Procurements: Architectural, construction, engineering and inspection services (page 82)
2014-12-03Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire.
Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions.
View the procurement »
2014-11-27Establishment of a single-party framework agreement for planning consultancy services (Curragh Racecourse Ltd)
The Contracting Authority recently conducted a design competition for the redevelopment of Curragh Racecourse and is currently in the process, independently of this award procedure, of appointing the following roles for the implementation of the winning master-plan design:
— a lead Architect, and
— an integrated design team comprising Civil and Structural Engineering Services, Quantity Surveying Services, Mechanical and Electrical Engineering Services, Fire Safety Consultancy, and Project Supervisor for …
View the procurement » Mentioned suppliers:Cunnane Stratton Reynolds
2014-11-26Pressure Vessel Inspections (EN286-3) (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) has a requirement for the services of a specialist in pressure vessel inspection, testing and repair to comply with EU regulation EN286-3.
The service to be provided will include: inspection and testing of vessels in-situ on railway vehicles as well as the option for the repair of sub-standard vessels.
View the procurement »
2014-11-21IMERC intends to appoint a Single Design Team for the Development of Innovation building at Ringaskiddy, Co Cork (University College Cork ( UCC ))
The construction consultancy services required to carry out this project will be procured on the basis of a single design team appointment. The selected team will be required to provide the full range of consultancy services for the delivery of the project including but not limited to the following.
1. Architectural Services
2. Civil/Structural and Fire Engineering Services.
3. Mechanical and Electrical Engineering Services.
4. Project Supervisor Design Process (PSDP)
5. Quantity Surveying …
View the procurement »
2014-11-13Framework for the delivery of Works pursuant to the Better Energy Warmer Homes Scheme (Sustainable Energy Authority of Ireland)
The objective is to establish a framework of Contractors to install Better Energy Warmer Homes scheme energy efficiency measures in eligible homes nationwide. Contractors interested in Lot D may leverage funding for the public good activity once it is fully disclosed during the tender process. Tenders may be from social enterprise organisations provided that any public funding is fully disclosed in the tender proposal.
Contracts will be for service delivery in 2015 and SEAI reserves the right to extend …
View the procurement » Mentioned suppliers:Please refer to Point II.1.4)
2014-11-10Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont... (Beaumont Hospital)
The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric …
View the procurement »
2014-11-07Quantity Surveying Consulting Services (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to set up a framework agreement with a number of Quantity Surveying Firms for projects at Dublin and Cork Airports for the next 4 years (with an option to extend for 1 further year). This RFI process is to identify suitable consultants for consideration for inclusion in an RFT process.
View the procurement »
2014-11-05Contract for the administrative, technical and financial services for the Biofuels Obligation Scheme (National Oil Reserves Agency)
A contract for the provision of the administrative, technical, and financial services in respect of a Biofuels Obligation Scheme (‘BOS’), including and without limitation,
(i) to manage, operate and maintain the existing systems and processes that have been put in place for the day-to-day implementation of the provisions for the BOS legislation in a manner that meets the requirements of the BOS legislation and is carefully aligned to and fully integrated with the contracting authority's existing …
View the procurement »
2014-11-01‘Provision of ICT Software Support Services' for the National Screening Service (National Cancer Screening Service)
The National Screening Service (NSS), part of the HSE Health and Well-being Directorate is seeking responses by way of an Invitation to Tender (ITT) from suitably qualified ICT service providers for the ‘Provision of ICT Software Support Services' for the National Screening Service.
The services under this ITT are sought under 2 Lots;
Lot (1):
Provision of ICT Software Support Services for CervicalCheck — the National Cervical Screening Programme.
Lot (2):
Provision of ICT Software Support Services for …
View the procurement » Mentioned suppliers:Client Solutions Ltd T/A Avnet Client Solutions
2014-10-20Programme and Project Management Services (Mary Immaculate College)
The Contracting Authority is seeking to establish a framework agreement with a single operator for the provision of programme management and project management services for the campus development of Mary Immaculate College as more particularly described in the Invitation to Tender document available to download from www.etenders.gov.ie
View the procurement »
2014-10-14Establishment of a single-party framework agreement for integrated design team services for the Redevelopment of... (Curragh Racecourse Ltd)
The Contracting Authority recently conducted a design competition for the redevelopment of Curragh Racecourse and is currently in the process, independently of this award procedure, of appointing a lead Architect for the implementation of the winning master-plan design.
