Procurements: Construction work (page 62)

2014-11-13   Framework for the delivery of Works pursuant to the Better Energy Warmer Homes Scheme (Sustainable Energy Authority of Ireland)
The objective is to establish a framework of Contractors to install Better Energy Warmer Homes scheme energy efficiency measures in eligible homes nationwide. Contractors interested in Lot D may leverage funding for the public good activity once it is fully disclosed during the tender process. Tenders may be from social enterprise organisations provided that any public funding is fully disclosed in the tender proposal. Contracts will be for service delivery in 2015 and SEAI reserves the right to extend … View the procurement »
Mentioned suppliers: Please refer to Point II.1.4)
2014-11-11   Red zone car park D&B works (Dublin Airport Authority plc (DAA))
The Contracting Authority proposes to commission a design and build contractor to design and construct porous or permeable surfacing to the currently hard-cored spaces within Red Car Park (Main). View the procurement »
2014-11-10   Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont... (Beaumont Hospital)
The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric … View the procurement »
2014-11-10   Multi-functional sports building for Galway Mayo Institute of Technology, Dublin Road, Galway (Galway Campus) (Galway Mayo Institute of Technology)
The Galway-Mayo Institute of Technology) is seeking to short-list a maximum of 10 contractors who will be invited to tender for a Multi-functional Sports Building. The development will consist of a 2 storey multi-functional sports building with approximately gross floor area of 2 500 m², car parking, ESB Substation, signage, landscaping and all associated site development works and services. Vehicular access to the development will be via the existing access road off Ballyloughane Road. The proposed … View the procurement »
2014-11-06   Preventative & Reactive Multi-skilled Engineering Support Service (An Post)
An Post is seeking preventative and reactive engineering support services to look after specified equipment on 7 sites (detailed below) 5 days per week (Monday to Friday). The Service Provider will be responsible for the creation and management of an agreed Preventative Maintenance plan. Services would also include additional support services to cover equipment failure due to breakdowns or damage. Most of the work will be carried out in buildings that are occupied and continuity of business will be … View the procurement »
Mentioned suppliers: Material Handling Maintenance
2014-11-06   Construction Work — Framework Agreement Minor and Major — please see attached work document (Notice — Scope Of... (An Post)
Construction work FWA 1 Minor: The works covered under this framework agreement would fall into 3 categories: 1. Refurbishment works, 2. Small minor works, 3. Extensions to existing occupied premises. Most of the work will be carried out in buildings that are occupied and continuity of business will be required at all times. FWA 2 Major: The works covered under this framework agreement would fall into 4 categories: 1. Significant Refurbishment works, 2. Extensions to existing occupied premises, 3. Fit … View the procurement »
2014-11-05   Proposed Development at Canon Troy Court, Chapelizod Hill, Ballyfermot, Dublin 10 (The Iveagh Trust)
The Iveagh Trust wish to appoint a competent and experienced building contractor with mechanical and electrical works capacity and experience to construct and complete all necessary works to deliver on programme the redevelopment of Canon Troy Court. The works are for the development of 74 no units (4 705 m² GFA) over 4 storeys on a site of approx. 5.4 hectares. The works comprise the extension and refurbishment of existing block and the construction of new blocks. Site works will include the … View the procurement »
2014-10-29   Dublin City Water Supply Scheme — Ballymore Eustace Water Treatment Plant — Sludge Treatment — M&E Contract for Irish Water (Ervia)
Irish Water is undertaking the provision of a new sludge treatment facility for the Ballymore Eustace Water Treatment Plant, to cater for the increase in capacity of the upgraded water treatment plant. The Ballymore Eustace plant is the largest Water Treatment Plant in Ireland, and requires Works to provide additional sustainable sludge treatment capacity to meet medium and long term water demands. Please refer to the Pre-Qualification Questionnaire for full scope. View the procurement »
2014-10-24   NUIG/BUILD 014/14; Daily Maintenance and Repair of Fire Detection and Control Systems (National University of Ireland (NUI Galway))
