Procurements: Building construction work (page 17)
2019-05-03Architect Led Design Team for new National Learning College at Rehab Group, Park House, Stillorgan (The Rehab Group)
The project consists of the provision of consultancy services — architect led design team which shall include lead architect, conservation architect, structural and civil engineer, quantity surveying, mechanical/electrical services, Project Supervisor Design Process (PSDP), design and assigned certifier and employer’s representative, planning consultancy, traffic management and landscape architect for the proposed development of a new National Learning Network (NLN) College at Rehab Group, Park House, …
View the procurement » Mentioned suppliers:McCullough Mulvin Architects
2019-04-25New 16 Classroom School, St Joseph's National School, Kilcock, Co. Kildare (St. Joseph's National School (Kilcock))
Phased construction project, comprising the construction of new part single storey and part 2-storey school building, approximately 2,905 m, including 16 No. classrooms, 5 No. special education tuition rooms, a multi-purpose room, a library/resource room, a general purpose hall, associated stores, administrative offices, circulation areas and a special needs unit with 2 base classrooms; the demolition of the existing school buildings and all associated site works on a live school site.
View the procurement »
2019-04-2419/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids.
Please refer to PQQ document for scope of works.
View the procurement »
2019-03-22Social Housing Opportunities in Cork City and Cork County (Túath Housing Association Ltd)
As part of the ongoing growth and development of the association, Túath wishes to engage with experienced residential developers, building contractors and/or landowners or agents acting on their behalf, in connection with the procurement of social housing units within Cork City and County
This notice sets out to explore the availability of suitable development opportunities that Túath may procure from the open market on a turnkey acquisition or design and build basis in order to assist in the delivery of …
View the procurement »
2019-03-15Pobalscoil Rosmini (Rosmini Community School), New Post Primary School with PE Hall (Pobalscoil Rosmini (Rosmini Community School))
The development at Pobalscoil Rosmini (Rosmini Community School), will consist of the construction of a new 3-storey post-primary school of 6,786 sqm to provide general classrooms, specialised classrooms, PE Hall, general purpose area, a unit for pupils with multiple disability visual impairment, ancillary accommodation. Photovoltaic panels, at roof level are to be provided to the new school building. The development will also consist of demolition of the existing post-primary school building, including …
View the procurement »
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2019-02-25Construction of a Food Innovation and Incubator Hub Campus (BIA Innovator Campus CLG)
Construction of a food innovation and incubator Hub Campus at Mellows, Teagasc Campus, Athenry, Co. Galway. The Campus consists of the construction of 3 separate buildings: Building 1 — BIA EOLAS/BIA OBAIR — construction of a 2 storey Learning Centre (1 200 m Gross Floor Area), Building 2 H.P.S.U. Units — construction of a single storey building (700 m Gross Floor Area), Building 3 — Incubation Units — single storey building (700 m Gross Floor Area) and general site works.
View the procurement » Mentioned suppliers:Glenman Corporation Ltd
2019-02-22Construction of 112 No. Apartments in Blackpool, Cork City (Cluid Housing Association)
The works consist of the construction of 76 No. general needs apartments and 36 No. sheltered apartments for older residents (with communal facilities) at Blackpool, Cork. The apartments are to be constructed on behalf of Clúid Housing Association and will be used as social housing once complete. The apartments are to be constructed in 5 separate blocks.
The works include the duties of main contractor and PSCS. The existing site is a brownfield sloping site with an unusual profile. Significant associated …
View the procurement »
2019-02-21Clonturk Temporary Accommodation (City of Dublin Education and Training Board)
City of Dublin ETB invites tenders for the construction of 2 storey temporary modular school building and single storey modular changing rooms at Clonturk Community College, Dublin 9.
Tenders for 1 or more of the following 3 options only may be submitted at the discretion of tenderers under this open procedure:
Option 1: 3 year rental and subsequent removal from site (on basis of 36 monthly payments);
Option 2: 3 year rental and subsequent outright purchase by CDETB (on basis of 36 monthly payments and …
View the procurement »
2019-02-15Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following:
A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11.
This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document.
