Procurements: Railway maintenance or service vehicles, and railway freight wagons

>20 archived procurements

Recent procurements of railway maintenance or service vehicles, and railway freight wagons in Ireland

2023-01-06   Single Party Framework Agreement for the services of a Designated Body (DeBo) and Notified Body (NoBo) for DART + Programme (Iarnrod Eireann-Irish Rail)
NoBo and DeBo services are required to perform specific assessments and audits as required, to establish the adequacy and rigor of the Interoperability (TSI’s and NNTR’s) for the DART + Programme. In accordance with Interoperability Directive (EU) 2016/797, recognition by the Commission for Rail Regulation (CRR) in Ireland will be a mandatory requirement for this tender, and only vendors recognized by the CRR will be shortlisted and invited to tender. View the procurement »
2022-10-14   Supply of New Wagon Fleet (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement of a new fleet of “type approved” wagons through a Framework Agreement for up to 400 wagons over a 10-year term. IÉ anticipates the initial order will be for approx. 200 wagons wagons including a sub-fleet of up to 30 ore wagons. IÉ is considering operating new wagon fleets at higher speeds & incorporating more efficient & safer technologies e.g., two pipe air brakes, disc brakes , latch / buckeye couplers with integral buffing capability View the procurement »
2022-08-17   Supply of a Containerised Mobile Flash Butt Welder and Support Road Rail Vehicle (RRV) (Iarnrod Eireann-Irish Rail)
The supply of a Containerised Mobile Flash Butt Welder and Support Road Rail Vehicle (RRV). The contract will also include for the necessary training in the operation and maintenance of the machine to In-house Irish Rail staff and external contracting personnel. The winning contractor will be required to participate and co-operate with IE’s safety validation process for introducing new equipment on to IE’s Network. View the procurement »
2022-08-11   Treatment of Surface Rail Defects by Rail Milling (Iarnrod Eireann-Irish Rail)
Treatment of Surface Rail Defects by Rail Milling It is now proposed to again procure the services of an external road/rail vehicle rail milling contractor with suitable equipment and skilled operators to undertake this work. The contractor will also include for all necessary on-shift supervisors, operatives, support staff and support vechicles to carry out the service. All consumables required for the delivery of the service shall be provided by the contractor. View the procurement »
Mentioned suppliers: LINMAG GmbH Linmag International Ltd
2022-07-29   The Purchase of an On-Track Machine (OTM) Tamper (Iarnrod Eireann-Irish Rail)
As part of IE’s strategy with regard to On Track Machines, it is now proposed to commence the pre-qualification process to identify a number of suitably qualified candidates to participate in the tender for the supply of an On-Track Tamping Machine. The contract will also include for the necessary training in the operation and maintenance of the machine to In-house IE staff and external contracting personnel. The winning contractor will be required to participate and co-operate with IE’s safety … View the procurement »
Mentioned suppliers: SYSTEM 7 METAL TECHNOLOGY GmbH SYSTEM 7 RAIL SUPPORT GmbH System 7 Rail Technology GMBH
2022-06-24   AsBo Service- placing into service (Iarnrod Eireann-Irish Rail)
In accordance with RU-SMS-014, the introduction of the B2 cars is deemed to be a ‘Significant’ change and therefore IÉ wishes to appoint an AsBo to undertake an independent assessment of the suitability, correct application and results of the risk management process applied by IÉ to the B2 cars. View the procurement »
2021-07-19   Refurbishments of Infrastructure On-Track Maintenance Machines (Irish Rail)
Iarnród Éireann – Irish Rail is seeking suitably qualified candidates to participate in the tender process for the refurbishment of: • two No 08 Universal Tampers 742 743; • one No 09-2x Plain Line Tamper 744; • one No 08 P&C Tamper 751; and • one No RM 90 Ballast Cleaner 781. It is envisaged that these refurbishment works shall be carried out over a maximum 4-year period and it is intended that only one of these machines shall not be available for service at any given time over the life of the … View the procurement »
Mentioned suppliers: Rhomberg Sersa Ireland Ltd
2021-01-26   Bogie Ballast Plough Wagons (Iarnrod Eireann-Irish Rail)
