2022-02-2322/003- Water and Wastewater Network Services and Works (WNSW) Sub – contractor List (Irish Water)
Irish Water wishes to appoint a number of Regional Services and Works Contractors (Regional Contractors) to assist in achieving its network improvement targets through targeted capital works. It is expected that these Regional Contractors will require large numbers of sub-contractors to supplement their own resources.
The purpose of this Expression of Interest (EOI) is to establish a list of sub-contractors that these Regional Contractors may choose to appoint over the duration of the project.
This …
View the procurement »
2019-09-27Carrigaline Western Relief Road (Cork County Council)
Construction of a single 750 m carriageway road. The CWRR will run along the southern boundary of Nova Court residential estate, before crossing over the Owenboy River, by means of a 32 m reinfroced concrete river bridge. Current land-use within the CPO lands primarily comprises Greenfield lands; however residential properties and brownfield sites are located in the northern portion of the proposed CWRR route. Pedestrian and traffic lights will be placed at the north, south and central junctions to …
View the procurement » Mentioned suppliers:BAM Civil Ltd
2019-07-01Extension to IDA Infrastructure, Mullagharlin, Dundalk, Co. Louth (IDA Ireland)
The proposed works will comprise of the extension of the existing access road and utility infrastructure to facilitate the development of IDA Ireland’s 44,5 ha site at Mullagharlin, Dundalk, Co. Louth.
The works will include road construction (including 2 No roundabouts), footpaths, drainage, SuDS, foul pumping station (reinforced concrete tank and control building), rising mains, street lighting, utilities, signage, road markings and landscaping including screening mounds, deep excavations/trenchless …
View the procurement »
2018-08-07Cork City Water Supply Scheme Networks Upgrades (Irish Water)
Irish Water is responsible for the treatment and distribution of drinking water in Cork City.
As part of the implementation of a Water Conservation Project for the city, watermains in the network have been identified for rehabilitation. These include watermains that:
— Are not suitably responsive to active leakage control measures,
— Have water quality issues,
— Have reached the end of their service life, and
— Have insufficient hydraulic capacity and are impacting on the efficient operation of the …
View the procurement » Mentioned suppliers:Northstone (NI) Lt T/A Farrans Construction
2018-04-13Cork City and Mallow Network Contracts (Irish Water)
Irish Water is responsible for the treatment & distribution of drinking water & the provision of sewer collection systems in Cork City & Co.
— Lot 1: A number of Combined Sewer Overflows (CSOs) have been identified for removal from the sewer network in Mallow as they are currently in breach of the urban wastewater treatment directive & are the subject of an European Court of Justice (ECJ) infringement notice. The removal of these CSOs will necessitate new trunk sewers to be constructed within the town.
— …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2017-09-05Project Indigo Green — Contract 2 (Irish Water)
The scope consists of water pumping station, watermain, foul sewer rising main, and gas related works as per Part 3 — Scope document.
The works will consist of approximately 4.2 km of 140 mm PE SDR17 foul sewer rising main, 4.8 km watermain of various sizes ranging from 355 mm PE SDR17 to 560 mm PE SDR17, a new water pumping station at Loughsallagh and all associated ancillaries.
The works will also construction and testing of circa 5 km of 315 mm diameter PE100 4 bar gas main and all associated …
View the procurement » Mentioned suppliers:GMC Utilities Group Ltd
2017-04-27Ring Helvick Water Supply Scheme (Irish Water)
Ring Helvick Water Supply Scheme works are:
Connection to the existing water supply network.
new pumping station
2 No. reservoir sites
Installation of a 6 150 m 250 mm rising main with surge vessel
2 No. 150 m³ reservoirs
Construction of a control building
Installation of pumping plant and equipment
Installation of 640 m of 125 mm OD SDR11 HDPE rising from the Lower Reservoir site to the Upper Reservoir site.
Construction of 1 No. 300 m³ reservoir
Installation of 5 970 m of distribution pipework
Civil …
View the procurement » Mentioned suppliers:David Walsh Civil Engineering Ltd
2017-03-23Millstreet WWTP Upgrade Contract (Irish Water)
The Contracting Entity intends to appoint a Contractor who will be responsible for the design, construction and operation, for some elements, of major Civil, MEICA and process works (incorporating associated works and services) at Millstreet WWTP and within the wider agglomeration. These works will be part of Irish Water's Capital Investment Plan.
