2014-11-10Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont... (Beaumont Hospital)
The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric …
View the procurement »
2014-11-10Multi-functional sports building for Galway Mayo Institute of Technology, Dublin Road, Galway (Galway Campus) (Galway Mayo Institute of Technology)
The Galway-Mayo Institute of Technology) is seeking to short-list a maximum of 10 contractors who will be invited to tender for a Multi-functional Sports Building. The development will consist of a 2 storey multi-functional sports building with approximately gross floor area of 2 500 m², car parking, ESB Substation, signage, landscaping and all associated site development works and services. Vehicular access to the development will be via the existing access road off Ballyloughane Road. The proposed …
View the procurement »
2014-11-06Preventative & Reactive Multi-skilled Engineering Support Service (An Post)
An Post is seeking preventative and reactive engineering support services to look after specified equipment on 7 sites (detailed below) 5 days per week (Monday to Friday). The Service Provider will be responsible for the creation and management of an agreed Preventative Maintenance plan. Services would also include additional support services to cover equipment failure due to breakdowns or damage. Most of the work will be carried out in buildings that are occupied and continuity of business will be …
View the procurement » Mentioned suppliers:Material Handling Maintenance
2014-11-06Construction Work — Framework Agreement Minor and Major — please see attached work document (Notice — Scope Of... (An Post)
Construction work FWA 1 Minor:
The works covered under this framework agreement would fall into 3 categories:
1. Refurbishment works,
2. Small minor works,
3. Extensions to existing occupied premises.
Most of the work will be carried out in buildings that are occupied and continuity of business will be required at all times.
FWA 2 Major:
The works covered under this framework agreement would fall into 4 categories:
1. Significant Refurbishment works,
2. Extensions to existing occupied premises,
3. Fit …
View the procurement »
2014-11-05Proposed Development at Canon Troy Court, Chapelizod Hill, Ballyfermot, Dublin 10 (The Iveagh Trust)
The Iveagh Trust wish to appoint a competent and experienced building contractor with mechanical and electrical works capacity and experience to construct and complete all necessary works to deliver on programme the redevelopment of Canon Troy Court.
The works are for the development of 74 no units (4 705 m² GFA) over 4 storeys on a site of approx. 5.4 hectares. The works comprise the extension and refurbishment of existing block and the construction of new blocks.
Site works will include the …
View the procurement »
2014-10-29Dublin City Water Supply Scheme — Ballymore Eustace Water Treatment Plant — Sludge Treatment — M&E Contract for Irish Water (Ervia)
Irish Water is undertaking the provision of a new sludge treatment facility for the Ballymore Eustace Water Treatment Plant, to cater for the increase in capacity of the upgraded water treatment plant. The Ballymore Eustace plant is the largest Water Treatment Plant in Ireland, and requires Works to provide additional sustainable sludge treatment capacity to meet medium and long term water demands.
Please refer to the Pre-Qualification Questionnaire for full scope.
View the procurement »
2014-10-23Gas to Wexford Town (Bord Gáis Éireann/Ervia)
This works contract will be for the construction and commissioning of a utility gas network to Wexford Town from Campile Co. Wexford and include the installation of gas network and potentially, the upgrade of some of existing water network at specific locations in Wexford Town. The contract has been subdivided into the following Lots: Lot 1 — Gas Feeder Main, Lot 2 — Wexford Town Gas Network & Lot 3 — Wexford Town Gas & Water Network.
View the procurement » Mentioned suppliers:Roadbridge
2014-10-15Phase 2 Wards/Theatre/A&E Extension Building, Our Lady of Lourdes Hospital Drogheda Co. Louth (Health Service Executive (HSE))
The works consist of a new building constructed next to the phase 1 existing emergency department block. The new block will provide for an A & E extension on the ground floor, Three ward floors to provide approx eighty three new single beds and operating department of five operating theatres on the fourth floor. Initially however only a partial fit out is proposed comprising two ward floors and part of the ground floor.