The purpose of this particular competition is the establishment of a single-party framework agreement for integrated design team services for the redevelopment of Curragh Racecourse. The framework agreement will be established with a …
View the procurement » Mentioned suppliers:AECOM Ltd
2014-10-10Airside Design Consultancy Framework (Dublin Airport Authority plc ( DAA ))
The Contracting Authority wishes to develop Airside Engineering projects included in the 2015-2019 Capital Investment Programme. A summary of these projects and their typical scope of design, project management and contract administration services are included in the attached RFI.
View the procurement »
2014-10-06Engineering Consultancy Services and Coastal Protection Works at Cloughaninchy and Framework (Clare County Council)
Engineering Consultancy Services associated with the construction of approximately 2.2 km of coastal protection centred around rock armour construction and providing protection for residential properties and the local public road network at Cloughaninchy, Quilty, Co. Clare. (“The Project“).
The Project will also be used for establishment of a multiple operator framework agreement for Engineering Consultancy Services for the Coastal and Inland Storm/Flooding Remediation Programme, Clare County Council …
View the procurement » Mentioned suppliers:Arup
2014-10-03DCU Institute of Education Building Programme, Block E Roof Extension professional consultancy services for in... (Dublin City University (DCU))
The project is defined as design project management, architectural, structural, health and safety, building services design and specialist design to approximate CWMF Stage (ii), appointment of the Contractor and implementation, management and administration of the construction process to completion, relating to the development of a Block E Roof Extension which may comprise some breaking through works and disposal of elements of existing facilities and the construction of new facilities which will reflect …
View the procurement »
2014-10-02East West Interconnector (EWIC) — Marine Survey 2015 (EirGrid plc)
EirGrid is seeking a provider to perform a marine survey next year (2015) to determine the condition of the recently laid EWIC cables. The marine segment of the EWIC system is 187 km in length. The scope of services required are specified below in Section 3. The Contractor shall have the total responsibility for performing all activities necessary to complete the services, including management, engineering, survey operation and deliverables in accordance with the requirements of the Contract.
View the procurement » Mentioned suppliers:Osiris Projects
2014-09-26Institute of Education Building Programme, Block E Roof Extension professional consultancy services for project... (Dublin City University (DCU))
The services relate to DCU Institute of Education Building Programme — Block E Roof Extension at St Patrick's College, Drumcondra. In addition it is noted that additional ancillary works may be instructed during the Project.
Overview 1.1
(1) The scope comprises all services required of:
(a) The Employer's Representative under the Public Works Contracts (COE and CF1); and
(b) the Project Management of the Project including the management of the Project Team i.e. the Integrated Design Team (‘IDT’), the …
View the procurement »
2014-09-17Airport Campus Buildings / Multi-Discipline Consultancy Services (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to appoint between 4 and 6 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited. The Contracting Authority proposes to enter into framework agreements with a number of Project Design and Management consultants to Design and Project Manage its future design requirements.
The Candidates will be required to assemble multi-disciplinary teams led by a Project Manager to prepare a full suite of design services associated with procuring …
View the procurement »
2014-09-17Provision of Transport Projects — Technical Advisory Services (National Transport Authority)
The Authority has statutory responsibility for the provision of public transport infrastructure in the Greater Dublin Area and the provision of bus infrastructure and cycling facilities throughout the State. In addition, the Authority also manages on behalf of the Department of Transport, Tourism and Sport, public transport and traffic management investment programmes in the regional cities of Cork, Limerick, Galway and Waterford.
Arising from this remit, the Authority proposes to engage a Consultant to …
View the procurement » Mentioned suppliers:Jacobs Engineering Ireland Limited
2014-09-02Provision of Stress Free Temperature (SFT) Measurement Services (Iarnrod Eireann-Irish Rail)
Iarnrod Eireann (IE) is seeking expressions of interest from suitable companies to carry out in track, non destructive, non intrusive measurements to determine the Stress Free Temperature (SFT) on continuous welded rail (CWR) track sections at selected locations on the IE network.
The method of measurement must provide high output with accurate results. The method of measurement and proposed equipment must be beyond the trial stage and have been successfully used on other EU railways. The proposed …
View the procurement »
2014-08-14Applications for Public Funding for the development of a Multifunctional Event Centre in Cork City (Cork City Council)
The development of a multifunctional venue of scale has been an objective of Cork City Council (the ‘Council’) since the 1990's. The existence of market failure has meant that without some level of public funding or subvention, potential investors would not proceed with the development of such a venue. In recognition of this the Irish Government has made up to 10 000 000 EUR available as part of the public sector support for this project and the Council will make further funding up to EUR4m available as …
View the procurement »