Please refer to the PQQ documents for further details.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2016-12-13Killybegs and Lettermacaward Regional Water Supply Schemes Project (Irish Water)
Irish Water on behalf of Ervia propose to upgrade two existing Water Treatment Plants (WTP's), an existing raw water impoundment, and a range of associated network infrastructure improvements including service reservoirs, booster pumping stations and pipeline works.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and …
View the procurement »
2016-11-10Letterkenny Regional Water Supply Scheme No 3 — Network (Irish Water)
Irish Water on behalf of Ervia propose to improve the water supply infrastructure in the Letterkenny and Milford regions of County Donegal with the provision of a number of strategic water mains which will enable greater flexibility and efficiency in the use of the existing water resources.
— The Pollan Dam Water Supply network will be extended to supply an existing reservoir in Letterkenny town as Phase 1 of a two phase strategy.
— The Letterkenny WTP supply network will be upgraded to enable a more …
View the procurement » Mentioned suppliers:MEIC Ltd
2016-11-04Bantry to Kealkill Trunk Watermain Project (Irish Water)
Irish Water plans to undertake the construction of the following to deliver water from Bantry to Kealkill:
— Construction of new water mains.
— Replacement of defective water mains.
— Upgrade of river intake works.
— Construction of water booster pumping stations.
— Construct raw water mixing tank.
— Construction of treated water storage reservoirs.
— Associated ancillary works.
View the procurement »
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2016-09-26A Multi Supplier Framework for the Provision of Major Civil Engineering Works for Water, Wastewater and Gas... (Ervia)
Ervia is requesting tenders to establish a multi-supplier framework for the provision of major civil engineering works for Water, Wastewater and Gas (incorporating associated MEICA Works) to Ervia. It is envisaged that each item of works will be requested in a planned manner where work packages are identified in advance of each call off.
The framework is divided into 2 Lots.
Lot 1: Works associated with wastewater treatment, collection systems and ancillaries.
Lot 2: Civil engineering works and networks …
View the procurement »
2016-08-18Skibbereen Regional Water Supply Scheme (Irish Water)
Irish water is undertaking the amalgamation of a number of water supply schemes
formerly known as Schull WSS, Leap/Baltimore WSS Phase 2, Drimoleague WSS
and Skibbereen WSS Stage 4. The facilitation of this amalgamation requires the
construction of Water Treatment Plant upgrades, increased storage in key areas
of the network, network capacity upgrades and mains rehabilitation.
View the procurement » Mentioned suppliers:Electrical and Pump Services Ltd
2016-07-25Howth Balbriggan Kingstown Malahide Water Supply Scheme (Irish Water)
This contract is for the design and construction of an upgrade to the existing water supply network in Howth, Balbriggan, Malahide and between Ballycoolen and Kingstown in Fingal. The works included in this contract include the construction of large diameter water mains, a pumping station, reservoir and ancillary controls and telemetry.
The above is the anticipated scope of the contract but 1 or more of the above schemes may not be included in the tender stage of this competition, and thus may not be …
View the procurement » Mentioned suppliers:John Cradock Ltd/TES NI JV
2016-07-0616/138 — Tuam Regional Water Supply Scheme Extensions Project — Phase 1 Works Contract (Irish Water)
Includes:
—Contractor design and construction of approx 35 km of new watermains at various locations throughout Co. Galway including Loughrea, Dunmore, Glenamaddy, Kilkerrin and Moylough;
—The watermains will range from 140 mm OD (125 mm DN) to 400 mm OD (350 mm DN);
—Contractor design and construction of an approx 1 000 m³ Storage Reservoir;
—Approx 5 no. pressure boosting stations;
—Decommissioning of 5 no. existing WTPs;
—Installation of chlorine monitoring and boosting stations;
—Adjustments to …
View the procurement » Mentioned suppliers:Shareridge/Farrans JV
2016-02-1015/159 — Ballyshannon Regional Water Supply Scheme Contract No 1 — Water Treatment Plant and Primary Network Design... (Ervia)
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains.