View the procurement »
2014-10-06Teaching and Learning Centre at Institute of Technology Carlow (Institute of Technology Carlow)
The project consists of the development of a new 3 storey Teaching and Learning Centre of circa 3 100 m² at Institute of Technology Carlow‘s main campus, Kilkenny Road, Carlow. Accommodation includes Lecture Theatres, Classrooms, Project Rooms, IT/Computer facilities, Staff facilities, Administration and Circulation Space. The project also includes ancillary external works.
View the procurement »
2014-08-29Wexford Garda Divisional HQ - Main Contractor - Pre-qualification (Office of Public Works ( OPW ))
The Commissioners of Public Works are seeking applications from experienced building contractors who wish to be pre-qualified to tender for the construction of a new 3 952 sqm Garda Divisional Headquarters on a site circa 2,79 hectares at Mulgannon Road, Wexford, Ireland.
Separate notices will issue in respect of Mechanical, Electrical & Lift Specialists for this project.
View the procurement »
2014-08-28Cork Lower Harbour Main Drainage Scheme — Directional Drill Estuary Crossing (Bord Gais Eireann/ Ervia)
Irish Water is undertaking the Cork Lower Harbour Main Drainage Scheme to provide waste-water collection storage and treatment for the catchment area which includes the towns of Cobh, Passage West, Monkstown, Ringaskiddy, and Carrigaline and adjoining areas.
The project is divided into several contracts, the contract described herein is for the provision, trenchless laying and testing of 2 no. new 400 mm diameter nominal bore, 1 400 m long gravity sewer pipes beneath a 1 km wide body of open tidal …
View the procurement »
2014-08-19HOB Refurbishment Project (Design and Build) (Dublin Airport Authority plc (DAA))
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the ‘Employers Requirements Documents’. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose.
View the procurement »
2014-08-14PG108T926 Knottingley power CCGT development (Knottingley Power Limited)
The combined cycle gas turbine power station, to be constructed east of Knottingley, West Yorkshire, UK, will consist of up to 3 separate single shaft generating units, hybrid cooling towers and other ancillary structures and will have a nominal net electrical output capacity of no more than 1 500 MWe at ISO conditions. The power station will be gas fired and served by an 8 km long underground gas pipeline connecting the power station to the National Grid Transmission System south of the town of …
View the procurement »
2014-08-14Applications for Public Funding for the development of a Multifunctional Event Centre in Cork City (Cork City Council)
The development of a multifunctional venue of scale has been an objective of Cork City Council (the ‘Council’) since the 1990's. The existence of market failure has meant that without some level of public funding or subvention, potential investors would not proceed with the development of such a venue. In recognition of this the Irish Government has made up to 10 000 000 EUR available as part of the public sector support for this project and the Council will make further funding up to EUR4m available as …
View the procurement »
2014-08-05Supply of Bus Stop Timetable Display Units (National Transport Authority)
The Authority is seeking a supplier to provide bus stop timetable information display units suitable for attachment to new 60,3 mm diameter stainless steel (and painted steel) bus stop poles. The intended duration of the Contract is a two (2) year period.
The height of the bus timetable information unit should be adjustable. Typical heights from ground level to the underside of the visible printed area will be between 0,9 m and 1,5 m.
The units will be used to display bus travel information on printed …
View the procurement » Mentioned suppliers:Larkin Engineering Enterprises Limited
2014-07-31Supply of Bus Stop Pole Foundation Sockets (National Transport Authority)
The Authority has identified a need for further dissemination of public transport information at bus stops nationally and intends to erect new bus poles, to be installed with foundation/ground sockets, and information display units at bus stops nationally. Section 3 of the Request for Tenders details the Specification for Bus Pole Foundation Sockets required of the successful Tenderer.
View the procurement » Mentioned suppliers:Ipl Group
2014-07-23Traffic Calming Maintenance Work (National Roads Authority (NRA))
The Contracting Authority (The National Roads Authority) (“NRA”) requires the services of Contractors for the maintenance of traffic calming schemes and pedestrian crossings in the Republic of Ireland.
