Procurements: Operation of a water-purification plant
18 archived procurements
Operation of a water-purification plant have been procured by organizations such as Irish Water, Ervia, and Beaumont Hospital.
Historically, suppliers within this area have been Glan Agua, Veolia Water Ireland Ltd, Black and Veatch/Celtic Anglian Water Ltd, Cathelco Ltd, Coffey Northumbrian Ltd, Coffey Water, Crowley Hall Consulting, EFACEC/SIAC, Electrical and Pump Services Ltd, and Glan Agua Ltd.
- Public utilities
- Water distribution and related services
- Operation of a water-purification plant ⬅️
Recent procurements of operation of a water-purification plant in Ireland
2024-07-05
UCC-2024-05 Legionella Control Services (University College Cork)
UCC wishes to appoint a specialist Legionella control contractor, to carry out all necessary works to maintain compliance with Legionella control regulations. View the procurement »
UCC wishes to appoint a specialist Legionella control contractor, to carry out all necessary works to maintain compliance with Legionella control regulations. View the procurement »
2023-05-19
For the provision of Water Maintenance services to MMUH (Mater Misericordiae University Hospital Ltd)
For the provision of Water Maintenance services to MMUH View the procurement »
For the provision of Water Maintenance services to MMUH View the procurement »
2021-05-17
The Supply, Installation, Commissioning Support and Maintenance of a Duplex Reverse Osmosis Water Treatment System (Beaumont Hospital)
The contracting authority requires the design, manufacture, supply, installation and commissioning of a duplex reverse osmosis system for use with eight washer/disinfectors in its central sterile supplies department at Beaumont Hospital. Following the expiry of a warranty period of 12 months’ duration, a contract for the support and maintenance of the equipment of 4 years’ duration will be awarded. The contracting authority reserves the right, upon the expiry of this 4-year contract, to award subsequent … View the procurement »
The contracting authority requires the design, manufacture, supply, installation and commissioning of a duplex reverse osmosis system for use with eight washer/disinfectors in its central sterile supplies department at Beaumont Hospital. Following the expiry of a warranty period of 12 months’ duration, a contract for the support and maintenance of the equipment of 4 years’ duration will be awarded. The contracting authority reserves the right, upon the expiry of this 4-year contract, to award subsequent … View the procurement »
2018-07-27
Legionella Control Services (University College Cork (UCC))
As per RFT View the procurement »
As per RFT View the procurement »
2017-06-02
Provision of Service Contract for Water Sampling & Analysis Study for the Environmental Protection Agency (Education Procurement Service (EPS))
In anticipation of the requirements of the Water Framework Directive (WFD) Priority Substances Regulations SI. No. 386 of 2015, the Environmental Protection Agency wishes to tender for a Water Sampling and Analysis project to determine the likely presence or otherwise of the new substances listed in the Directive in the Irish aquatic environment. View the procurement »
In anticipation of the requirements of the Water Framework Directive (WFD) Priority Substances Regulations SI. No. 386 of 2015, the Environmental Protection Agency wishes to tender for a Water Sampling and Analysis project to determine the likely presence or otherwise of the new substances listed in the Directive in the Irish aquatic environment. View the procurement »
2016-12-13
Killybegs and Lettermacaward Regional Water Supply Schemes Project (Irish Water)
Irish Water on behalf of Ervia propose to upgrade two existing Water Treatment Plants (WTP's), an existing raw water impoundment, and a range of associated network infrastructure improvements including service reservoirs, booster pumping stations and pipeline works. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design, Build and … View the procurement »
Irish Water on behalf of Ervia propose to upgrade two existing Water Treatment Plants (WTP's), an existing raw water impoundment, and a range of associated network infrastructure improvements including service reservoirs, booster pumping stations and pipeline works. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design, Build and … View the procurement »
2016-11-03
Lee Road Water Treatment Plant Upgrade (Irish Water)
Refurbishment/Upgrade/Expansion of the existing Lee Road Water Treatment Plant (WTP) including a one year Operation Service period. View the procurement »
