2018-11-30Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.
The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in …
View the procurement »
2018-11-29SWSOS Site Upgrades (Ervia)
Scope includes for the design, construction, testing, commissioning, maintenance, and ultimately handover of upgrades to security systems and enhancements at a number of two existing Gas Transmission Stations and two existing compressor stations in Scotland. The upgrade works will include the installation of extensive (>1 km) lengths of high specification security fencing and gates, incorporating PIDs, electric toppers and associated security lighting, CCTV and video analytics. Ancillary upgrade works …
View the procurement »
2018-11-29St Mary's Secondary School, Ballina, Co. Mayo (St. Mary’s Secondary School (Ballina))
The construction of 43 No. classroom secondary school, multi-use hall and ancillary rooms, GP hall/dining room, ancillary teaching and staff accommodation. The external works include 4 No. hard play courts, car parking spaces, entrance road, path to McDermott Street, boundary treatments, connections to public utility and drainage services, and associated site development works.
View the procurement »
2018-11-26St. Laurence O'Toole School Extension and Conservation, Seville Place, Dublin 1 (St. Laurence O’Tooles National School (Dublin))
"The amalgamation of St. Laurence O’Toole’s Girls N.S. with St. Laurence O’Toole’s Junior Boys N.S, 2 heritage school structures located within a confined site containing the protected structure of St. Laurence O’Toole’s Church (Ref: 7495). In order to do this it is required as part of the contract to construct a 2-Storey 10 classroom prefabricated temporary school (c. 712 m) to decant the students at a nearby site. The main school buildings have protected structure status as they are situated within the …
View the procurement »
2018-10-3029 No. Housing Units (Túath Housing Association Ltd)
a) 29 No. residential units comprising of:
(i) 8 No. 1 bed semi-detached dwellings: single storey buildings;
(ii) 1 No. detached single storey universal 1 bed houses;
(iii) 4 No. 2 storey, 2 bed houses;
(iv) 12 No. 2 storey, 3 bed houses; and
(v) 4 No. 2 storey 3 bed universal houses houses; with (v) renewable energy design measures for each residential unit; and
b) supporting development works including:
(i) public green space connecting to the existing parks;
(ii) CCTV infrastructure;
(iii) pedestrian …
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Electrical subcontractors (reserved specialist to the main appointed contractor) for electrical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement »
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Mechanical subcontractors (reserved specialist to the main appointed contractor) for mechanical installation for the removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the Local Authority’s Record of Protected Structures, the …
View the procurement » Mentioned suppliers:Murphy & Kelly (Thomastown) Ltd.
2018-10-12Blackwater Community School (Blackwater Community School (Lismore))
Removal of 2x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19,6 m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the local authority’s record of protected structures, the provision of a new 1 231,5 m single storey post primary school extension, the provision of a new 3 312,3 m 2-storey …
View the procurement » Mentioned suppliers:Tom O'Brien Construction Ltd
2018-10-11Updrading and Extension Works (Camphill Communities of Ireland (Kildare))
The Etender consists of retrofitting an old stone building for installation of a 3 cow tandem milking parlour with an adjacent yogurt processing area, new fit out and extension to an existing farm shed, adding new ancillary rooms and facilities, new slatted tank, new livestock handling area, laying new foul and storm drainage, new concrete yard and construction of a 12 car park in a green field. The Etender is to be broken down and priced in 5 parts as per Drawing No. 200 (Proposed Master Plan).
View the procurement »
2018-10-08Colaiste De Lacy — Extension to School (Louth and Meath Education and Training Board (LMETB))
Extensions to School to include a 2 storey east block comprising of:
— PE Hall,
— gym,
— changing facilities,
— 4 specialist classrooms,
— 3 general classrooms, and
— office with sanitary and ancillary accommodation.
A 2 storey west block comprising of:
— 17 general classrooms,
— 4 specialist classrooms,
— library,
— offices,
— staff room,
— pedestrian link with sanitary and ancillary accommodation.
Existing internal renovations to coincide with the new extension to provide 1 general classroom, 1 …
View the procurement »
2018-10-04Garda Security and Crime Operations Centre, Military Road, Dublin 8 — Main Contractor (Office of Public Works (OPW))
The development is a 6 and 4-storey building over a double basement, 10 060 sq.m in area with an approx. 9 275 sq.m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference …
View the procurement » Mentioned suppliers:John Paul Construction Ltd
2018-10-03Maynooth University Refurbishment of Existing Arts Building (Maynooth University)
The Works Contractor contract defined as the Refurbishment of the existing Arts Building of 4 700 m accommodation which may be delivered over 2 phases. Phase 1 is circa 1 390 m which provides for reconfiguration of existing offices into modern teaching spaces and courtyard. Phase 2 is circa 3 310 m which provides reconfiguration of existing toilets, office space into modern teaching spaces. Works also include provision of new courtyard and works to existing mechanical and electrical systems.