NUI Galway propose to engage in a competitive process for the establishment of a single party framework agreement for the daily maintenance and repair of fire detection and control systems for both existing and new buildings at NUI Galway. View the procurement »
2014-10-23   Gas to Wexford Town (Bord Gáis Éireann/Ervia)
This works contract will be for the construction and commissioning of a utility gas network to Wexford Town from Campile Co. Wexford and include the installation of gas network and potentially, the upgrade of some of existing water network at specific locations in Wexford Town. The contract has been subdivided into the following Lots: Lot 1 — Gas Feeder Main, Lot 2 — Wexford Town Gas Network & Lot 3 — Wexford Town Gas & Water Network. View the procurement »
Mentioned suppliers: Roadbridge
2014-10-15   Phase 2 Wards/Theatre/A&E Extension Building, Our Lady of Lourdes Hospital Drogheda Co. Louth (Health Service Executive (HSE))
The works consist of a new building constructed next to the phase 1 existing emergency department block. The new block will provide for an A & E extension on the ground floor, Three ward floors to provide approx eighty three new single beds and operating department of five operating theatres on the fourth floor. Initially however only a partial fit out is proposed comprising two ward floors and part of the ground floor. View the procurement »
2014-10-10   Kerry Central Water Supply Project and North East Roscommon Water Supply Project — DBO Contracts for Irish Water (Bord Gais Eireann / Ervia)
Irish Water is undertaking this project to provide appropriate water treatment for the areas served by the Kerry Central Regional Water Supply Scheme (KCRWSS) and the North East Roscommon Regional Water Supply Scheme (NERRWSS). View the procurement »
2014-10-07   Proposed Retrofit Works and New Special Care Residential Unit on a Secure, Integrated Campus at Crannog Nua, Portrane (Health Service Executive (HSE))
Proposed Retrofit Works and New Special Care Residential Unit on a Secure, Integrated Campus at Crannog Nua, Portrane by Restricted Procedure above Threshold. View the procurement »
2014-10-06   Teaching and Learning Centre at Institute of Technology Carlow (Institute of Technology Carlow)
The project consists of the development of a new 3 storey Teaching and Learning Centre of circa 3 100 m² at Institute of Technology Carlow‘s main campus, Kilkenny Road, Carlow. Accommodation includes Lecture Theatres, Classrooms, Project Rooms, IT/Computer facilities, Staff facilities, Administration and Circulation Space. The project also includes ancillary external works. View the procurement »
2014-09-29   Market soundings notice only — this is not a call for competition. Notice relates to the provision of voting/sound/... (Houses of the Oireachtas Service)
This is not a call for competition. This is a Market Sounding Notice. The purpose of this Notice is to get a clear understanding of the latest features, products, designs, solutions and services in the voting, sound, audio/video broadcasting and annunciator market prior to issuing a tender for an electronic automated system to manage these. A further objective of this exercise is to identify possible suppliers, consortia and/or re-sellers who might be interested in such a tender process. View the procurement »
2014-09-29   Extension to Breifne College, Cootehill Road, Cullies, Cavan (Cavan and Monaghan Education and Training Board)
Demolition of existing PE Hall to the side of existing school and the construction of a new 4 800 m² stand-alone extension to the same location and associated ancillary site development works. View the procurement »
2014-09-25   Service Concession contract for the design, build, finance, operate and transfer of a new fuel farm facility of 3 x... (Dublin Airport Authority plc ( DAA ))
This non mandatory, voluntary Contract Notice is being published for the sole purpose of informing potential candidates of the proposed tender for the design, build, finance operate and transfer of a new fuel farm facility of 3 x 5 000 m³ and associated facilities at Dublin Airport. The project involves: — the operation of the existing Fuel Farm which has 3 x 800 m³ storage tanks, a fuel receipt facility and 2 into-plane units, for a transition period pending the construction of the new facility; — the … View the procurement »
2014-09-25   Supply of a new self-contained drill rig or a new self-contained drill rig truck mounted (Geological Survey of Ireland)
The GSI inviting tenders from qualified organisations to supply new self-contained drill rig or a new self-contained drill rig truck mounted with the specification as laid out in Appendix 1 included in downloadable tender. View the procurement »
Mentioned suppliers: Boart Longyear BV