Iarnród Éireann — Irish Rail is seeking suitably qualified candidates to participate in the tender for the supply of between 1 and 6 bogie ballast plough rail wagons. IÉ may choose to have these wagons delivered in 3 batches of 2, for example: — 2 wagons in year 1, — 2 more wagons in year 2 and a further 2 in year 3. The wagons shall be designed to operate with the existing ‘High Output Ballast System’ (HOBS) wagons, supplied by Wabtec in 2010. View the procurement »
Mentioned suppliers: GEISMAR ITALIA SPA
2020-09-21   Pressing of Front-End Panels for ICR Fleet (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) is seeking to enter into a supply agreement with a specialist company[s] with a demonstrable track record in the pressing of aluminium components or similar products to facilitate the Pressing of Front-End Panels for its Inter City Railcar [ICR] Fleet. IÉ wish to start a replacement programme which will be carried out coinciding with the degraded condition of the front-end panels on the trains. As the panels are overdue a replacement on a significant number of ICR lead cars, this … View the procurement »
Mentioned suppliers: Premier Group Manufacturing (Coventry) Ltd
2020-05-22   Supply and Delivery of an On-Track Railway Ballast Regulator (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the supply and delivery of an on-track ballast regulator. As part of IE’s strategy with regard to on track machines, it is now proposed to commence the pre-qualification process to identify a number of suitably qualified candidates to participate in the tender for the supply of an on-track ballast regulator. The contract will also include for the necessary training in the operation and maintenance of the machine to In-house IE staff and external contracting … View the procurement »
Mentioned suppliers: STMG GmbH (historic name) -new name:... SYSTEM 7 GROUP GmbH SYSTEM 7 METAL TECHNOLOGY GmbH SYSTEM 7 RAIL SUPPORT GmbH SYSTEM 7 RAIL TECHNOLOGY GmbH (Lead...
2019-09-19   Design, Manufacture, Supply, Deliver and Commission Ballast Plough Wagons (Iarnrod Eireann-Irish Rail)
Iarnród Éireann — Irish Rail is seeking suitably qualified candidates to participate in the tender for the supply of 6 ballast plough rail wagons. These wagons shall be designed to operate with the existing ‘High Output Ballast System’ (HOBS) wagons, supplied by Wabtec in 2010. The purpose of the ballast plough wagons is 2 fold: to plough the ballast discharged by the HOBS train and also to supply water for the dust suppression system fitted to the HOBS wagons. The contract will also include for the … View the procurement »
2019-07-12   Supply and Delivery of On-Track Inspection Cars (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the supply and delivery of on-track inspection cars. As part of IE’s strategy with regard to on track machines, it is now proposed to commence the pre-qualification process to identify a number of suitably qualified candidates to participate in the tender for the supply of 2 No on- track inspection cars. The contract will also include for the necessary training in the operation and maintenance of the machine to In-house IE staff and external contracting … View the procurement »
Mentioned suppliers: Geismar
2019-05-03   Maintenance of 38kV equipment in Traction Substations (Iarnrod Eireann-Irish Rail)
This is a call to competition by Iarnród Éireann-Irish Rail (“IE”), for the procurement of a suitably qualified Electrical Contractor to carry out maintenance of the 38kV equipment in Traction Substations located throughout the IE Rail Network. View the procurement »
Mentioned suppliers: O'Hara Engineering Services Ltd
2019-05-02   Supply and Delivery of an On-Track Railway Ballast Regulator (Iarnrod Eireann-Irish Rail)
As part of IE’s strategy with regard to on track machines, it is now proposed to commence the pre-qualification process to identify a number of suitably qualified candidates to participate in the tender for the supply of an on-track ballast regulator. The contract will also include for the necessary training in the operation and maintenance of the machine to In-house IE staff and external contracting personnel. View the procurement »
2019-05-02   Supply and Delivery of a Rail Mounted Crane (Iarnrod Eireann-Irish Rail)
