2019-01-28   Supply and Delivery of Small Plant Hand Held Power Tools and Equipment (Iarnrod Eireann-Irish Rail)
IÉ invites applications from suitably qualified companies to participate in the pre-qualification process for the proposed tender for the supply and delivery of small plant hand held power tools and equipment. The contract duration will be for a period of 3 years. Small plant comprises of specific, portable hand held equipment used by Permanent Way Infrastructure staff on Iarnród Éireann’s Rail Network. 17 lots with a detailed specification for each lot issued at tender stage. Each lot will be separately … View the procurement »
Mentioned suppliers: Advanced Technical Concepts Ltd Air Impact Ltd Cembre Ltd Geismar UK Ltd Swan Plant Hire Ltd Worlifts Ltd
2019-01-17   Integrated 150kW EV Charge Station Supporting Simultaneous Operation of Multiple Power Outlets Via Modular Power Units (Electricity Supply Board (ESB))
Supply integrated 150kW EV charge station supporting simultaneous operation of multiple power outlets via modular power units. View the procurement »
Mentioned suppliers: Delta Electronics (Netherlands) BV
2019-01-17   1) Integrated (Power Components and User Interface Required to be as a Single Unit) EV Charge Station Supporting 50... (Electricity Supply Board (ESB))
1) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 50 kW outlets via CHAdeMO/CCS and 43kW AC outlets; 2) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 25 kW outlets via CHAdeMO/CCS outlet. View the procurement »
Mentioned suppliers: ABB LTD Delta Electronics (Netherlands) BV Efacec Electric Mobility, S.A. Tokheim Ireland Ltd
2018-11-21   Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2018-10-17   Community Services for Renewable Energy Participation/Investment Models (Coillte CGA)
Coillte are seeking expressions of interest from suitably qualified community development advisors to lead the delivery of a number of objectives as set out in the summary document attached. Please also find attached a pre-qualification questionnaire document which will need to be completed by the deadline date stated, It is our intention to use a competitive dialogue procedure for this tender competition. View the procurement »
2018-10-16   Supply, Installation and Commissioning of Wind Turbines for Cloncreen Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates for the supply, installation and commissioning of 21 wind turbines and a long term (min 5 years) services and maintenance agreement for Cloncreen Wind Farm. View the procurement »
Mentioned suppliers: Vestas
2018-08-22   Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in … View the procurement »
2018-08-15   Design and supply of a power take off converter and control system for a 60 kw hydro-kinetic turbine (Design Pro Ltd.)
DesignPro is developing a hydro-kinetic turbine to generate electrical power from water flows. The turbine design deploys 2 hydrokinetic turbines connected to in-line gearboxes that drive standard 3 phase induction motors. Given the fluctuating power to be derived from variable water flows, the rotational speed of the turbines must be controlled to standardise the power output, which will need to be adapted to a standard acceptable for grid connection. Accordingly, the Company requires the design, supply … View the procurement »
2018-05-03   EV Ultra-Fast Charge Point Units (Electricity Supply Board (ESB))
The contracting entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 350kW capacity including associated equipment and services to be delivered in Ireland. These frameworks will not include installation of equipment. Lot 1 – Ultra fast charge points including greater than 100Kw and up to 350Kw dedicated output to CCS and Chademo. Lot 2 – Ultra fast charge points up to 160Kw simultaneous output to CCS and Chademo. Lot 3 – Ultra fast charge … View the procurement »
Mentioned suppliers: ABB LTD Efacec Electric Mobility, S.A.
2018-04-20   EV Charge Points Units up to circa 50kW (Electricity Supply Board (ESB))
The Contracting Entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 50kW capacity including associated equipment and services to be delivered in Ireland. View the procurement »
Mentioned suppliers: Ecotech e.U. Efacec Electric Mobility, S.A.
