2023-10-23   GWM14870 Framework Agreement to Complete Generator Rotor Removal, Inspection, Electrical Testing and... (Electricity Supply Board ESB)
GWM14870 Framework Agreement for Contractor/Service Provider to provide Resources/Manpower, Tooling and Test Equipment to Complete Generator Rotor Removal, Inspection, Electrical Testing and Generator/Turbine Realignment of Two Hydro Units at Electricity Supply Board (ESB) Ardnacrusha Generating Station Located in the Republic of Ireland. View the procurement »
2023-08-22   8498 - Corporate Power Purchase Agreement for Iarnród Éireann (Iarnrod Eireann-Irish Rail)
Call to competition by Iarnród Éireann (IÉ) for the procurement of financially-settled renewable electricity and the associated guarantee of origin certificates (GOs) via a newly built offsite corporate power purchase agreement (CPPA) View the procurement »
2023-05-15   Consultancy Services for Single Point of Contact (Renewable Energy) for SEAI (Sustainable Energy Authority of Ireland)
The objective of this RFT is to invite proposals from suitably qualified service providers to research the role of the Single Point of Contact (Renewable Energy) as defined by existing and upcoming EU legislation and examine how this role might best add value to the licensing and permitting system and contribute towards the achievement of the overall aim, which is to speed up the deployment of energy from renewable sources. The final deliverable from this service will be a suite of detailed options for … View the procurement »
2023-04-04   Environmental Assessment of Services for the Review of the National Ports Policy (Department of Transport)
Strategic Environmental Assessment (SEA) Services, Appropriate Assessment (AA) Services and Strategic Flood Risk Assessment (SFRA) Services for The Review of National Ports Policy incorporating the Policy Statement on the facilitation of Offshore Renewable Energy by Commercial Ports in Ireland . View the procurement »
2022-11-23   Provision of a Framework Agreement for Civil Works Balance of Plant (CBOP) to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from suitably qualified candidates for inclusion on a Framework Agreement for Civil Works Balance of Plant (CBOP) for a significant pipeline of wind development projects. Please find attached our expression of interest document (in PDF and Word format) which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-11-04   Rosslare Europort Offshore Renewable Energy Hub Project (ORE) Phases 3 and 4 Consultancy (Iarnrod Eireann-Irish Rail)
Deliver consultancy services for the Rosslare Europort Offshore Renewable Energy Hub project View the procurement »
2022-11-02   Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-07-13   FW Supply & Delivery Wind Turbine Components Ireland 1228 (SSE Renewables Wind Farms (Ireland) Limited)
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
2022-06-28   Grant Making Organisation for Community Benefit Funds for the Island of Ireland (Electricity Supply Board ( ESB ))
ESB seeks to award a contract for provision of Community Benefit Funds for all renewable projects. View the procurement »
Mentioned suppliers: SECAD Partnership CLG
2022-03-28   Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots): 1. Land Identification and Mapping 2. Land Agency Services 3. Turbine Delivery Route Assessment 4, Declaration of Identity Services 5. Other Land Based Services Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements. View the procurement »
2022-03-02   Civil Balance of Plant for Derrinlough Wind Farm (Bord Na Mona)
The Company intends to procure to procure works, supplies and design and build services related to the civil balance of plant for the Derrinlough Wind Farm project. The Company plans to develop the project commencing in 2022. The scope of work for Contract shall include the design, procurement, and installation. Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice for further information on the scope and tender process. View the procurement »
Mentioned suppliers: Bam Civil Limited
2021-12-17   Expression of interest for an Innovative Partnership Process between FuturEnergy Ireland and Candidate Long Duration... (FuturEnergy Ireland Development DAC)
The purpose of this pre-qualification questionnaire is to identify suitably qualified technology providers developing long duration storage technologies with the potential to cost effectively solve grid congestion and system integration challenges on a power system with up to 80% renewables (primarily wind energy). The ultimate aim / ambition of this process is the deployment of at least 500MW of 12-100hr storage on the Irish power system by 2030. Please find pre-qualification questionnaire attached with … View the procurement »
2021-12-17   Inclusion on a Framework Agreement for provision of legal services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland (the “Contracting Entity”) are seeking to invite suitably qualified firms who are interested in participating in this competition for inclusion on a Framework Agreement regarding the provision legal services. The core scope of services required from the selected candidate(s) will include, but is not limited, to the items set out in the Pre-Qualification Questionnaire (PQQ) attached to this notice. Please note that the services are categorised into four lots. Candidates may apply for … View the procurement »
2021-11-10   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Mentioned suppliers: Vestas
2021-10-11   Provision of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm – Coillte CGA (Coillte CGA)
Coillte invites expressions of interest from suitable candidates in respect of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm. Please refer to the expression of interest document (PQQ) attached for further details on requirements. Please also note that this document must be completed and returned by the deadline cited. View the procurement »
