Engineering Design, Supply, Installation and Commissioning of Environmental Abatement Equipment (SmartPly Europe Ltd)
The general scope required is all inclusive for the engineering, design, equipment supply, installation, commissioning and documentation for all environmental abatement equipment.
Key features of the scope of supply are as follows:
1) Collection and transport of exhaust gases from Continuous Press (120,000 m³/hr approx.), Press Hall (90,000 m³/hr approx.) and Board Cooler (60,000 m³/hr approx.) to existing Wet Electrostatic Precipitators.
2) Pre-cleaning of the exhaust gas from the Continuous Press …
View the procurement »
2014-06-19Establishment of a single-party framework agreement for integrated design team services for the Pearse's Cottage... (Udaras Na Gaeltachta)
The Contracting Authority is seeking to establish a single-party framework agreement for integrated design team services for the Pearse's Cottage Interpretive Centre Project at Pearse's Cottage in Inbhear, Rosmuc, Connemara, Co. Galway.
The framework agreement will be established with a single economic operator comprising the following disciplines:
(a) Architectural Services (incl. design team lead) and associated specialist skills (see Suitability Assessment Questionnaire),
(b) Civil and Structural …
View the procurement »
2014-06-18Ballymun Boilerhouse Repurpose Procurement of Architect Led Multi-Disciplinary Design Team (Dublin City Council)
The Council requires an architect-led multi-disciplinary design team to provide all architectural and related design and contract management services required to deliver the Ballymun Boilerhouse Repurpose project from statutory approvals stage through to completion on site.
The Council seeks to deliver a design which espouses the following design principles:
— User-centred design;
— Innovation;
— Economy of means;
— Minimising environmental impact and maximising use;
— Inclusion and Universal Design.
View the procurement »
2014-06-12Bantry Inner Harbour Phase 1 - Establishment of an Engineering Service Level Agreement for the Design and... (Port of Cork Company)
The former Bantry Bay Harbour Commissioners had retained RPS Consulting
Engineers to develop a scheme entitled “Bantry Inner Harbour Development”.
A Preliminary report was produced and presented to the Commissioners in February 2011. A redacted version of this report, together with the Site
Investigation factual report is attached in Annex 1.
Planning consent for the project was received from Cork County Council in August 2013 and full details of the planning documentation in relation to the application …
View the procurement »
2014-04-24FRT R&T 14- - Multiparty Framework Agreement for Consultancy Services for Coastal Protection Strengthening and Repairs (Galway County Council)
Galway County Council ('the Contracting Authority') has identified an on-going need for the services of consulting Engineers in connection with the provision of consultancy services in relation to forthcoming works as a result of damage to public infrastructure following the severe weather in January and early February 2014 and for improvements in coastal protection. The areas of work is on the coastal areas of county galway and islands.
GCC proposes to establish and operate a Framework Agreement for the …
View the procurement »
2014-03-03Establishment of a Multi Operator Framework Agreement of four Years' Duration for Multi-Disciplinary Environmental... (Meath County Council)
The Council is engaging in a competitive tendering process for Multi-Disciplinary technical services in respect of Environmental Consultancy Services in the county of Meath.
It is the Council's intention to establish a multi-party framework agreement of four years' duration for the appointment of a multi-disciplinary Environmental Consultancy team. The framework agreement will be established on the basis of a competition for an initial contract, the subject matter of which will be a Tier 2 Environmental …
View the procurement »
2014-02-18Establishment of a Single Operator Framework Agreement for Day to day Landfill Site Management Services Supported by... (Galway County Council)
Galway County Council is engaging in a competitive tendering process for Day to day Site Management Services with the backup of a multi-disciplinary Environmental Consultancy team at East Galway Landfill, Kilconnell, Co. Galway.
It is the Galway County Council's intention to establish a 4 year single-party framework agreement for this appointment. The framework agreement will be established on the basis of a competition for an initial contract which will be Landfill Site Day to Day Site Management …
View the procurement »
2014-02-0714/008 – Technical Specialist Consultancy – Republic of Ireland (Bord Gais Eireann)
This framework will be designed as a multiparty framework agreement with competent entities whose responsibiliites include but not limited to giving advice, examining, analysing and reporting on certain issues that may occur in relation to processes, procedures, materials, risks and incidents within Bord Gáis Networks as required.