As part of IE’s strategy with regard to on track machines, it is now proposed to commence the pre-qualification process to identify a number of suitably qualified candidates to participate in the tender for the supply of a Rail Mounted Crane. The contract will also include for the necessary training in the operation and maintenance of the machine to In-house IE staff and external contracting personnel. View the procurement »
Mentioned suppliers: Kirow Ardekt GmbH
2018-03-12   Rescue Cradle(s) for on Track Machines (Iarnrod Eireann-Irish Rail)
Iarnród Éireann currently operate a fleet of self-propelled On Track Machines (OTM’s). They are looking for a suitably qualified company to supply a rescue cradle(s) that will facilitate the recovery of an OTM in the event of an axle seizing on one of its fleet of OTM’s. Applicants interested in participating in the procurement process are required to complete and return the Pre-Qualification Questionnaire (PQQ) which is appended to this notice. View the procurement »
2017-09-22   Luas Operations and Maintenance Contract (National Transport Authority (NTA) and Transport Infrastructure Ireland (TII))
The scope of the Luas Operations and Maintenance (O&M) Contract will include the following to be performed by the Operator: operation of public light rail passenger services, rolling stock maintenance, infrastructure maintenance (e.g. depots, track, etc.) and management and operation of Luas Park and Ride sites. Maintenance of the automatic fare collection system (AFCS) will also be within the scope of the O&M contract. However, TII intends to procure a separate contract for the maintenance of the … View the procurement »
Mentioned suppliers: Transdev Dublin Light Rail Ltd
2016-09-05   Maintenance of Ni-Cad Batteries (Iarnrod Eireann-Irish Rail)
IE wishes to procure the services of a suitably experienced company capable of overhauling and maintaining trainset Batteries on all IE's fleets including Electric Multiple Units (EMUs) and Diesel Multiple Units (DMUs), Carriages and Locomotives. It is anticipated that the proposed contract will run, subject to performance, for a three year period with the option, solely at IE's discretion, for an additional period of twelve months. The successful tenderer will be required to collect Batteries from one … View the procurement »
Mentioned suppliers: HBL NiCad Batteries (UK) Ltd
2016-09-01   Supply of Bogies and Bolsters for 071 Locomotives (Iarnrod Eireann-Irish Rail)
IE seek to procure new bolsters and bogies for the 071 locomotive fleet. The 071 fleet consists of eighteen (18) locomotives, primarily used for freight services on the Irish Rail network. These locomotives are a 6 axle configuration, originally supplied by General Motors Electromotive Division in 1976 and classified as EMD JT22CW series diesel-electric locomotives. The bogies and bolsters are of cast steel construction and support safety critical bogie components such as brake gear, traction motors, … View the procurement »
2016-06-30   Weed Spraying System (Iarnrod Eireann-Irish Rail)
The contract which is the subject of this competition is a contract for the supply of a Weed Spraying System which shall be designed to fit on an existing self-propelled Multi-Purpose Vehicle (MPV). The MPV will be supplied by Iarnród Éireann. View the procurement »
Mentioned suppliers: Geismar (UK) Limited
2015-10-13   Track Recording Vehicle (TRV) and associated Recording Systems (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IE) are seeking expression of interest from suitably qualified companies to participate in the pre-qualification process for a tender for the design, manufacture, supply, delivery, testing and commissioning of a Track Recording Vehicle and associated Recording Systems. View the procurement »
Mentioned suppliers: Société des Anciens Établissements L. Geismar
2015-07-20   Wagons (Bord Na Mona)
Bord na Mona is currently seeking tenders from suitably qualified companies for the fabrication and delivery of 30 rail wagons used in the haulage of peat along its narrow gauge rail line. View the procurement »
2015-06-05   Adhesion Enhancing Wheel Rail Sanding Systems for 201 Locomotive and 2600 DMU Fleets (Iarnrod Eireann-Irish Rail)
Iarnród Éireann Irish Rail (IÉ) seeks to appoint a competent company to supply 1 or both Adhesion Enhancing Wheel Rail Sanding Systems (Lots). The successful tender/s will also be required to design and install the system onto 1 of each fleet for testing and approval. View the procurement »
Mentioned suppliers: Knorr-Bremse Rail Systems (UK) Limited