2021-10-07   Provision of Civil Works Balance of Plant (CBOP) for a Utility Scale Wind Farm – Coillte CGA (Coillte CGA)
Coillte CGA invite expressions of interest from suitably qualified candidates in respect of Civil Works Balance of Plant (CBOP) for a Utility Scale Wind Farm. Please refer to the expression of interest document (PQQ) attached for further details on requirements. Please also note that this document must be completed and returned by the deadline cited. View the procurement »
2021-09-27   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-03-04   Civil Balance of Plant for Derryadd Wind Farm (Bord Na Mona)
The company intends to procure to procure works, supplies and design and build services related to civil balance of plant for the Derryadd wind farm project. The company plans to develop the project commencing in 2021. The scope of work for contract shall include the design, procurement and installation. View the procurement »
2021-01-21   Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
2020-08-05   DPS for the Provision of Goods and Services for Energy and Climate Action Consultancy Projects and for the Provision... (3 Counties Energy Agency)
The 3 Counties Energy Agency (‘3CEA’) (the ‘Contracting Authority’) is issuing this request for applications to participate (‘RFATP’) in a Dynamic Purchasing System (‘DPS’) on its own behalf and on behalf of other agencies and public bodies such as SEAI Sustainable Energy Communities, members of the Association of Irish Energy Agencies (AIEA), One-Stop-Shops under the aegis of the National Retrofit Delivery Body, local authorities and LEADER companies. The DPS will be coordinated and managed by the 3CEA. View the procurement »
2020-05-29   Inclusion on a Framework Agreement for Provision of Grid Services to Coillte’s Renewable Energy Business (Coillte CGA)
Coillte wishes to appoint a framework of grid consultants to provide advice and support related to the grid connection, substation design, electrical balance of plant (EBOP) and civil balance of plant (CBOP) of various renewable energy and energy storage projects, and associated electrical infrastructure. To this end we now invite suitably qualified candidates to express an interest in this competition in respect of the areas of expertise (lots) outlined in the summary document attached. Please note that … View the procurement »
2020-05-27   Service and Availability Agreements for ESB Windfarms in Ireland and UK (Electricity Supply Board (ESB))
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
2020-05-26   Framework Agreement for Provision of Lidar Equipment to Coillte CGA (Coillte CGA)
Coillte CGA invites tenders for provision of LIDAR equipment as per the tender document attached to this notice. The objective of this tender competition is to: A. appoint successful candidate(s) to a framework agreement for LiDAR wind measurement equipment requirements going forward for the life of the framework; and B. purchase three initial LiDAR wind measurement devices that meet the technical criteria outlined in the tender document attached. View the procurement »
2020-05-04   OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
2020-04-01   Provision of Corporate Finance Advisory Services for Coillte’s Renewable Energy Business (Coillte CGA)
Coillte CGA (Coillte or the Company) invites expressions of interest in respect of a tender process which it expects to commence in April 2020 for the provision of corporate finance advisory services for its Renewable Energy Business, as described in the summary document attached. View the procurement »
2019-11-25   Wind Turbines Supply for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
Mentioned suppliers: Nordex Energy Ireland
2019-11-22   Inclusion on a Wind Energy Framework Agreement for Provision of Environmental and Planning Services to Coillte CGA (Coillte CGA)
Coillte CGA invites expressions of interest from suitably qualified candidates for inclusion on a wind energy framework agreement for environmental and planning services. Please find attached a summary document which provides further details of our requirements and instructions to candidates. Interested parties must complete the pre-qualification questionnaire attached to this notice and take note of the deadline for receipt of submissions. View the procurement »
2019-06-12   Provision of Environmental and Planning Services for Ballynagree Wind Farm (Coillte CGA)
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached. Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition. View the procurement »
2018-11-21   Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2018-10-17   Community Services for Renewable Energy Participation/Investment Models (Coillte CGA)
Coillte are seeking expressions of interest from suitably qualified community development advisors to lead the delivery of a number of objectives as set out in the summary document attached. Please also find attached a pre-qualification questionnaire document which will need to be completed by the deadline date stated, It is our intention to use a competitive dialogue procedure for this tender competition. View the procurement »
2018-10-16   Supply, Installation and Commissioning of Wind Turbines for Cloncreen Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates for the supply, installation and commissioning of 21 wind turbines and a long term (min 5 years) services and maintenance agreement for Cloncreen Wind Farm. View the procurement »
Mentioned suppliers: Vestas
2018-04-06   Expression of interest in respect of EPC and O&M Services for Battery Energy Storage Systems (Coillte CGA)