View the procurement »
2014-01-23EPAGW2014 - Sampling and Analysis of Groundwater in Ireland (Environmental Protection Agency)
The European Water Framework Directive 2000/60/EC was developed to establish a framework for the protection of inland surface waters, transitional waters, coastal waters and groundwater throughout Europe. The Environmental Protection Agency would like to set up a framework agreement for the sampling and analysis of groundwater (boreholes and springs) in order to satisfy the monitoring requirements of the Water Framework Directive. The consultant will primarily be undertaking groundwater sampling and …
View the procurement »
2014-01-2214/003 - Provision of Archaelogical & Ecological Services to Irish Water (Bord Gais Eireann)
Irish Water (IW) is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Archaeological and Ecological Services to support the provision of water services capital investment. It is envisaged that these services will be carried out in a planned manner where work packages are identified in advance of each call off.
The services will be sub-divided into separate Lots detailed below.
— Lot 1: Archaeological Services
— Lot 2: …
View the procurement »
2013-12-16Architect Led Multi-Disciplinary Design Team Multi-Operator Framework (IDA Ireland)
Provision of full multi-disciplinary design team services led by and incorporating Architectural design service (incorporating Landscape, Interiors, Fire, Acoustics etc)acting and including multi-disciplinary design services for building works for IDA Ireland. The list of specialist skills (in addition to architecture) required as part of the multi-disciplinary design team are: Civil & Strucural Engineering (CS), Techanical & Electrical Services Engineering (ME), Quantity Surveying and Project Management …
View the procurement »
2013-09-25Services in relation to new Cruise Berth, Dun Laoghaire Harbour (Dun Laoghaire Harbour Company)
Multi-disciplinary Consultancy services including all construction consultancy, environmental, and planning services required for the planning, preliminary design, preparation of Environmental Impact Statement and preparation of a planning application for a new cruise ship terminal to accommodate cruise ships at Dun Laoghaire Harbour, Co Dublin. Please refer to attached documentation for further information.
View the procurement »
2013-09-13GDRDP: Rathmines and Pembroke Sewerage Scheme (Environment & Engineering Department, Block 1 Floor 4, Dublin City Council)
The Rathmines and Pembroke Sewerage Scheme Preliminary Design Stage will involve an Engineering Consultant carrying out an investigation of the Rathmines and Pembroke Drainage Catchment to identify hydraulic, environmental, structural, planning, policy and operational issues, and also the updating and re-verification of the hydraulic model of the drainage network and, using this information, the construction of a Sewer Water Quality Model.
It will include the development of possible solutions for …
View the procurement »
2013-08-30Foynes to Limerick Road Improvement Scheme - Engineering Consultancy Services (Limerick County Council)
Limerick County Council requires multi-disciplinary engineering consultancy services in relation to the Foynes to Limerick Road Improvement Scheme. The scheme objective is to provide a high quality road to connect the Port of Foynes with the M7/N18 at Limerick. The existing N69 National Secondary Road connects Foynes to Limerick along approximately 32km of single carriageway.
The commission is to advance the development of the proposed road to completion of Phase 1 (Feasibility), Phase 2 (Route …
View the procurement » Mentioned suppliers:Roughan & O'Donovan – Aecom Alliance
2013-08-23Glashaboy - Glashaboy River FRAM Scheme (Cork County Council)
Glashaboy River (Glanmire / Sallybrook) Flood Risk Assessment & Management Scheme - Engineering & Environmental Consultancy Services - Assess and develop a viable, cost-effective and sustainable Scheme, to allow the design flood event along the Glashaboy River and its tributaries without causing flooding of properties, in so doing protecting against flooding from pluvial, fluvial, tidal and surge.
View the procurement » Mentioned suppliers:Ove Arup & Partners Ireland Ltd t/a Arup