2014-09-12   Supply of Bus Stop Poles and Flags (National Transport Authority)
The Authority has identified a need for further dissemination of public transport information at bus stops nationally and intends to erect new bus poles, to be installed with foundation/ground retention sockets, and information display units, at bus stops. View the procurement »
Mentioned suppliers: Larkin Engineering Enterprises Limtied
2014-09-05   Supply of I.T Infrastructure Services (Dublin Airport Authority plc ( DAA ))
Supply of the following I.T infrastructure services and products throughout the Dublin Airport Campus in 1 complete package. View the procurement »
2014-09-02   Maynooth University Student Housing and Associated Siteworks (National University of Ireland, Maynooth (NUI Maynooth-NUIM))
The development will consist of the construction of the North Campus Student Housing Complex, total floor area circa 9,340 m², comprising 59 Student Apartments (50 X 5 Bed Units, 5 x 6 Bedroom Units, 4 x 3 Bedroom Duplex Units), 296nr bedspaces, Resident's Office, Student Social Room, Retail Unit, Bicycle Store (2 No), all arranged in 3 Courtyard Buildings ranging in height from 9, 5, 4 & 3 Storeys. View the procurement »
Mentioned suppliers: JJ Rhatigan & Company
2014-08-29   Appointment of a Multi-Party Framework Agreement for the Supply ONLY of Road Making Materials & Ancillary Products... (Local Government Operational Procurement Centre)
The Suppliers that are admitted to the Framework will be invited to participate in mini-competitions by the Contracting Authorities for nominated supply calls. View the procurement »
Mentioned suppliers: Details available from LAQuotes by email request
2014-08-29   Appointment to a Multi-Party Framework Agreement for the Supply and Placement of Road Making Materials and Ancillary... (Local Government Operational Procurement Centre)
This Framework relates to the procurement of contractors for the purpose of Supply and Placement of Road Making Materials and Ancillary Works to the Contracting Authorities for Works anticipated to be in excess of EUR 50 000 (net of VAT). View the procurement »
Mentioned suppliers: Details available from LAQuotes by e-mail request
2014-08-29   Wexford Garda Divisional HQ - Main Contractor - Pre-qualification (Office of Public Works ( OPW ))
The Commissioners of Public Works are seeking applications from experienced building contractors who wish to be pre-qualified to tender for the construction of a new 3 952 sqm Garda Divisional Headquarters on a site circa 2,79 hectares at Mulgannon Road, Wexford, Ireland. Separate notices will issue in respect of Mechanical, Electrical & Lift Specialists for this project. View the procurement »
2014-08-29   Wexford Garda Divisional HQ — Mechanical Specialist — Pre-qualification (Office of Public Works (OPW))
The Commissioners of Public Works are seeking applications from experienced mechanical contractors who wish to be considered for eligibility for inclusion on a panel of specialists to be named in the Main Contract tender documents for the construction of a new 3 952 sqm Garda Divisional Headquarters on a site circa 2.79 hectres at Mulgannon Road, Wexford, Ireland. View the procurement »
2014-08-29   Appointment to a Multi-Party Framework Agreement for Footpath & Road Pavement Restoration and Ancillary works for... (Local Government Operational Procurement Centre)
Appointment to a Multi-Party Framework Agreement for Footpath & Road Pavement Restoration and Ancillary Works for the Public Sector (for works anticipated to be less than EUR 50 000). View the procurement »
Mentioned suppliers: Details available from LAQuotes by email request
2014-08-29   Wexford Garda Divisional HQ — Lift Specialist — Pre-qualification (Office of Public Works (OPW))
The Commissioners of Public Works are seeking applications from experienced lift contractors who wish to be considered for eligibility for inclusion on a panel of specialists to be named in the Main Contract tender documents for the construction of a new 3 952 sqm Garda Divisional Headquarters on a site circa 2.79 hectres at Mulgannon Road, Wexford, Ireland. View the procurement »
2014-08-29   Wexford Garda Divisional HQ – Electrical Specialist – Pre-qualification (Office of Public Works (OPW))
The Commissioners of Public Works are seeking applications from experienced electrical contractors who wish to be considered for eligibility for inclusion on a panel of specialists to be named in the Main Contract tender documents for the construction of a new 3,952 sqm Garda Divisional Headquarters on a site circa 2,79 hectres at Mulgannon Road, Wexford, Ireland. View the procurement »
2014-08-28   Cork Lower Harbour Main Drainage Scheme — Directional Drill Estuary Crossing (Bord Gais Eireann/ Ervia)
