Procurements: Electrical installation work of electrical distribution apparatus

>20 archived procurements

Recent procurements of electrical installation work of electrical distribution apparatus in Ireland

2023-08-15   SC 07/23 - Derrygreenagh Power 400/220 kV Substation (Bord na Móna PLC)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the services comprise of the design, procurement, installation, and commissioning of the electrical engineering works in relation to the Derrygreenagh Power TSO substations. View the procurement »
2023-08-03   EV Chargers for EPA (Environmental Protection Agency)
Electric Vehicle Chargers, with a suitable back office solution. View the procurement »
2023-06-29   EV Chargers for EPA (Environmental Protection Agency)
Electric Vehicle Chargers, with a suitable back office solution. View the procurement »
2023-05-02   Electric Vehicle Chargers for Inland Fisheries Ireland (Inland Fisheries Ireland)
Request for Tenders dated 28/04/2023 Single Supplier Framework for the provision of Single Socket 7 kW, 22 kW & 75 kW Base Chargers for Inland Fisheries Ireland View the procurement »
2022-12-21   Mechanical and Electrical & ICT Works Reserved Specialist Contractor Packages for The Old Library Redevelopment... (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the Mechanical and Electrical/ICT Reserved Specialist Works Contractor Packages. The project concerns the construction works located at the University’s city centre campus. The contracting Authority intends to invite 5 candidates to tender for each specialist package, please note that the contracting authority reserves the right to invite at least 5, subject to the number qualifying. View the procurement »
2022-09-02   ATU Single Operator Framework Agreement Call Out Minor Works Under 6 Lots (Atlantic Technological University)
The Contracting Authority Atlantic Technological University ATU Galway Mayo proposes to engage in a competitive process for the establishment of six (6) single-operator framework agreements for general minor works and associated services as follows: • Lot 1: Call Out Electrical Works – ATU Galway City Campuses & iHub Buildings • Lot 2: Call Out Electrical Works – ATU Mayo & iHub Building & Connemara Campus • Lot 3: Call Out Minor Building Works – ATU Galway City Campuses & iHub Buildings • Lot 4: Call … View the procurement »
Mentioned suppliers: BAM FM Ireland Ltd Cosier Homes Limited JOSEPH MONGAN BUILDING CONTRACTORS LIMITED MORAN ELECTRICAL SERVICES LIMITED
2022-05-19   Provision of Energy Metering Systems -RFT 213726-OPW0122 (Office of Public Works (OPW))
Design, Supply, Installation, Commissioning, Setting to Work, Maintenance and Repair of Energy Metering Equipment in Existing Public Sector Facilities throughout the State View the procurement »
Mentioned suppliers: H&F Electrical Contractors Ltd. J Vaughan Electrical Contractors Jones Engineering Powerpoint Engineering Ltd
2022-02-25   Framework Agreement For The Renewal And Replacement Of Mechanical And Electrical Systems (Iarnrod Eireann-Irish Rail)
arnród Éireann requires the services of competent contractors for the supply and installation of new mechanical and electrical systems as well as the upgrade, renewal and replacement of certain mechanical and electrical systems and assets. Iarnród Éireann seeks to establish a multi-party framework agreement for these purposes. The Framework Agreement will be divided into four lots as follows: Electrical Mechanical Fire Systems CCTV and Security Systems View the procurement »
Mentioned suppliers: Colin Burke Electrical Ltd Global Rail Services Limited
2022-01-05   Framework Agreement For The Renewal And Replacement Of Mechanical And Electrical Systems (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of competent contractors for the supply and installation of new mechanical and electrical systems as well as the upgrade, renewal and replacement of certain mechanical and electrical systems and assets. Iarnród Éireann seeks to establish a multi-party framework agreement for these purposes. View the procurement »
2021-12-21   supply and installation of Solar Photovoltaic ( PV) Panels (Lot 1)and Electric Vehicles (EV) Chargers(Lot 2) (Inland Fisheries Ireland)
supply and installation of Solar Photovoltaic ( PV) Panels (Lot 1)and Electric Vehicles (EV) Chargers(Lot 2) View the procurement »
Mentioned suppliers: Heverin Renewable Energies
2021-11-10   Selection of Supplier for Electrical Balance of Plant Services for Derrinlough Wind Farm (Bord Na Mona)
The contracting entity intends to procure design and build services for the Derrinlough Wind Farm grid connection works and selection of supplier for Electrical Balance of Plant Services for Derrinlough Wind Farm. View the procurement »
Mentioned suppliers: H&MV Engineering Ltd
2021-08-16   Selection of Supplier for Cloncreen Battery Energy Storage System (BESS) (Bord Na Mona)
Please refer to document 114_03_03A_CBESS_PQQ_Memorandum in the document folder, for a detailed description under: Part 1 - Background & Instructions to Applicants 1. General Information 1.1 Introduction (page 7) View the procurement »
Mentioned suppliers: FLUENCE Energy
2021-02-18   Electrical Balance of Plant Services for Timahoe Solar Farm (Bord Na Mona)
The contracting entity intends to procure design and build services for the Timahoe solar farm grid connection works. The scope of works for the proposed contract shall include design, procurement, construction, testing, and commissioning pertaining to the grid connection works. View the procurement »
Mentioned suppliers: H&MV Engineering Ltd
2021-02-05   Electrical Balance of Plant Services — Derryadd Wind Farm (Bord Na Mona)