2018-04-06   Expression of interest in respect of EPC and O&M Services for Battery Energy Storage Systems (Coillte CGA)
Coillte CGA are seeking expressions of interest in respect of EPC and O&M services for Battery energy storage systems. Please find attached an expression of interest document and pre-qualification questionnaire which provides further detail on requirements. View the procurement »
2018-03-23   Soliciting interest to invest in Coillte’s portfolio of recently commissioned operating wind farms (Coillte CGA)
Coillte CGA is inviting potential investors to bring forward proposals for: A— the acquisition of the majority of the equity of Coillte’s share of 4 operating wind farms, in total reflecting 104 MW on a net equity basis (240 MW gross) of operating capacity, and B— the potential future acquisition of 2 projects currently in final planning review, representing 67.5 MW on a net equity ownership basis (90 MW gross), upon achieving either financial close or commercial operations. Coillte reserves the right to … View the procurement »
2018-02-06   Supply of Aircraft Fixed Electrical Ground Power Equipment - Cork and Dublin Airports (daa plc)
The Contracting Authority wishes to appoint a Suppliers to manufacture and supply Fixed Electrical Ground Power (FEGP) convertors and associated equipment on a non-exclusive basis to Cork and Dublin Airports for a five (5) year period with an option to extend for a further two (2) years. View the procurement »
Mentioned suppliers: ITW GSE ApS
2017-11-28   Framework Agreement for provision of renewable energy consultancy technical services (Coillte CGA)
Coillte CGA invite tenders for the provision of renewable energy consultancy technical services in respect of three lots. Please find tender documents attached with full details of requirements set out. View the procurement »
2017-10-18   Supply of an Ignition Quality Tester for the University of Limerick (Education Procurement Service (EPS))
Dear Tenderers, The Education Procurement Service (EPS) on behalf of the University of Limerick (the ‘Contracting Authority’) invites tenders (‘Tenders’) to this request for tenders (‘RFT’) from economic operators (‘Tenderers’) for the Supply of an Ignition Quality Tester for the University of Limerick. Kind regards, EPS Team. View the procurement »
2017-10-11   Request for Tender for provision and service of wind measuring met technologies to Coillte CGA (Coillte CGA)
Coillte invites suitable candidates to tender for provision and service of wind measuring met technologies to Coillte CGA under a Framework Agreement. Please find attached tender documentation and take note of the deadline for receipt of tenders. View the procurement »
2017-09-08   Dublin Airport Static Inverter Upgrade (daa plc)
Please see RFT which is available to download at www.etenders.gov.ie View the procurement »
2017-08-11   Brighouse Bay Compressor Station Turbine Control System Upgrade (Units A-C) (Ervia)
The design, manufacture, delivery, installation, commissioning, performance evaluation, certification, maintenance and training in respect of safe use of gas turbine control systems and on package ancillaries. View the procurement »
2016-07-04   Expression of interest in respect of Grid Connection Works Contract for Cullenagh Wind Farm (Coillte Teoranta)
Coilllte invites expressions of interest from suitable candidates to express an interest in grid connection works in respect of its Cullenagh Wind Farm. Please find attached an Expression of Interest Document which details a summary of requirements and a Pre-Qualification Questionnaire for completion. View the procurement »
2016-06-09   Independent Condition Assessment / Statutory Inspections — ESB Wind Farms (Electricity Supply Board and/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
Frameworks for: 1. Independent Condition Assessment Services. 2. Statutory Inspections. for ESB Wind Farms on the islands of Ireland and Great Britain. View the procurement »
2016-03-14   MTU Generators Spare Parts and Associated Services (Irish Naval Service)
The Irish Naval Service request tender submissions for the supply of spare parts and associated services for MTU Generators for the Naval Fleet. View the procurement »
Mentioned suppliers: James Troop and Co. Limited
2016-03-10   Supply of an Ocean Basin Wave Generator and a Multi-directional Wave Basin Moveable Platform (University College Cork ( UCC ))
The supply of a multi-directional wave generator with the ability to produce digitally controlled pseudo random waves consisting of user defined spectra and directions and an internal moveable platform. View the procurement »
Mentioned suppliers: Edinburgh Designs Ltd
2015-05-06   Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2015-04-27   Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionnaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2015-03-20   Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020. To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project … View the procurement »
2015-03-13   Supply of operation and maintenance services for Coillte Windfarm (Coillte Teoranta)
Including the following (but not limited to): Review of existing HSE documentation and a ground-level visual inspection of all civil, structural, mechanical electrical infrastructure and works associated with the wind farm facility, shall compile a site-specific Health and Safety Management system including a comprehensive Operations Health and Safety Plan, implement the Renewable UK Wind Turbine Safety Rules (WTSR), shall act as Operational Controller and carry out and record Transfer of Control (TOC) … View the procurement »
2015-02-13   Design, Installation and operation of CHP Plant at UCD (University College Dublin (UCD))
UCD requires the market to propose a solution for the design, installation, operation and maintenance of a CHP package that best suits UCD's goals as outlined. The primary goal of this project is to reduce UCD's energy consumption and provide long-term energy management solutions. It is likely that UCD will be entering into a long-term contract (maximum 15 years) with the successful candidate for the supply, commissioning and operation of new CHP high efficient plant, with an energy performance contract … View the procurement »
2014-12-03   Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
