Procurements: Wind turbine generators
>20 archived procurements
Wind turbine generators have been procured by organizations such as Bord Gais Eireann, Bord Na Mona, and Coillte Teoranta.
Historically, suppliers within this area have been Vestas, Enercon Gmbh, Gamesa Eolica S.L.U., Nordex Energy Ireland, Nordex Uk Ltd, and Siemens Ltd.
- Electrical machinery, apparatus, equipment and consumables; lighting (11 new procurements)
- Electric motors, generators and transformers (1)
- Generators
- Generating sets
- Wind-energy generators
- Wind turbine generators ⬅️
Recent procurements of wind turbine generators in Ireland
2026-03-18
Multi-Supplier Framework Agreement for the Supply of Electrical Class Consumables to Limerick and Clare Education... (Limerick and Clare Education and Training Board)
For the Supply of Electrical Class Consumables to Limerick and Clare Education and Training Board View the procurement »
For the Supply of Electrical Class Consumables to Limerick and Clare Education and Training Board View the procurement »
2025-08-07
Strategic Environmental Assessment of National ORE DMAP (Department of Climate Energy and the Environment)
In order to further accelerate the process of site designation for Offshore Renewable Energy, the Government (through a memo for information in April 2025) signalled its intention that a single National ORE DMAP was the optimal choice for efficient delivery of Ireland’s offshore wind energy needs. The goal of this DMAP will be to designate sites around Ireland's entire maritime area capable of delivering at least 15GW of energy by 2040, which along with the South Coast DMAP and the Phase One projects, … View the procurement »
In order to further accelerate the process of site designation for Offshore Renewable Energy, the Government (through a memo for information in April 2025) signalled its intention that a single National ORE DMAP was the optimal choice for efficient delivery of Ireland’s offshore wind energy needs. The goal of this DMAP will be to designate sites around Ireland's entire maritime area capable of delivering at least 15GW of energy by 2040, which along with the South Coast DMAP and the Phase One projects, … View the procurement »
2025-08-07
Appropriate Assessment of National ORE DMAP (Department of Climate Energy and the Environment)
In order to further accelerate the process of site designation for Offshore Renewable Energy, the Government (through a memo for information in April 2025) signalled its intention that a single National ORE DMAP was the optimal choice for efficient delivery of Ireland’s offshore wind energy needs. The goal of this DMAP will be to designate sites around Ireland's entire maritime area capable of delivering at least 15GW of energy by 2040, which along with the South Coast DMAP and the Phase One projects, … View the procurement »
In order to further accelerate the process of site designation for Offshore Renewable Energy, the Government (through a memo for information in April 2025) signalled its intention that a single National ORE DMAP was the optimal choice for efficient delivery of Ireland’s offshore wind energy needs. The goal of this DMAP will be to designate sites around Ireland's entire maritime area capable of delivering at least 15GW of energy by 2040, which along with the South Coast DMAP and the Phase One projects, … View the procurement »
2025-02-26
A Multi- Supplier Framework Agreement for the Supply of Electrical Instrumentation Class Consumables to Limerick and... (Limerick and Clare Education and Training Board)
For the Supply of Electrical Instrumentation Class Consumables to Limerick and Clare Education and Training Board, including Training Equipment. View the procurement »
For the Supply of Electrical Instrumentation Class Consumables to Limerick and Clare Education and Training Board, including Training Equipment. View the procurement »
2023-10-23
GWM14870 Framework Agreement to Complete Generator Rotor Removal, Inspection, Electrical Testing and... (Electricity Supply Board ESB)
GWM14870 Framework Agreement for Contractor/Service Provider to provide Resources/Manpower, Tooling and Test Equipment to Complete Generator Rotor Removal, Inspection, Electrical Testing and Generator/Turbine Realignment of Two Hydro Units at Electricity Supply Board (ESB) Ardnacrusha Generating Station Located in the Republic of Ireland. View the procurement »
GWM14870 Framework Agreement for Contractor/Service Provider to provide Resources/Manpower, Tooling and Test Equipment to Complete Generator Rotor Removal, Inspection, Electrical Testing and Generator/Turbine Realignment of Two Hydro Units at Electricity Supply Board (ESB) Ardnacrusha Generating Station Located in the Republic of Ireland. View the procurement »
2022-11-02
Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-07-13
FW Supply & Delivery Wind Turbine Components Ireland 1228 (SSE Renewables Wind Farms (Ireland) Limited)
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
2021-11-10
Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-09-27
Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-01-21
Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
2020-05-27
Service and Availability Agreements for ESB Windfarms in Ireland and UK (Electricity Supply Board (ESB))
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
2020-05-04
OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
2019-11-25
Wind Turbines Supply for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
2018-11-21
Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2014-12-03
Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
2013-12-12
Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2013-08-02
RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
2012-06-29
IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at … View the procurement »