Bord na Móna Powergen Ltd intends to procure design and build services for the Derryadd wind farm grid connection works. The scope of works for the proposed contract shall include design, procurement, construction, testing, and commissioning pertaining to the grid connection works as outlined in the below list. It should be noted the below list is non-exhaustive and detailed scope of work will be issued at tender stage. • civil works for 110 kV contestable substation and IPP MV substation; • civil works … View the procurement »
2020-12-18   Schools Remediation Programme 3 (Department of Education)
The Minister for Education and Skills (the Contracting Authority), intends to establish a multi-party framework, of suitably qualified and experienced MEP services contractors to deliver works contracts for the MEP remediation and associated works. Remediation works shall be carried out at existing schools across the Republic of Ireland. Applicants should note that further/fewer projects may be carried out under the framework at the discretion of the contracting authority. View the procurement »
Mentioned suppliers: CJK Electrical Ltd Sensori Facilities Management Ltd
2020-10-09   Wexford Solar — Solar ICP Works (EDF Renewables Ireland Ltd)
Design, construction and commissioning of three solar farm medium voltage contestable grid connections from project to DNO substation and DNO Embedded Generation Interface Protection equipment. View the procurement »
2019-12-06   Medium Voltage Switchgear, Generator Protection and Synchroniser Replacement (Electricity Supply Board (ESB))
The contracting entity intends to procure frameworks for the design, supply, installation and commissioning of the equipment in each of the following lots Lot 1: Design, Manufacture, Delivery, Installation and Commissioning of Medium Voltage Switchgear; Lot 2: Design, Manufacture, Delivery, Installation and Commissioning of Generator Protection and Synchroniser Panels. Delivery of the equipment will be to ESB Power Station(s) located in the republic of Ireland. The appointed framework agreement providers … View the procurement »
Mentioned suppliers: Hitachi Energy Ireland NeoDyne
2019-11-25   Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
Oweninny Power 2 DAC, the contracting entity, is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The contracting entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project. Oweninny Phase 2 wind farm is an 83 MW project located adjacent to the existing 89 MW Oweninny Phase 1 … View the procurement »
Mentioned suppliers: H&MV Engineering Ltd
2019-05-03   Maintenance of 38kV equipment in Traction Substations (Iarnrod Eireann-Irish Rail)
This is a call to competition by Iarnród Éireann-Irish Rail (“IE”), for the procurement of a suitably qualified Electrical Contractor to carry out maintenance of the 38kV equipment in Traction Substations located throughout the IE Rail Network. View the procurement »
Mentioned suppliers: O'Hara Engineering Services Ltd
2017-09-08   Dublin Airport Static Inverter Upgrade (daa plc)
Please see RFT which is available to download at www.etenders.gov.ie View the procurement »
2017-04-26   Electrical re-wire of Coolmine Community School (Coolmine Community School (Clonsilla))
Electrical re-wire of Coolmine community school and associated builders works. View the procurement »
2017-01-09   Multi-Party Framework Agreement for Electrical Services for Local Authorities (Kerry County Council)
The Local Government Operational Procurement Centre (LGOPC) acting as a Central Purchasing Body (CPB) under the auspices of Kerry County Council is coordinating the establishment of a framework of contractors on behalf of Local Authorities to establish a multi-party framework agreement for the provision of Electrical Services. View the procurement »
Mentioned suppliers: Successful Applicants listed
2016-03-24   Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package (Curragh Racecourse Ltd)
Contract Phase 1: Enabling Works The enabling works contract involves the demolition of the existing east and west grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of hard landscaping, sections of perimeter walls, removal and disposal of asbestos, termination and diversion of services, installation of new services such as surface water and wastewater infrastructure within the main site, felling of a select number of trees and tree protection. A specialist requirement under the … View the procurement »
Mentioned suppliers: Murphy International Ltd
2012-11-01   LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (“the Framework Agreements”) as follows: Lot 1 Call Out Electrical Maintenance & Attendance Works – LIT Limerick. Lot 2 Call Out Electrical Maintenance Works – LIT Thurles. Lot 3 Call Out Electrical Maintenance Works – LIT Clonmel. The purpose of the first stage is to obtain information from the applicants to determine their suitability … View the procurement »
2011-11-30   Single-party framework agreements for general small works and maintenance services (Galway Mayo Institute of Technology)
Galway-Mayo Institute of Technology (GMIT) is based at five locations in the west of Ireland. Full general information concerning GMIT is available on the Institute’s website: www.gmit.ie. GMIT proposes to engage in a competitive process for the establishment of nine (9) single-operator framework agreements for general small works and maintenance service as follows: — Lot 1: Call Out Electrical Maintenance Works – GMIT Galway, — Lot 2: Call Out Electrical Maintenance Works - GMIT Castlebar, — Lot 3: Call … View the procurement »
Mentioned suppliers: Coffey M&E Services t/a Coffey Water Ltd Joe Mongan Building Contractor Ltd John Griffin & Sons Ltd John Higgins Building Contractor Ltd
2011-10-31   Electrical contracts relating to Bord Gáis Éireann wind farm development (Bord Gais Eireann)
It is anticipated that the applicants can provide all services outlined in this section. 2.1 Bord Gáis wind farms. It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all … View the procurement »
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under … View the procurement »
Mentioned suppliers: Denis Moriarty The Kerries Limited