View the procurement »
2019-02-04Technological University Dublin — Tallaght Campus — Sports Science, Health and Recreation Building Development (Technological University Dublin)
The development will consist of:
1) A Sport Science, Health and Recreation Building containing a single storey sports hall and teaching accommodation and associated facilities arranged over 2 storeys plus roof plant areas;
2) A new external landscaped quadrangle, pedestrian areas, footpaths and landscaping, linking existing facilities with the development;
3) Enhanced pedestrian crossing facilities at Greenhills Road access, comprising new raised entry treatment across access and pedestrian refuge island.
View the procurement »
2019-01-31CIT ARENA (Cork Institute of Technology)
A c. 3 200 m 2-storey multi-purpose sports arena with associated changing, fitness suites, meeting rooms and plant level (approx area 3 344 m) and all associated site and services works. The multi-purpose nature of the facility is designed to include sports events, conferences, exams, exhibitions and concerts. The facility is to be located to the south of the existing running track within the main CIT campus located at Rossa Avenue, Bishopstown, Cork.
View the procurement »
2019-01-31Supply of Temporary Buildings (South Dublin County Council)
Supply, delivery and installation of the listed temporary buildings below — including all electrical and mechanical installations — to accommodate 40 people to South Dublin County Council’s Public Realm depot, Tymon Park, Tallaght, Dublin 24
Canteen facility
Toilet block 4
Shower block
Drying room and lockers
View the procurement » Mentioned suppliers:Portakabin Allspace
2019-01-28SEAI Office Fitout (Sustainable Energy Authority of Ireland)
SEAI will relocate their current offices from Wilton Park House, Wilton Place, Dublin 2 to in Three Park Place, Hatch Street, Dublin 2. The proposed works will comprise of all works to complete the fit-out of circa 2 500 m net (between the 3 and 4 Floors) in Three Park Place, Hatch Street, Dublin 2 (the “Premises”) for office accommodation. The fit-out works will consist of construction of a stairs between 3 and 4 floors as well as open plan office space, cellular offices, meeting rooms, training rooms, …
View the procurement » Mentioned suppliers:Flynn Management and Contractors
2019-01-25SEAI Office Fitout (Sustainable Energy Authority of Ireland)
SEAI will relocate their current offices from Wilton Park House, Wilton Place, Dublin 2, to in Three Park Place, Hatch Street, Dublin 2. The proposed works will comprise of all works to complete the fit-out of circa 2 500 m net (between the 3 and 4 Floors) in Three Park Place, Hatch Street, Dublin 2 (the "Premises") for office accommodation. The fit-out works will consist of construction of a stairs between 3 and 4 floors as well as open plan office space, cellular offices, meeting rooms, training rooms, …
View the procurement »
2019-01-23National Train Control Centre (NTCC) — Building Construction (Iarnrod Eireann-Irish Rail)
The National Train Control Centre is a new 5 storey building with partial basement to be constructed at Heuston Station Dublin. This facility will become the signalling control centre for Irish Rail and will also house a number of other third party traffic control centres. The building will be located within a secure compound with a number of car park spaces. Mechanical and electrical systems form a significant element of the building.
View the procurement » Mentioned suppliers:Purcell Construction Ltd
2019-01-23Supply and Installation of Exhibition Production, Installation and Maintenance Services to The Irish National Stud DAC (Irish National Stud DAC)
The Irish National Stud DAC is located at Tully, Kildare, Co. Kildare and incorporates a visitors centre, student quarters, stud office, restaurant, playground building, and numerous farm buildings and remote offices located on the 893-acre farm, with 55 employees on site 5 days a week, and a skeleton staff working weekends.
The contract requires an all-inclusive, multidisciplinary provider to execute the production, installation and maintenance of:
— graphics (including printing on wood substrates),
— …
View the procurement » Mentioned suppliers:Hypsos BV
2019-01-10RFT — Request for Tenders Relating to Contracts for the Provision of Social Residential Housing Schemes (Respond! Voluntary Housing Association)
Respond want to procure development schemes across Ireland which meet the requirements set out in this RFT. Subject to confirmation from the relevant local Authority that there is demand for social housing in the proposed area, the availability of funding and the other requirements of this RFT, Respond! expects to procure an unlimited number of developments. Respond reserves the right to procure the developments in stages if it considers, at its absolute discretion, that this is necessary or desirable to …
View the procurement »
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.