Irish Water is undertaking the Cork Lower Harbour Main Drainage Scheme to provide waste-water collection storage and treatment for the catchment area which includes the towns of Cobh, Passage West, Monkstown, Ringaskiddy, and Carrigaline and adjoining areas. The project is divided into several contracts, the contract described herein is for the provision, trenchless laying and testing of 2 no. new 400 mm diameter nominal bore, 1 400 m long gravity sewer pipes beneath a 1 km wide body of open tidal … View the procurement »
2014-08-22   Electrical Installation Works - Construction of a new swimming pool complex, outdoor educational building, outdoor... (Mayo County Council)
Electrical Installation Works - SITE 1. New development of a swimming pool complex & outdoor eductional building, incorporating indoor swimming pools, viewing area, changing & storage facilites, fitness gym, aerobics studio, climbing wall, lecture rooms & associated offices, site services, carpark, pedestrian links at Knockacroghery, Castlebar, Co. Mayo. SITE 2. New development of outdoor playing pitches, athletic track & clubhouse, incorporating changing, toilet & storage facilities and all associated … View the procurement »
2014-08-22   Mechanical & CHP Installation Works - Construction of a new swimming pool complex, outdoor educational building,... (Mayo County Council)
Mechanical & CHP Installation Works - SITE 1. New development of a swimming pool complex & outdoor eductional building, incorporating indoor swimming pools, viewing area, changing & storage facilites, fitness gym, aerobics studio, climbing wall, lecture rooms and associated offices, site services, carpark, pedestrian links at Knockacroghery, Castlebar, Co. Mayo. SITE 2. New development of outdoor playing pitches, athletic track & clubhouse, incorporating changing, toilet & storage facilities and all … View the procurement »
2014-08-22   Athletics track, natural grass fully drained pitches, flood lighting and generator-Construction of swimming pool... (Mayo County Council)
Athletics track and associated facilities, natural grass fully drained pitches, flood lighting and generator — construction of a new swimming pool complex, outdoor educational building, outdoor playing pitches, athletic track and clubhouse at Castlebar, Co. Mayo. View the procurement »
2014-08-19   HOB Refurbishment Project (Design and Build) (Dublin Airport Authority plc (DAA))
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the ‘Employers Requirements Documents’. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose. View the procurement »
2014-08-18   Smartply seeks expressions of interest for the Engineering Design, Supply, Installation and Commissioning of Fire... (SmartPly Europe Ltd)
The general scope required is all inclusive for the detailed design, supply, installation, testing and commissioning of fire protection systems for SmartPly Renewal Project. The candidates must confirm they have the resources and capability to Design to FM, NFPA and VDE Standards. 1) Sprinkler system and hose reels to building extension of 10 000 m² approx. 2) Sprinkler system under new production line equipment and associated hosereels (800 m² approx). 3) Modification/extension to existing ductile iron … View the procurement »
2014-08-18   National Forensic Mental Health Services Facilities - Portrane - Advanced Works (Health Service Executive (HSE))
Advanced works to faciliate the construction of the New National Forensic Mental Health Facility at Portrane, Co. Dublin. Works will include the following indicative; The construction of a temporary construction access road Demolitions of and Asbestos Removal of 3No. single storey buildings (Reilly's Hill, Willowbrook and old shed), 1 No. 5 storey building (Nurses Home) and 1 No. 2 storey building (House 100). Service Diversions Accommodation Works Re-Routing of Pedestrian footpath Temporary Works Design View the procurement »
2014-08-14   PG108T926 Knottingley power CCGT development (Knottingley Power Limited)
The combined cycle gas turbine power station, to be constructed east of Knottingley, West Yorkshire, UK, will consist of up to 3 separate single shaft generating units, hybrid cooling towers and other ancillary structures and will have a nominal net electrical output capacity of no more than 1 500 MWe at ISO conditions. The power station will be gas fired and served by an 8 km long underground gas pipeline connecting the power station to the National Grid Transmission System south of the town of … View the procurement »
2014-08-14   Applications for Public Funding for the development of a Multifunctional Event Centre in Cork City (Cork City Council)