Coillte CGA are seeking expressions of interest in respect of EPC and O&M services for Battery energy storage systems. Please find attached an expression of interest document and pre-qualification questionnaire which provides further detail on requirements. View the procurement »
2018-03-23   Soliciting interest to invest in Coillte’s portfolio of recently commissioned operating wind farms (Coillte CGA)
Coillte CGA is inviting potential investors to bring forward proposals for: A— the acquisition of the majority of the equity of Coillte’s share of 4 operating wind farms, in total reflecting 104 MW on a net equity basis (240 MW gross) of operating capacity, and B— the potential future acquisition of 2 projects currently in final planning review, representing 67.5 MW on a net equity ownership basis (90 MW gross), upon achieving either financial close or commercial operations. Coillte reserves the right to … View the procurement »
2017-11-28   Framework Agreement for provision of renewable energy consultancy technical services (Coillte CGA)
Coillte CGA invite tenders for the provision of renewable energy consultancy technical services in respect of three lots. Please find tender documents attached with full details of requirements set out. View the procurement »
2017-10-11   Request for Tender for provision and service of wind measuring met technologies to Coillte CGA (Coillte CGA)
Coillte invites suitable candidates to tender for provision and service of wind measuring met technologies to Coillte CGA under a Framework Agreement. Please find attached tender documentation and take note of the deadline for receipt of tenders. View the procurement »
2016-07-04   Expression of interest in respect of Grid Connection Works Contract for Cullenagh Wind Farm (Coillte Teoranta)
Coilllte invites expressions of interest from suitable candidates to express an interest in grid connection works in respect of its Cullenagh Wind Farm. Please find attached an Expression of Interest Document which details a summary of requirements and a Pre-Qualification Questionnaire for completion. View the procurement »
2016-06-09   Independent Condition Assessment / Statutory Inspections — ESB Wind Farms (Electricity Supply Board and/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
Frameworks for: 1. Independent Condition Assessment Services. 2. Statutory Inspections. for ESB Wind Farms on the islands of Ireland and Great Britain. View the procurement »
2015-05-06   Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2015-04-27   Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionnaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2015-03-13   Supply of operation and maintenance services for Coillte Windfarm (Coillte Teoranta)
Including the following (but not limited to): Review of existing HSE documentation and a ground-level visual inspection of all civil, structural, mechanical electrical infrastructure and works associated with the wind farm facility, shall compile a site-specific Health and Safety Management system including a comprehensive Operations Health and Safety Plan, implement the Renewable UK Wind Turbine Safety Rules (WTSR), shall act as Operational Controller and carry out and record Transfer of Control (TOC) … View the procurement »
2014-12-03   Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
2014-05-09   PG108T909 – ESB Wind Turbines & Long Term Services & Availability Framework (ESB &/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
ESB plans to develop circa 12 wind farms (up to circa 300 MW – with the potential that this may extend to 500 MW – in aggregate) in the period from Q2, 2015 to Q4, 2019. The potential scale of these individual windfarm developments is that they are expected to typically range between 15 MW & 50 MW. There is the potential that certain individual windfarm developments may be up to 100MW. This call for competition is to establish a framework agreement. The scope of supply is the supply, erection and … View the procurement »
Mentioned suppliers: Nordex Energy Ireland Limited Siemens Limited Vestas Ireland Ltd
2014-03-28   Civil Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre-qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-03-28   Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2014-02-19   SC 02/14 OPL - Supply, erection and commissioning of wind turbines for Oweninny Wind Farm (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Owenniny Power Limited. The Joint Venture parties are Bord Na Mona Energy Limited and ESB Wind Development Limited. Expressions of interest are invited from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Oweninny Wind Farm. Oweninny Wind Farm Phase 1 and Phase 2 will have circa 172 MW capacity. A long term (minimum 5 years) services and maintenance agreement … View the procurement »
2013-12-12   Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2013-08-02   RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
2013-02-01   RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of: 1) Planning & Environmental Assessment; 2) Archaeological, Architectural & Cultural Heritage; 3) Hydrology, Hydrogeology & Water Quality; 4) Geotechnical; 5) Noise & Vibration; 6) Landscape & Visual Impact Assessment; 7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ; 8) Shadow Flicker Assessment; 9) … View the procurement »
2012-12-19   PG108T829 Raheenleagh Wind Turbines (ESB &/or its Subsidiaries & Joint Venture Partnerships (hereinafter referred to as ESB))
It is ESBs intention to award this contract through a Joint Venture company. ESBs Joint Venture Partner is Coillte. ESB invites expressions of interest from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Raheenleagh Wind Farm. A long term (minimum 2 years) services and maintenance agreement also forms part of the scope of supply. Proposals for assistance in funding the project may also be requested. ESB will use the negotiated … View the procurement »