Refurbishment/Upgrade/Expansion of the existing Lee Road Water Treatment Plant (WTP) including a one year Operation Service period. View the procurement »
2016-07-06
16/085 — Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract (Irish Water)
As part of the Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract, Irish Water on behalf of Ervia plans to undertake the following: — Construction of a new 80MLD Water Treatment Plant (WTP); — Upgrade of the Existing Vartry Reservoir Intake including new siphon pipework; — Increase the capacity of the existing Vartry Reservoir Spillway; The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated … View the procurement »
As part of the Vartry Water Supply Project — Water Treatment Plant and Reservoir Upgrade Contract, Irish Water on behalf of Ervia plans to undertake the following: — Construction of a new 80MLD Water Treatment Plant (WTP); — Upgrade of the Existing Vartry Reservoir Intake including new siphon pipework; — Increase the capacity of the existing Vartry Reservoir Spillway; The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated … View the procurement »
2016-06-24
16/030 — A Multi-Supplier Framework for the provision of Major Process, MEICA and DBO Works (Incorporating... (Irish Water)
Irish Water is requesting tenders to establish a multi-supplier framework for the provision of all required works and services associated with Major Process, MEICA and DBO Works (incorporating associated civil works) to support the delivery of the Irish Water's capital investment plan. It is envisaged that these works will be carried out in a planned manner where work packages are identified in advance of each call off. Irish Water intends to enter into a framework agreement up to a maximum of 15 … View the procurement »
Irish Water is requesting tenders to establish a multi-supplier framework for the provision of all required works and services associated with Major Process, MEICA and DBO Works (incorporating associated civil works) to support the delivery of the Irish Water's capital investment plan. It is envisaged that these works will be carried out in a planned manner where work packages are identified in advance of each call off. Irish Water intends to enter into a framework agreement up to a maximum of 15 … View the procurement »
2016-05-17
Lough Mask Regional Water Supply Scheme, Water Treatment Plant Upgrade (Irish Water)
Irish Water is currently advancing the Lough Mask Regional Water Supply View the procurement »
Irish Water is currently advancing the Lough Mask Regional Water Supply View the procurement »
2016-02-10
15/159 — Ballyshannon Regional Water Supply Scheme Contract No 1 — Water Treatment Plant and Primary Network Design... (Ervia)
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains. The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an … View the procurement »
Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains. The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an … View the procurement »
2016-01-25
Letterkenny Regional Water Supply Scheme including Creeslough WTP, Contract No 1 — Letterkenny and Creeslough Water... (Ervia)
Irish Water plan to undertake the development of two Water Treatment Plants (WTPs) together with associated works as part of the Letterkenny Regional Water Supply Scheme including Creeslough Water Treatment Plant. It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract. View the procurement »
Irish Water plan to undertake the development of two Water Treatment Plants (WTPs) together with associated works as part of the Letterkenny Regional Water Supply Scheme including Creeslough Water Treatment Plant. It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract. View the procurement »
2016-01-14
Thurles Regional Water Supply Scheme Contract No. 2 — Design Build Operate Water Treatment Plant (Ervia)
Irish Water on behalf of Ervia plan to undertake the development of a Water Treatment Plant (WTP) together with associated works as part of the Thurles Regional Water Supply Scheme Contract No. 2 — Design Build Operate Water Treatment Plant. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract. View the procurement »
Irish Water on behalf of Ervia plan to undertake the development of a Water Treatment Plant (WTP) together with associated works as part of the Thurles Regional Water Supply Scheme Contract No. 2 — Design Build Operate Water Treatment Plant. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption. It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract. View the procurement »
2015-04-10
15/026 — Sligo and Environs Water Supply Scheme — Foxes Den/Cairns Hill Water Treatment Plants DBO Contract (Bord Gáis Éireann/Ervia)