The development of a multifunctional venue of scale has been an objective of Cork City Council (the ‘Council’) since the 1990's. The existence of market failure has meant that without some level of public funding or subvention, potential investors would not proceed with the development of such a venue. In recognition of this the Irish Government has made up to 10 000 000 EUR available as part of the public sector support for this project and the Council will make further funding up to EUR4m available as … View the procurement »
2014-08-06   Coláiste an Chraoibhín, Fermoy (Cork Education and Training Board)
The construction of a new 3 846 m² stand-alone extension to the rear of the existing school associated ancillary site development works. View the procurement »
Mentioned suppliers: Sammon Contracting Ltd
2014-08-05   Supply of Bus Stop Timetable Display Units (National Transport Authority)
The Authority is seeking a supplier to provide bus stop timetable information display units suitable for attachment to new 60,3 mm diameter stainless steel (and painted steel) bus stop poles. The intended duration of the Contract is a two (2) year period. The height of the bus timetable information unit should be adjustable. Typical heights from ground level to the underside of the visible printed area will be between 0,9 m and 1,5 m. The units will be used to display bus travel information on printed … View the procurement »
Mentioned suppliers: Larkin Engineering Enterprises Limited
2014-07-31   Supply of Bus Stop Pole Foundation Sockets (National Transport Authority)
The Authority has identified a need for further dissemination of public transport information at bus stops nationally and intends to erect new bus poles, to be installed with foundation/ground sockets, and information display units at bus stops nationally. Section 3 of the Request for Tenders details the Specification for Bus Pole Foundation Sockets required of the successful Tenderer. View the procurement »
Mentioned suppliers: Ipl Group
2014-07-30   Contract for the Engineering Design, Supply, Installation and Commissioning of Environmental Abatement Equipment (SmartPly Europe Ltd)
The general scope required is all inclusive for the engineering, design, equipment supply, installation, commissioning and documentation for all environmental abatement equipment. Key features of the scope of supply are as follows: 1) Collection and transport of exhaust gases from Continuous Press (120,000 m³/hr approx.), Press Hall (90,000 m³/hr approx.) and Board Cooler (60,000 m³/hr approx.) to existing Wet Electrostatic Precipitators. 2) Pre-cleaning of the exhaust gas from the Continuous Press … View the procurement »
2014-07-23   Traffic Calming Maintenance Work (National Roads Authority (NRA))
The Contracting Authority (The National Roads Authority) (“NRA”) requires the services of Contractors for the maintenance of traffic calming schemes and pedestrian crossings in the Republic of Ireland. The Contracts include Cleaning, Maintenance, Inspection, Reporting, Inventory, Routine Fixing of Minor Defects and Schedule Works of Traffic Calming Schemes including replacement of Traffic Route Specific to Traffic Calming, and maintenance of Pedestrian signals as well as other ancillary works which may … View the procurement »
Mentioned suppliers: Clonmel Enterprises
2014-07-22   Bandon Flood Relief Scheme - Civil Engineering Works Contractor (Office of Public Works (OPW))
A Civil Works Contractor is required to undertake the Bandon Flood Relief Scheme which will include dredging of the channel for approximately 3.6 km, demolition and replacement of a pedestrian bridge, construction of new defence walls, construction of new defence embankments, construction of fish pass structures, construction of new culverts and works to existing drainage scheme. View the procurement »
2014-07-21   Electrical Reactive and Minor Work (Office of Public Works ( OPW ))
Reactive electrical maintenance in buildings. View the procurement »
2014-07-17   Provision and Operation of Campus Residences for Dublin City University (Dublin City University (DCU))
Provision and Operation of Campus Residences for Dublin City University. View the procurement »
2014-07-11   WCCC/R/003 – Framework Agreement for Pavement and Associated Minor Works for national roads (Waterford City and County Council)
The Contracting Authority wishes to establish and operate a multi-supplier. Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be minimum 3 and maximum 8 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 24 months. The Contracting Authority may, at its absolute discretion, extend the Framework Period by a further 24 months in 12 months increments such … View the procurement »