View the procurement »
2018-10-02Kanturk National School (Office of Public Works (OPW))
Construction of a new 2-storey primary school with a total internal floor area of 3 253 m on a green field site, consisting of 16 No. classrooms, a general purpose hall, library, support accommodation, a 3 No. classroom special needs unit/ASD unit and all ancillary works. This includes for the provision of 37 No. on-site car parking spaces and 3 No. disabled parking spaces, vehicular access roads, set down area, pedestrian access pathways, ball courts, play areas, bin store, bicycle shelters, oil storage …
View the procurement »
2018-09-25construction of a New Railway Station and Pedestrian Footbridge Over the Royal Canal at Pelletstown (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE to award a contract for the construction of a new railway station at Pelletstown, located mid-way between Broombridge and Ashtown Stations on the Connolly to Maynooth Line, plus the construction of a pedestrian footbridge with access steps and ramps over the Royal Canal.
It is anticipated that works will commence on site in May 2019, with an estimated completion date of November 2020.
A pre-qualification questionnaire is attached to this notice and must be downloaded, …
View the procurement » Mentioned suppliers:John Sisk and Son (Holding) Ltd
2018-09-21Cahir Schools Amalgamation (Scoil Naisiunta Mhuire Na Trocaire)
Demolition of the existing single storey Our Lady of Mercy Girls Primary School, GP Room and Classroom Annex building, together with the demolition of 3 No. x existing single storey prefabricated buildings and the construction of a new 3213 sqm part single storey, part two storey 16 No. x Classroom Primary School, incorporating an integrated 2 No. x Classroom Special Needs Unit, a GP Room and all associated support accommodation, together with all associated site development, including new pedestrian and …
View the procurement » Mentioned suppliers:Townmore
2018-09-21Maynooth University Academic Building New Construction (Maynooth University)
The Works Contractor contract defined as the Academic Building New Construction comprises the new construction of 10,554 m accommodation which may be delivered across a single or 2 phases. Phase 1 is circa 5,287 m which provides for teaching spaces predominantly on ground and first floors with offices, reading and support spaces on second and third floors. Enclosed plant space is located at fourth floor. The main objective of the competition is the Phase 1, with the option to proceed with Phase 2, …
View the procurement » Mentioned suppliers:JJ Rhatigan and Company
2018-09-20Conleth’s Infant School and ST. Conleth and Mary’s Primary School (St. Conleth’s Infant School and St. Conleth and Mary’s Primary School)
The refurbishment and extension of the Primary School will consist of: New 2 storey building providing 9 classrooms and support spaces. Reconfiguration and refurbishment of 5 classrooms and associated support spaces in existing school building.
The refurbishment and extension of the Infant School will consist New 2 storey building providing 9 classrooms and support spaces. A General Purpose Hall and support spaces. Reconfiguration and refurbishment of 7 classrooms and associated spaces in existing school …
View the procurement »
2018-09-20St Marys Boys National School – Maynooth (St Marys Boys National School)
The development will consist of a new 3 storey replacement Primary school building with 24 classrooms including Special Needs Unit with associated car parking, bicycle parking, bus drop off, 3 no. Ball courts, existing astro pitch, Sensory Garden, bin compound and site boundary treatment with landscaping to include external perimeter pavement and road improvement works in conjunction with the Maynooth town corridor study. The total floor area of the new school will be 4 748 m.
View the procurement »
2018-09-20Louth County Council — Clanbrassil Street and St. Nicholas' Quarter Rejuvenation Scheme, Dundalk, Co. Louth (Louth County Council)
Louth County Council intends to undertake public realm improvement works on Clanbrassil Street and St Nicholas Quarter in the heart of Dundalk Town Centre, which are the main thoroughfares to and from the Town Centre.
It is expected that the contractor will not have vacant possession of the entire works areas at any one time and that the works will be carried out in phases/stages in order to ensure that any disruption to local businesses, pedestrians, vehicular traffic and local residents will be minimal.
