2019-03-25RFT for Integrated PM Team (Limerick 2030 Strategic Development DAC)
The client is seeking project management services for Phase 1 and Phase 2 of the development. The PM Service will include the cost management, employer's representative, assigned certifier and PSDP under a single point responsibility appointment.
The entire development is the subject of a planning application being made directly to An Bord Pleanala.
View the procurement »
2019-03-15Design Consultancy Services Lahinch Sea World and Leisure Centre (Lahinch Seaworld PLC)
Lahinch Sea World and Leisure Centre (the “Authority”) now wish to appoint a design team for extension and refurbishment works at Lahinch Sea World and Leisure Centre. The following design team services are required:
Lot 1: Integrated Design Team;
Lot 2: Project Manager and Quantity Surveyor.
Consultants for Lot 1 must include as part of their Application the following principal services:
1) Lead designer;
2) Architect;
3) Civil/Structural engineer;
4) Mechanical and electrical engineer;
5) Renewable …
View the procurement » Mentioned suppliers:McKenna Consulting EngineersTom McNamara and Partners
2019-03-12Proposed Housing Development at Railway Terrace, Mullingar, Co. Westmeath for Westmeath County Council (Westmeath County Council)
You are invited to submit a fee proposal in respect of a fully integrated design team services for a development of social housing at Railway Terrace, Mullingar, Co. Westmeath for Westmeath County Council.
The subject site is located on the Clonmore Road in Mullingar.
The site measures circa 1,45 hectares (3,58 acres). There are 2 protected structures on the site, a dilapidated 2 storey residential terrace and an engine shed to the rear. Both structures are of masonry construction. The proposed …
View the procurement »
2019-02-19The Provision of Pipeline Inspection Services to Gas Networks Ireland (GNI) (Ervia)
Background.
Management of the gas pipeline network is a sophisticated 24-hour operation. GNI wish to put in place a framework agreement with suitably experienced and competent service providers, to provide pipeline inspection services to support GNI pipeline safety management.
As per PQQ doc.
View the procurement »
2018-06-25Provision of Infrastructure Director Services in relation to BusConnects (National Transport Authority)
The National Transport Authority requires the provision of the services of an experienced engineering manager, with significant expertise and experience in programme management for the statutory planning, procurement, and construction of a portfolio of complex major public road infrastructure projects. The Infrastructure Director would be expected to be a Chartered Civil Engineer (or equivalent) with a minimum of 7 years' experience in a senior level engineering or management role, and with substantial …
View the procurement » Mentioned suppliers:JMP Consulting Ltd
2018-04-27Appointment of Architect and Design Team (Shannon Commercial Properties DAC)
Shannon Commercial Enterprises DAC strategy under this appointment is to design and gain planning approval for both the phase 1 and phase 2 developments as outlined below with associated provision for car parking and ancillary site development works as well as construction procurement and management for the Phase 1 buildings only, along with the provision of a full time Resident Engineer for the construction period. The square footage is approximate and may vary up or down depending on final design. It …
View the procurement » Mentioned suppliers:— Neill — Malley Ltd
2017-11-13FCC/199/17 Establishment of a multi-operator Framework Agreement for Consultant Engineering Services for Development... (Fingal County Council)
FCC intends to set up a framework of Consultant Engineers to
tender for the provision of Engineering Consultancy Services on Development Resolution Projects of a general nature up to an estimated value of 1 000 000 EUR ex. VAT.
This will involve surveying and examining the condition of all the infrastructure in Developments, designing remediation and establishing cost estimates to bring all infrastructure up to FCC taking in charge standards.
The consultants will be required to provide professional …
View the procurement »
2016-12-09Provision of 70 No. Rapid Delivery Housing units in Dublin City Council's administrative area (Dublin City Council)
Dublin City Council invites Expressions of Interest for the provision of 70 no. 2-storey rapid delivery housing units on three sites at Cherry Orchard — Ballyfermot, Woodbank Drive — Finglas, and Rathvilly Park — Finglas to include:
(a) Design, Manufacture, Supply, Delivery of 70 units to site.