The Contracts include Cleaning, Maintenance, Inspection, Reporting, Inventory, Routine Fixing of Minor Defects and Schedule Works of Traffic Calming Schemes including replacement of Traffic Route Specific to Traffic Calming, and maintenance of Pedestrian signals as well as other ancillary works which may …
View the procurement » Mentioned suppliers:Clonmel Enterprises
2014-07-22Bandon Flood Relief Scheme - Civil Engineering Works Contractor (Office of Public Works (OPW))
A Civil Works Contractor is required to undertake the Bandon Flood Relief Scheme which will include dredging of the channel for approximately 3.6 km, demolition and replacement of a pedestrian bridge, construction of new defence walls, construction of new defence embankments, construction of fish pass structures, construction of new culverts and works to existing drainage scheme.
View the procurement »
2014-07-11WCCC/R/003 – Framework Agreement for Pavement and Associated Minor Works for national roads (Waterford City and County Council)
The Contracting Authority wishes to establish and operate a multi-supplier.
Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be minimum 3 and maximum 8 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 24 months. The Contracting Authority may, at its absolute discretion, extend the Framework Period by a further 24 months in 12 months increments such …
View the procurement »
2014-07-11cnpy2014 - Drogheda Port Company are seeking tenders for the provision of a canopy type break bulk store (Drogheda Port Company)
Drogheda Port Company are seeking tenders for the provision of a canopy type break bulk store, comprising of a roof on a steel frame type to cover an existing port storage area of approximately 1500m2. The building fit for purpose in a port environment should conform to the grant of permission issued on 23.6.2014 and certified on completion in accordance with current building regulation requirements and lighting to conform to appropriate electrical industry standards.
View the procurement »
2014-07-04UL0330 – University of Limerick Sport Arena Extension (University of Limerick)
The development will comprise the construction of a circa 4,500 m² extension to the UL Sports Arena on the University of Limerick Campus. The development includes a single storey buidling to provide a 25M X 10M swimming pool and a separate three store extension to provide an elite dry sports training facility. The swimming pool includes a 25M x 10M training pool complete with diving facility to 4m depth at one end, additional squad changing rooms and associated shower areas complete with ancillary pool …
View the procurement »
2014-07-02Galway Garda Regional and Divisional HQ - Main Contractor Pre-qualification (Office of Public Works ( OPW ))
The Commissioners of Public Works are seeking applications from experienced
building contractors who wish to be considered for inclusion on a panel from
which tenders will be invited for the construction of a new Garda Regional and
Divisional Headquarters on a greenfield site at Dublin Road, Galway. A separate
notice has been transmitted for mechanical, electrical and lift specialists.
View the procurement »
2014-06-26Framework Agreement for Pavement and Associated Minor Works for National, Regional and Local Roads 2014-2016 (Wexford County Council)
The Contracting Authority wishes to establish and operate a multi-supplier Framework Agreement for the provision of Pavement and Associated Minor Works for National, Regional and Local Road Schemes. The proposed number of framework contractors will be minimum 3 and maximum 8 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 28 months. The Contracting Authority may, at its absolute discretion, extend the Framework Period by a further 12 months such that …
View the procurement »
2014-06-25CCE/5266/ME - Framework Agreement for the provision of building and structures maintenance service to Iarnród... (Iarnrod Eireann-Irish Rail)
Iarnród Éireann invites applications from suitably qualified companies to participate in the Pre-Qualification process for the appointment of companies to a Framework Agreement for the Provision of Building and Structures Maintenance Services.
It proposes to pre-qualify a number of suitably qualified candidates to participate in the tender process. Under this contract the provision of building and structures maintenance services will be sought to support the requirements of both Iarnród Éireann and the …
View the procurement »
2014-06-23SC 06/14-05 (OPL) - Civil Balance of Plant - Oweninny Power Limited (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Oweninny Power Limited. The Joint Venture parties are Bord na Móna Energy Limited and ESB Wind Development Limited. Expressions of interest are being invited from suitably qualified candidates interested in being considered as contractor for the civil balance of plant requirements for the Oweninny Wind Farm development.