2014-11-19   Maintenance of Electrical Rotating Equipment (Iarnrod Eireann-Irish Rail)
Maintenance of Electrical Rotating Machines/Components. View the procurement »
Mentioned suppliers: Green Net Supplies Ltd
2014-07-03   HSE 2691 - Supply, Deliver, Mechanically install and Commission a 1 500 kva standby Generator (Health Service Executive (HSE))
The supply, delivery, install and commission of a 1 500 KVA standby diesel generator (including a three year warranty & three year maintenance contract), to be installed within a dedicated sound attenuated room. Supply and installation of a new 48 hr double skinned steel thin walled fuel tank and fuel lines to service the new 1 500 kva diesel generator Tenderer's must include in their bid submission, for the decommission, removal and disposal of the current Generator in St Mary's Hospital. View the procurement »
2014-05-09   PG108T909 – ESB Wind Turbines & Long Term Services & Availability Framework (ESB &/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
ESB plans to develop circa 12 wind farms (up to circa 300 MW – with the potential that this may extend to 500 MW – in aggregate) in the period from Q2, 2015 to Q4, 2019. The potential scale of these individual windfarm developments is that they are expected to typically range between 15 MW & 50 MW. There is the potential that certain individual windfarm developments may be up to 100MW. This call for competition is to establish a framework agreement. The scope of supply is the supply, erection and … View the procurement »
Mentioned suppliers: Nordex Energy Ireland Limited Siemens Limited Vestas Ireland Ltd
2014-03-28   Civil Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre-qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-03-28   Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-02-19   SC 02/14 OPL - Supply, erection and commissioning of wind turbines for Oweninny Wind Farm (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Owenniny Power Limited. The Joint Venture parties are Bord Na Mona Energy Limited and ESB Wind Development Limited. Expressions of interest are invited from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Oweninny Wind Farm. Oweninny Wind Farm Phase 1 and Phase 2 will have circa 172 MW capacity. A long term (minimum 5 years) services and maintenance agreement … View the procurement »
2014-01-17   pelton turbine1294 kva (Ecotricity Ltd)
Pelton turbine. View the procurement »
Mentioned suppliers: Hydrohrom s.r.o
2013-12-12   Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2013-12-11   PG108T810 West Wave (Electricity Supply Board)
ESB invites expressions of interest from suitably qualified candidates interested in being considered for participation in the Procurement Process for the supply and installation including all ancillary requirements of a 5MW Wave Energy array at one of a number of potential locations off the west coast of Ireland. ESB will use the negotiated procedure under Directive 2004/17/EC. All of the terms and conditions will be subject to negotiation between the parties. The general procurement approach will be … View the procurement »
2013-08-02   RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
2013-04-26   CHP - CHP (National University of Ireland, Galway (NUI Galway))
Supply, install & commission a containerised CHP unit for NUI Galway View the procurement »
2013-04-24   bruree hydro - Supply new turbine / generator package to supply 140 kw to national grid (Bruree Hydro)
Upgrade existing hydro power station by supplying a new turbine to repace 3 small turbines. View the procurement »
2013-02-27   Upgrade of Quarryvale Drainage Pumping Station - Phase 2 (South Dublin County Council)
Installation of a standby generator, odiurcontrol unit, and replacement of 2no. foul water pumps with associated electrical works. Also widening of entrance and installation of security fencing. View the procurement »
2013-02-01   RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of: 1) Planning & Environmental Assessment; 2) Archaeological, Architectural & Cultural Heritage; 3) Hydrology, Hydrogeology & Water Quality; 4) Geotechnical; 5) Noise & Vibration; 6) Landscape & Visual Impact Assessment; 7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ; 8) Shadow Flicker Assessment; 9) … View the procurement »
2012-12-19   PG108T829 Raheenleagh Wind Turbines (ESB &/or its Subsidiaries & Joint Venture Partnerships (hereinafter referred to as ESB))
It is ESBs intention to award this contract through a Joint Venture company. ESBs Joint Venture Partner is Coillte. ESB invites expressions of interest from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Raheenleagh Wind Farm. A long term (minimum 2 years) services and maintenance agreement also forms part of the scope of supply. Proposals for assistance in funding the project may also be requested. ESB will use the negotiated … View the procurement »
2012-11-05   Supply of Generator (Dublin Port Company)
Supply and delivery of a standby diesel generator for a new firemain. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=529352. View the procurement »
2012-10-05   Selection of Consultancy Services Panels for Coillte’s Wind Farm Projects (Coillte)
Introduction. Coillte Wind Energy request expressions of interest for the qualification of service providers for the provision of various services across 5 separate lots as outlined below: Lot 1: EIA and Engineering Consultancy. Lot 2: Wind Analysis. Lot 3: Grid and Electrical Infrastructure. Lot 4: Mechanical and Electrical Procurement Consultants. Lot 5: Radio Analysis and Planning Services. Background to Coillte: Coillte was established under the Forestry Act 1988, which defines the principal … View the procurement »
2012-06-29   IDA 500KW wind turbine supply and installation project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the supply and installation Contractor of a 500KW wind turbine at the IDA Business Park, Mullagharlin, Dundalk, with responsibility to procure, install, commission and complete the Works in accordance with the Works Requirements. The wind turbine must comply with IEC Class 11A and Class 111A. The supply and installation contractor will be novated to … View the procurement »
2012-06-29   IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at … View the procurement »
2012-05-21   FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational … View the procurement »