Irish Water, on behalf of Ervia, plan to undertake the upgrade of the existing Foxes Den Water Treatment Plant (WTP) and to decommission the existing Cairns Hill WTP together with associated ancillary works as part of the Sligo and Environs Water Supply Scheme — Foxes Den/Cairns Hill Water Treatment Plants DBO Contract. The planned works are necessary to facilitate the efficient supply of water to consumers while also eliminating water quality issues associated with the Cairns Hill WTP. The project will … View the procurement »
Irish Water, on behalf of Ervia, plan to undertake the upgrade of the existing Foxes Den Water Treatment Plant (WTP) and to decommission the existing Cairns Hill WTP together with associated ancillary works as part of the Sligo and Environs Water Supply Scheme — Foxes Den/Cairns Hill Water Treatment Plants DBO Contract. The planned works are necessary to facilitate the efficient supply of water to consumers while also eliminating water quality issues associated with the Cairns Hill WTP. The project will … View the procurement »
2011-04-26
Provision of Reverse Osmosis Plant to the Irish Naval Service, Department of Defence (Irish Naval Service)
As per attached RFT. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=226852. View the procurement »
As per attached RFT. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=226852. View the procurement »
2009-04-17
Operation of water supplies (Westmeath County Council)
Title attributed to the contract by the contracting authority: Portloman Water Treatment Plant - Operation and Maintenance Contract. Westmeath County Council wishes to invite Expressions of Interest from suitably qualified and experienced Contractors to operate and maintain the existing water treatment plant at Portloman, Mullingar. Expressions of Interest must be provided in the form set out in the Prequalification Document, available from the Address for Further Information given in this Notice. This … View the procurement »
Title attributed to the contract by the contracting authority: Portloman Water Treatment Plant - Operation and Maintenance Contract. Westmeath County Council wishes to invite Expressions of Interest from suitably qualified and experienced Contractors to operate and maintain the existing water treatment plant at Portloman, Mullingar. Expressions of Interest must be provided in the form set out in the Prequalification Document, available from the Address for Further Information given in this Notice. This … View the procurement »
2006-06-16
Sewage-treatment plant (Kerry County Council)
Title attributed to the contract by the contracting authority: Waterville Water and Wastewater Treatment Plants ( Design/Build and Operate Contract). The contract is for the design/build and operate and maintain water and wastewater treatment Plants at Waterville, County Kerry. Other elements in the contract are sewage pumping stations, sewage rising mains, sea outfall, water reservoir, water pumping station and water intake works as well as lengths of water mains and sewers in the vicinity of some of … View the procurement »
Title attributed to the contract by the contracting authority: Waterville Water and Wastewater Treatment Plants ( Design/Build and Operate Contract). The contract is for the design/build and operate and maintain water and wastewater treatment Plants at Waterville, County Kerry. Other elements in the contract are sewage pumping stations, sewage rising mains, sea outfall, water reservoir, water pumping station and water intake works as well as lengths of water mains and sewers in the vicinity of some of … View the procurement »
2005-10-25
Drinking-water treatment plant (Sligo County Council)
Title attributed to the contract by the contracting authority: Kilsellagh Water Treatment Works Design/Build/Operate Contract. Sligo County Council, the "Employer" for the Project, seeks suitable D/B/O contractors with experience and expertise in the design, construction and operation of Water Treatment Works, Water Storage Facilities and Pipeline Networks. The contract includes for the design, build, operation and maintenance of a water treatment works, service reservoir and ancillary facilities at … View the procurement »
Title attributed to the contract by the contracting authority: Kilsellagh Water Treatment Works Design/Build/Operate Contract. Sligo County Council, the "Employer" for the Project, seeks suitable D/B/O contractors with experience and expertise in the design, construction and operation of Water Treatment Works, Water Storage Facilities and Pipeline Networks. The contract includes for the design, build, operation and maintenance of a water treatment works, service reservoir and ancillary facilities at … View the procurement »