(b) Site works including, but not restricted to: site preparation, foundations and ground floor slabs, site services and connections to utility services, boundary treatments, hard and soft landscaping.
(c) …
View the procurement » Mentioned suppliers:ABM Design and Build Ltd
2016-10-03Multi-Party Framework Agreement for the provision of Engineering Consultancy Services at Dublin Port (Dublin Port Company)
The scope of the framework agreement is for Engineering Consultancy Services at Dublin Port Estate and other lands including but not limited to the following:
— Civil;
— Marine;
— Structural;
— Mechanical;
— Electrical;
— Environmental;
— Planning;
— Traffic / Transport;
— Architectural Services;
— Archaeology;
— Landscape;
— Conservation;
— PSDP;
— Fire safety Consultant;
— Building Control Amendment Regulations — BCAR;
— Design Certifier;
— Assigned Certifier;
— Disabled Access Certificate — DAC;
— …
View the procurement »
2016-09-30Harley Street Pedestrian/Cycle Bridge, Cork City Centre (Cork City Council)
The proposed bridge will traverse the North Channel of the River Lee between the
existing Brian Boru Bridge and St. Patrick's Bridge in Cork City Centre. The
purpose of the proposed structure is to improve pedestrian and cycle connectivity
between St. Patrick's Quay and Merchant's Quay, thereby improving the links
between the City Centre, MacCurtain Street, Kent Railway Station and the
surrounding areas. The design must include crossing facilities to the north and
south of the proposed bridge and related …
View the procurement »
2015-12-18Provision of Rapid Delivery Housing Units in Dublin City Council Administrative Area for completion on site by 30.6.2016 (Dublin City Council)
Dublin City Council invites Expressions of Interest for the provision of rapid delivery housing units in 4 no project Lots, within Dublin City Councils administrative area.
The 2 storey dwellings will provide a housing mix of 1 bedroom-2 person units,
2 bedroom -4 person units and 3 bedroom-5 person units and will include:
— Design, Manufacture, Supply and Delivery of units to site;
— Associated site works including but not restricted to site preparation, foundations and ground floor slabs, site services …
View the procurement »
2015-10-12Appointment of Architect and Design Team Commercial Office Property Development Project (Shannon Commercial Properties)
The initial infrastructure in SFZ West was installed and the 1 buildings were erected on Shannon Free Zone in 1958/1959. The area has undergone continuous development since then with the result that facilities now range in quality from the most modern office complexes, advanced manufacturing, offices and warehouses to basic 1960's style north light factory buildings. Demand for the vacant north light style buildings has weakened and appropriate regeneration is now required.
View the procurement »
2015-07-03Appointment of design consultant industrial / commercial property development project (Shannon Commercial Properties)
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant (Architect) to deliver and manage all consultancy services required to carry out a full detailed design which will then form the basis for the tender for construction. Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant …
View the procurement »
2015-05-26Appointment of Design Consultant Industrial Building Upgrade and Refurbishment Project (Shannon Commercial Properties)
The proposed project will include the upgrade and refurbishment of industrial buildings at Bay 37 Shannon Free Zone.
The key aim of the project is to proceed immediately with the planning, design and upgrade of a large industrial building with all associated site development and building modification works.
Shannon Commercial Properties strategy is for an employer-designed (traditional) project whereby the contracting authority will engage the services of a design consultant to deliver and manage all …
View the procurement »
2014-12-11Appointment of various multi-disciplinary consulting engineering and design teams pertaining to the remediation and... (Cork County Council)
The Contracting Authority (acting as agent for the Minister for Agriculture, Food and the Marine in relation to the remediation of Haulbowline Island) is now engaging in a competitive tendering process for the appointment of various multi-disciplinary consulting engineering and design teams pertaining to the remediation and development of Haulbowline Island, Cork Harbour, Ireland.