Oweninny Phase 1 and Phase 2 will have a total aggregate installed capacity of 172MW. We intend to award this tender …
View the procurement »
2014-06-21ED & Dialysis Fit Out & Other Works Project - New Emergency Department & Dialysis Unit Fit Out & Associated Other... (Health Service Executive (HSE))
The project includes the fit-out for new Emergency and Dialysis Departments
and related other works at University Hospital Limerick. The Emergency Department will be mainly accommodated in a shell building at level 0, part of which is directly underneath the hospital's current live Intensive Care Unit and the remainder of the shell space is underneath another shell space at level 1 which will also be fitted out as part of the works to provide a new dialysis unit for the hospital. The works will include …
View the procurement »
2014-06-13Haddington Road National School (Department of Education & Skills)
Expressions of Interest are invited from suitably qualified building contractors who wish to be considered for of the demolition/removal of all existing buildings and structures on the site and the construction of a new 24 classroom primary school building (approx. 3 800 m²), and ancillary accommodation, over 3 storeys.
View the procurement »
2014-06-09Multi-Party Framework Agreement for Carrying out Roadworks in a City and Suburban Environment for Contracts greater... (Dublin City Council)
Dublin City Council (DCC) in conjunction with Dun Laoghaire Rathdown County Council proposes to establish and operate a Multi Party Framework Agreement with multiple operators for Carrying out Roadworks in a City and Suburban Environment within the Dublin City Council and Dun Laoghaire-Rathdown County Council Administrative Areas.
Contracts could vary from EUR0.5 to less than EUR5.0m (incl. VAT). Works could involve some of the following activities:
— Installation of ducts,
— Roadway repairs (flexible …
View the procurement »
2014-06-05Pool and Outdoor Facilities — Construction of a new swimming pool complex, outdoor educational building and outdoor... (Mayo County Council)
Site 1. New development of a swimming pool complex and outdoor educational building, incorporating indoor swimming pools, viewing area, changing and storage facilities, fitness gym, aerobics studio, climbing wall, lecture rooms and associated offices, site services, car park, pedestrian links at Knockacroghery, Castlebar, Co. Mayo.
Site 2. New development of outdoor playing pitches, athletic track and clubhouse, incorporating changing, toilet and storage facilities and all associated site services, …
View the procurement »
2014-05-3014/044 - Cork Lower Harbour Main Drainage Project Network Contract for Irish Water (Bord Gais Eireann)
Irish Water proposes to undertake the development of new network collection and transfer systems in the towns of Cobh, Passage West, Monkstown, Carrigaline and Ringaskiddy in the Cork Lower Harbour area. This is necessary to ensure compliance Irish National Standards and Regulations relating to transfer and storage of urban wastewater. It is intended to divide the Network Contract into Lots.
General project information is contained on the public consultation website
www.corklh.com
View the procurement »
2014-05-30A10/13/430 - Amelioration of the Virology High Containment Labs (Main Works) & Effluent Treatment Plant Room (Office of Public Works (OPW))
Reference to High Containment Facilities within this Notice includes: SAP04, BSL3Ag, ACDP4/ BSL4/ CL4/ CAT4/ PC4 and BSL3/ CL3/ PC3 facilities with facility enhancements that include lab shower out facilities, HEPA filtration and effluent treatment systems.
The works are to be carried out on the High Containment cabinet laboratory and effluent treatment plant room. The High Containment cabinet laboratory is located at ground level within an operational facility. The heat treatment plant is located at a …
View the procurement »
2014-05-29P2352 - T2 MSCP Extension (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to commission a Design & Build contractor to Design and Construct additional floors to the T2 multi-story car park structure at Dublin Airport to facilitate short-term parking spaces to be known as Phase 2.
Phase 2 of the project will be constructed in sub phases to facilitate the current commercial operation of the carpark, which will remain operational during the works.
View the procurement »