View the procurement » Mentioned suppliers:John Cradock Ltd
2018-09-17Mechanical Subcontractor (Reserved Specialist) for Scoil Mhuire Gan Smál (Scoil Mhuire Gan Smal (Blarney))
Mechanical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Mechanical installation for a new three-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and …
View the procurement » Mentioned suppliers:Dominic O'Connor Ltd.
2018-09-17RS Electrical — Construction of a new 3-storey Post-primary School Building (Scoil Mhuire Gan Smal (Blarney))
Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for Electrical installation for a new 3-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and …
View the procurement » Mentioned suppliers:O KEEFFE ELECTRICAL
2018-09-17Construction of a New 3-storey Post-primary School Building (Scoil Mhuire Gan Smal (Blarney))
Construction of a new 3-storey post-primary school building comprising classrooms, science laboratories, specialist teaching spaces, library, offices, PE hall, changing rooms, fitness suite, general purpose room, special education needs unit, administration rooms, stores, toilets, ancillary spaces, external store, ballcourts, bus set-down areas, surface car parking, boundary walls, fences, vehicular and pedestrian access gates, rerouting of existing overhead ESB lines underground, drainage works, …
View the procurement » Mentioned suppliers:MMD Construction Cork Ltd.
2018-09-03Framework for Architectural Building and Civil Works Including Residential and Other Building Works for Galway City... (Galway City Council)
Galway City Council intends to set up a Framework Agreement list for suitable Contractors who will tender for architectural built and civil works from a maximum 4 year period, likely ranging from initial 3+1 potential further year, if satisfactory.
This would mean a Framework Agreement duration of an initial 3 calendar years (2019 – 2021) with a Contracting Authority unilateral option to extend a further or calendar year (2022).
The Architect’s Department of the Galway City Council, propose to engage in …
View the procurement »
2018-09-03Expressions of Interest and Pre-qualification Questionnaire for the Commercial Development and Operation of The... (South Dublin County Council)
South Dublin County Council intends to award a Development agreement to the preferred bidder in respect of the development and operation Commercial development and operation of a c 0,35 HA site at ‘The Castle Stables and Courtyard at Rathfarnham’, Dublin 14 which shall include design, finance and construction. Upon satisfaction of the conditions set out in the Development agreement, South Dublin County Council intends to enter into a Long Term Lease Agreement for one hundred and fifty (150) years with …
View the procurement »
2018-08-22LIT Single Operator Framework for Coonagh Internal Fit-Out (Limerick Institute of Technology)
Single Operator Framework for selected works at its new campus located at Coonagh Cross Shopping Centre. The Framework works may include, but are not limited to:
— General Building Works,
— Extensions, Demolitions and Alterations to and of Existing Structures,
— Construction of New Buildings,
— Repair and Refurbishment of Existing Buildings,
— Mechanical and Electrical works through reserved specialist subcontractors,
— Minor Civil Engineering Works,
— Miscellaneous Maintenance Projects.
The works …
View the procurement »
2018-08-13Dunboyne Junior + Senior National Schools (Dunboyne Junior + Senior National School)
Expressions of Interest are invited from suitably qualified Main contractors who wish to be considered for the refurbishment and extension to existing Dunboyne Junior school building.
Demolition of the existing and construction of the new Senior school building.
Removal of existing prefabricated structures, new road/ footpath and car park arrangement, landscaping and all associated works.
This is a phased development as this is a live site. The day to day operation of the school must be maintained at all …
View the procurement »
2018-08-035Nr. National Frameworks (Multiple Operator) for Design Team Services 2018 (Health Service Executive (HSE))
4Nr. National Frameworks and 1Nr. Regional Framework for Design Team (DT) Services 2018 having 6Nr. Principal DT Disciplines:
1) Architect Services (including Planning Consultancy Services);
2) Quantity Surveying Services;
3) Building Services Engineering (M&E) Services;
4) Civil/Structural Engineering Services;
5) Fire Safety Consultancy Services; and
6) Independent Project Supervisor Design Process (PSDP) Services.
View the procurement »
2018-07-2460 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development.
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »
2018-07-19Specialist office fit-out works for IDA Ireland at Three Park Place,Upper Hatch St, Dublin 2 (IDA Ireland)
The proposed works will comprise the fit-out of circa 5 600 m net (between the 3 and 8 Floors) in Three Park Place, Hatch Street, Dublin 2 (the "Premises") for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.The main building works (shell and core and CAT A works) are complete. The works are to be completed by the end of June 2019 to allow …
View the procurement » Mentioned suppliers:John Sisk and Son (Holdings) Ltd