The requirements are divided into 2 no. lots:
— Lot 1: multi-operator framework agreement for Site Preparation Design and …
View the procurement » Mentioned suppliers:RPS Group Ltd
2014-09-26Institute of Education Building Programme, Block E Roof Extension professional consultancy services for project... (Dublin City University (DCU))
The services relate to DCU Institute of Education Building Programme — Block E Roof Extension at St Patrick's College, Drumcondra. In addition it is noted that additional ancillary works may be instructed during the Project.
Overview 1.1
(1) The scope comprises all services required of:
(a) The Employer's Representative under the Public Works Contracts (COE and CF1); and
(b) the Project Management of the Project including the management of the Project Team i.e. the Integrated Design Team (‘IDT’), the …
View the procurement »
2014-05-28Integrated Client Team Services for project development of an Interpretive Centre in proximity to Pearse's Cottage,... (Udaras Na Gaeltachta)
The Contracting Authority is seeking to establish an integrated Client Team for the development of an Interpretive Centre at Pearse's Cottage in Inbhear, Rosmuc, Co. Galway.
The integrated team must comprise the following disciplines:
(a) Project Management and Employer's Representative (lead)
(b) Quantity Surveying and
(c) Project Supervisor for the Design Process
Only those Candidates capable of delivering all of the services listed above
(whether in-house or as a grouping/consortium) will be …
View the procurement » Mentioned suppliers:Aecom
2014-01-0914/002 - Engineering Servies Contract - UK (BGE UK Ltd)
BGE UK Ltd is tendering a range of consulting and project management engineering services. These engineering services will be sub-divided into 4
separate Lots which are detailed below:
Lot 1 - Large Gas Specific Design Services.
Lot 2 - Construction Supervision & Project Management of Pipelines & Installations in the UK.
Lot 3 - C&I Design including conceptual, preliminary and detailed design of new installations and upgrade of existing BGN installations.
Lot 4 - Compressor Stations Design, Project …
View the procurement »
2013-08-23Glashaboy - Glashaboy River FRAM Scheme (Cork County Council)
Glashaboy River (Glanmire / Sallybrook) Flood Risk Assessment & Management Scheme - Engineering & Environmental Consultancy Services - Assess and develop a viable, cost-effective and sustainable Scheme, to allow the design flood event along the Glashaboy River and its tributaries without causing flooding of properties, in so doing protecting against flooding from pluvial, fluvial, tidal and surge.
View the procurement » Mentioned suppliers:Ove Arup & Partners Ireland Ltd t/a Arup
2013-05-28Motorway Contracts Audit and Adminstration Services (National Roads Authority)
- Provision of supervision, monitoring, audit and consulting engineering services in relation to the three Motorway Maintenance and Renewal Contracts (MMaRC), operation stage of PPP Contracts and other contracts relating to network operations.
- Anticipated duration of the Contract is 48 months, with a possible extension, at the sole discretion of the Authority, for a further 24 months.
View the procurement » Mentioned suppliers:WS Atkins Ireland Limited
2012-12-21PR/SI Works - Grangegorman Public Realm/Site Infrastructure Works (Grangegorman Development Agency)
The Grangegorman Development Agency ("GDA") is seeking, in broad terms, a Works Contractor for the construction of Tranche 1 of the site infrastructure and public realm works at
Grangegorman. The delivery of the overall urban quarter will be phased in line with available funding. Tranche 1 is designed to develop the site infrastructure to facilitate the future campus build-out and to enable partial occupation of the site from September 2014. Therefore, the public realm must contribute to a general …
View the procurement » Mentioned suppliers:Roadbrige
2012-06-29Framework for owners/resident engineer for Dev. & construction of BG (energy) wind farms (Bord Gais Eireann)
Multi supplier framework for owners/resident engineer role for the development and construction of Bord Gáis (energy) Wind Farms. It is anticipated that the proposed owners/resident engineer works relating to Bord Gáis (energy) wind farm developments that may be procured by Bord Gáis (energy) (or a subsidiary of Bord Gáis (energy)) under the framework will be at various locations throughout Ireland and Northern Ireland. To meet its requirements for the services of an owners/resident engineer for the …
View the procurement »