Recent procurements of electrical installation work of electrical distribution apparatus in Ireland
2023-08-15SC 07/23 - Derrygreenagh Power 400/220 kV Substation (Bord na Móna PLC)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the services comprise of the design, procurement, installation, and commissioning of the electrical engineering works in relation to the Derrygreenagh Power TSO substations.
View the procurement »
2021-02-05Electrical Balance of Plant Services — Derryadd Wind Farm (Bord Na Mona)
Bord na Móna Powergen Ltd intends to procure design and build services for the Derryadd wind farm grid connection works.
The scope of works for the proposed contract shall include design, procurement, construction, testing, and commissioning pertaining to the grid connection works as outlined in the below list. It should be noted the below list is non-exhaustive and detailed scope of work will be issued at tender stage.
• civil works for 110 kV contestable substation and IPP MV substation;
• civil works …
View the procurement »
2020-12-18Schools Remediation Programme 3 (Department of Education)
The Minister for Education and Skills (the Contracting Authority), intends to establish a multi-party framework, of suitably qualified and experienced MEP services contractors to deliver works contracts for the MEP remediation and associated works. Remediation works shall be carried out at existing schools across the Republic of Ireland. Applicants should note that further/fewer projects may be carried out under the framework at the discretion of the contracting authority.
View the procurement » Mentioned suppliers:CJK Electrical LtdSensori Facilities Management Ltd
2019-12-06Medium Voltage Switchgear, Generator Protection and Synchroniser Replacement (Electricity Supply Board (ESB))
The contracting entity intends to procure frameworks for the design, supply, installation and commissioning of the equipment in each of the following lots
Lot 1: Design, Manufacture, Delivery, Installation and Commissioning of Medium Voltage Switchgear;
Lot 2: Design, Manufacture, Delivery, Installation and Commissioning of Generator Protection and Synchroniser Panels.
Delivery of the equipment will be to ESB Power Station(s) located in the republic of Ireland. The appointed framework agreement providers …
View the procurement » Mentioned suppliers:Hitachi Energy IrelandNeoDyne
2019-11-25Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
Oweninny Power 2 DAC, the contracting entity, is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The contracting entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project.
Oweninny Phase 2 wind farm is an 83 MW project located adjacent to the existing 89 MW Oweninny Phase 1 …
View the procurement » Mentioned suppliers:H&MV Engineering Ltd
2016-03-24Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package (Curragh Racecourse Ltd)
Contract Phase 1: Enabling Works
The enabling works contract involves the demolition of the existing east and west
grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of
hard landscaping, sections of perimeter walls, removal and disposal of asbestos,
termination and diversion of services, installation of new services such as surface
water and wastewater infrastructure within the main site, felling of a select
number of trees and tree protection.
A specialist requirement under the …
View the procurement » Mentioned suppliers:Murphy International Ltd
2012-11-01LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows:
Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick.
Lot 2 Call Out Electrical Maintenance Works – LIT Thurles.
Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel.
The purpose of the first stage is to obtain information from the applicants to determine their suitability …
View the procurement »
2011-10-31Electrical contracts relating to Bord Gáis Éireann wind farm development (Bord Gais Eireann)
It is anticipated that the applicants can provide all services outlined in this section.
2.1 Bord Gáis wind farms.
It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all …
View the procurement »