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at … View the procurement »
2012-05-21
FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational … View the procurement »
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational … View the procurement »
2011-03-03
Multi supplier framework for wind turbine contracts relating to bord gais wind farm developments (Bord Gais Eireann)
The anticipated scope applicable to the framework includes but is not limited to the following works: — Wind turbine generator supply and commission including associated turbine electrical works and SCADA system. The client may also require any one or combination of, the following additional services under the framework. — Wind turbine foundation design, — Wind turbine foundation construction including concrete bases, excavation to suitable formation level and build up to the required level, — Complete … View the procurement »
The anticipated scope applicable to the framework includes but is not limited to the following works: — Wind turbine generator supply and commission including associated turbine electrical works and SCADA system. The client may also require any one or combination of, the following additional services under the framework. — Wind turbine foundation design, — Wind turbine foundation construction including concrete bases, excavation to suitable formation level and build up to the required level, — Complete … View the procurement »
2009-08-20
Wind turbines (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
Title attributed to the contract by the contracting authority: EOI Procurement of Micro-Generation Laboratories - wind turbines. FÁS intends to install 2 Micro Generation Labs in it’s training centre network and are seeking expressions of interest to:-. Supply equipment for the purpose of providing training in relation to Micro Generation, utilising a renewable energy system - wind turbine systems for two training sites (1 in Finglas and 1 in Galway) 2. Supply, install and commission a working wind … View the procurement »
Title attributed to the contract by the contracting authority: EOI Procurement of Micro-Generation Laboratories - wind turbines. FÁS intends to install 2 Micro Generation Labs in it’s training centre network and are seeking expressions of interest to:-. Supply equipment for the purpose of providing training in relation to Micro Generation, utilising a renewable energy system - wind turbine systems for two training sites (1 in Finglas and 1 in Galway) 2. Supply, install and commission a working wind … View the procurement »
2009-06-05
Wind turbines (Bord Gais Eireann)
Title attributed to the contract by the contracting entity: Turbines, Wind Generation & Ancillary Kit Items. Bord Gais Strategic Investments division is responsible for assessing, appraising and evaluating Strategic Projects on power generation, gas storage-transmission-distribution, and energy supply areas that contribute to the future strategic asset base of the company. Development, Construction and Operation of Wind Generation Assets. BGE are currently progressing an opportunity to place wind … View the procurement »
Title attributed to the contract by the contracting entity: Turbines, Wind Generation & Ancillary Kit Items. Bord Gais Strategic Investments division is responsible for assessing, appraising and evaluating Strategic Projects on power generation, gas storage-transmission-distribution, and energy supply areas that contribute to the future strategic asset base of the company. Development, Construction and Operation of Wind Generation Assets. BGE are currently progressing an opportunity to place wind … View the procurement »
2009-05-09
Civil engineering consultancy services (Coillte Teoranta)
Title attributed to the contract by the contracting authority: Supply of On-Shore Wind Project Consultancy Services. Coillte request expressions of interest for the qualification of Consultants for the provision of services relating to the permitting, design, project management, procurement of specialist contractors, cost management and construction management of designated Wind Farm Projects within the Republic of Ireland. The Commission for Electricity Regulation set out its direction in Gate 3 of … View the procurement »
Title attributed to the contract by the contracting authority: Supply of On-Shore Wind Project Consultancy Services. Coillte request expressions of interest for the qualification of Consultants for the provision of services relating to the permitting, design, project management, procurement of specialist contractors, cost management and construction management of designated Wind Farm Projects within the Republic of Ireland. The Commission for Electricity Regulation set out its direction in Gate 3 of … View the procurement »
2008-12-10
Engineering studies (EirGrid plc)
Title attributed to the contract by the contracting entity: All Island TSO Facilitation of Renewables Studies. To meet the Renewable Energy Sources EU policy for the consumption of energy, both in Ireland and Northern Ireland, will require significant changes to the existing portfolio of generation and networks by 2020. This transformation will present significant technical challenges to both system operators. It is essential to understand the fundamental issues underpinning this transformation in order … View the procurement »
Title attributed to the contract by the contracting entity: All Island TSO Facilitation of Renewables Studies. To meet the Renewable Energy Sources EU policy for the consumption of energy, both in Ireland and Northern Ireland, will require significant changes to the existing portfolio of generation and networks by 2020. This transformation will present significant technical challenges to both system operators. It is essential to understand the fundamental issues underpinning this transformation in order … View the procurement »