2020-02-24Consultancy Services for Suir Island Infrastructure Links (Tipperary County Council)
Tipperary County Council require the services of a multi disciplinary design team to design enhanced pedestrian and cyclist links from the Suir Blueway at the Gas house bridge to the town centre and Suir Island. The proposed infrastructure includes:
(e) 2 bridges over the River Suir measuring 56 m and 46 m in length connecting Suir Island to the Quay and Raheen Road;
(f) a boardwalk approximately 154 m in length to connect the Island amenity area, the bridges referenced above and the car park;
(g) …
View the procurement » Mentioned suppliers:Clifton Scannell Emerson Associates
2020-02-14Energy Trading Services (EirGrid plc)
Under the requirements of European Network Codes, interconnector capacity is considered firm. The interconnector operators manage the commercial exposure associated with physical unavailability on the link. This objective is captured under the SEM NRA decision on balance responsibility, as set out in the ‘Interim Cross Zonal TSO Arrangements for GB-ISEM go-live’ where interconnector owners are assigned responsibility for management of imbalance charges in the event of a forced outage.
Imbalance charges …
View the procurement »
2020-02-12Irish National Heritage Park — Traffic, Environmental, Planning and Marine Works (Wexford County Council)
The project is to create, develop and incorporate a new experience ‘Vykingar — Beyond Legend’ into the Irish National Heritage Park to provide a unique visitor experience that is capable of attracting in excess of 150 000+ paying visitors annually.
The services required for this appointment will include the following:
— preparation of traffic and environmental assessments,
— environmental reports – EIA and NIS,
— collation of planning and foreshore applications,
— preliminary design for traffic and …
View the procurement » Mentioned suppliers:Roughan & O'donovan
2020-02-08Electrical Services (Office of Public Works (OPW))
The commissioners of Public Works in Ireland has a requirement for the provision of electrical services at Dublin Castle, Farmleigh House, Castletown House and Iveagh House. The requirement will be based on a minimum of 2 electricians for a 40 hour week based on 8.30 a.m.-5 p.m. From time to time the requirement may increase, there will be a requirement for out of hours attendance at all venues from time to time to include evenings and weekends.
View the procurement » Mentioned suppliers:ETAV Limited
2020-02-03Multi-Party Framework Agreement for the Provision of Basement Impact Assessment Auditor Services (Dublin City Council)
The successful tenderer (Auditor) is required to conduct a review of a basement impact assessment submission for compliance and adequacy and shall confirm whether the BIA has been completed and has addressed all DCC policies as specified and outlined in the Basement Development Policy and Basement Development Guidance documents. The Auditor is then required to prepare an audit report for submission to the DCC Environment and Transport (E&T) Department.
A multi-party framework agreement to audit basement …
View the procurement »
2020-01-31LEE764C — EPA — RFT for the Contract for Services for the NRMN Renewal Project (Education Procurement Service (EPS))
The Environmental Protection Agency (EPA) wishes to source and appoint a contract for services to provide a suitably qualified and experienced full-time resource to act as a project management co-ordinator and liaison. The bulk of this role will be in project coordination to implement the National Radiation Monitoring Network (NRMN) and to manage and create contacts and work on logistics and telemetry/telecomms to adapt new and existing partners into the renewed NRMN. Additional duties will include …
View the procurement » Mentioned suppliers:Inhouse Technologies Ltd
2020-01-25Civil Structural Engineering Services for Additional Accommodation at Presentation Secondary School, Listowel (Presentation Secondary School (Listowel))
Civil structural engineering services for additional accommodation at Presentation Secondary School, Listowel comprising:
— 3 general Classrooms 58 m each (prefab replacement),
— 2 science labs 88,6 m each,
— 1 science prep area 38 m,
— 2 general classrooms for moderate learning disabilities 28,6 m,
— student and staff toilets,
— locker space,
— circulation 119 m,
— internal partitions 39,8 m,
— staircases and lift 120 m,
— giving a gross floor area of 848,4 m,
— also clear out 2 existing labs and …
View the procurement » Mentioned suppliers:MRG