The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an …
View the procurement »
2015-09-21Inistioge Water Supply Scheme (Ervia)
The proposed works will include the upgrade of the supply to Grennan WTP with the installation of a new borehole to supplement the existing boreholes, an upgrade to Grennan WTP, installation of 17,62 km of water main from Grennan to the existing reservoir at Ballygub, Inistioge, installation of a new reservoir at Kilmacshane, Inistioge, installation of a booster pumping station at Kilcross, Inistioge and decommissioning of the existing intake and treatment plant at Ballygub WTP, together with associated …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2015-08-06Castlerea and Environs Water Supply Scheme — Phase 1 Ballyhaunis to Garranlahan and Williamstown (Ervia)
Irish Water propose to extend the Lough Mask Regional Water Supply Scheme to supply Castlerea and a number of further towns and villages in Counties Roscommon and Galway. The first phase is to supply treated water from an existing service reservoir in Ballyhaunis County Mayo onward to Garranlahan in County Roscommon and to Williamstown in County Galway. Under the proposals the existing sources would be abandoned and the schemes will be supplied with water from the Lough Mask scheme via Ballyhaunis using …
View the procurement » Mentioned suppliers:BSG Group
2013-12-1013/112 - The Provision of Major Civil Engineering Works (incorporating ancillary MEICA Works) to Irish Water (Bord Gais Eireann)
IW is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Major Civil Engineering Works (incorporating ancillary MEICA Works) to support the provision of water services capital investment. It is envisaged that these works will be carried out in a planned manner where work packages are identified in advance of each call off.
The works will be sub-divided into two separate Lots detailed below.
— Lot 1: Works Associated …
View the procurement »
2013-10-2413/098 - A Multi-Supplier Framework for the provision of Minor Civil Engineering Works to Irish Water (Bord Gais Eireann)
IW is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Minor Civil Engineering
Works to support the provision of water services capital investment. It is envisaged that these Minor Civil Engineering Works will be carried out in a planned manner where work packages are identified in advance of each call off.
The works will be sub-divided into five separate Lots detailed below.
Lot 1: All works and services associated …
View the procurement »
2013-02-26PMWSIS - PMWSIS Contract No. 6 RAL (Laois County Council)
This Contract, Contract No. 6 RAL provides for the construction and maintenance
for a period of 12 months of the following Works:
- Approximately 2.5km of 350mm diameter ductile iron pipeline from
Coolbanagher Production Well 10 (PW 10) to Darkin.
- Approximately 1km of 450mm diameter ductile iron pipeline between
Ballydavis and the existing Kilminchy WTP.
- Approximately 14m of 300mm diameter ductile iron pipeline at the
Coolbanagher borewell location.
- Pipework, Mechanical and Electrical Works …
View the procurement » Mentioned suppliers:Ward and Burke Ltd
2012-06-15Thurles Regional Water Contract No.2 - Treatment & Intake Works Design Build Operate (DBO) Contract (North Tipperary County Council (Utilities))
Expressions of interest are invited from suitably qualified contractors for the design, build, operation and maintenance for 20 years of a new water treatment plant with an approximate capacity of 10 500 m3/d together with 2 No. river intakes, rising mains, pumping stations, sludge dewatering facilities, and associated site and ancillary works.
The works may involve the execution of additional and repetition of similar works and services.
NOTE: To register your interest in this notice and obtain any …
View the procurement »
2011-10-06Wexford Collection System Extension Scheme - Contract No. 1 (Taghmon & Crosstown Ferrybank) (Wexford County Council)
Construction of 3 new pumping stations and associated rising mains and gravity sewers and all ancilliary works, fittings, connections etc. to connect the villages of Crosstown/Ferrybank and Taghmon to the public sewer network in Wexford Town. The works include the construction of approximately 12 500 m length rising mains (varying from 150 mm to 250 mm diameter), approximately 3 000 m length of gravity sewers (varying from 200 mm to 300 mm in diameter) and 50No. manholes associated with the above …
View the procurement » Mentioned suppliers:Shareridge Ltd
2011-08-11Carrickmacross water supply augmentation scheme – design/build & operate contract (Monaghan County Council)
Expressions of interest are invited from suitably experienced contractors who wish to tender for works comprising the design, construction, operation and maintenance for a period of up to 20 years of facilities to abstract water from a number of existing production wells, pumping of the raw water to a new water treatment plant and storing treated water for distribution to the existing distribution network.
Note: To register your interest in this notice and obtain any additional information please visit …
View the procurement » Mentioned suppliers:Veolia Water Ireland Limited
2011-03-22Wexford collection system extension scheme - contract no. 1 (Taghmon & Crosstown Ferrybank) (Wexford County Council)
Construction of 3 new pumping stations and associated rising mains and gravity sewers and all ancilliary works, fittings, connections etc. to connect the villages of Crosstown/Ferrybank and Taghmon to the public sewer network in Wexford Town. The works include the construction of approximately 12 500 m length rising mains (varying from 150 mm to 250 mm diameter), approximately 3 000 m length of gravity sewers (varying from 200 mm to 300 mm in diameter) and 50 No. manholes associated with the above …
View the procurement »