2022-07-22   Supply and Delivery of unresonated Impedance Bond (Iarnrod Eireann-Irish Rail)
Supply and Delivery of unresonated Impedance Bond View the procurement »
Mentioned suppliers: Rivval Limited
2022-05-19   Sign Support Units for use with Temporary Speed Restriction Signs (Iarnrod Eireann-Irish Rail)
8015 –Sign Support Units for use with Temporary Speed Restriction (TSR) Signs on the Running Line View the procurement »
Mentioned suppliers: Thermit Welding GB Limited
2022-05-18   LONG TERM SUPPLY AND SUPPORT OF A COMPUTER BASED INTERLOCKING SYSTEM (Iarnrod Eireann-Irish Rail)
IÉ are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based on the dispatcher command, and the control of the trackside with the corresponding level of safety. Object Controllers (OC) that monitor and control trackside objects are also required. Lineside Electronic Units (LEU) may be required as a part of this tender. This contract will run for circa 25 years View the procurement »
2022-04-29   SIGNALLING & TELECOMMUNICATIONS UPGRADE (DESIGN & BUILD) FOR THE CORK AREA COMMUTER RAIL (CACR) PROJECT (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for suitably qualified companies to participate in the pre-qualification process for the proposed tender for the Signalling & Telecommunications Upgrade ( Design & Build) for the Cork Area Commuter Rail ( CACR) project. The overarching Cork Area Commuter Rail (CACR) programme comprises the heavy rail elements of CMATS. The programme objective is to deliver a transformative higher capacity, higher frequency unified through running suburban rail service for citizens … View the procurement »
Mentioned suppliers: Alstom Transport UK
2022-01-11   7908 - Design, Supply, Install, Maintain, and Monitor a Rail De-Magnetisation System (Iarnrod Eireann-Irish Rail)
Design, Supply, Install, Maintain, and Monitor a Rail De-Magnetisation System This is a call to competition by IE for the procurement of a Rail De-Magnetisation System in Portlaoise Rail and Sleeper Depot. (the “Contract”). View the procurement »
Mentioned suppliers: Compliance Engineering Ireland Ltd
2021-03-29   Supply of Modbus TCP remote I/O module (Lot 1) and Railway Computers (Lot 2) (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) are seeking expressions of interest from companies wishing to participate in a tender process for the supply of Modbus TCP remote I/O modules and Railway Computers. This is a single supplier contract with 2 lots: Lot 1: Supply of Modbus TCP remote I/O modules; Lot 2: Supply of railway computers. The requirement is for the supply and delivery of hardware components to the Telecoms workshop Inchicore Railway Works Dublin 8, Ireland. Design, installation or maintenance are not required … View the procurement »
Mentioned suppliers: SPINX COMPUTER VERTRIEBS-GMBH
2020-08-17   Manufacture, Supply Testing and Delivery of fully-fitted Signal Cases for the IE Train Protection System (TPS) (Iarnrod Eireann-Irish Rail)
Iarnrod Eireann (IE) is seeking to establish a single supplier framework agreement for the manufacture, supply, testing and delivery of fully fitted trackside location case equipment to sites throughout the IÉ rail network over the next 8 years.(5 + 1 + 1 + 1). This equipment will be used to support the roll out of any future signalling projects, which seek to extend, upgrade or enhance the existing network infrastructure, including but not limited to the Train Protection System (TPS) Project. View the procurement »
Mentioned suppliers: RIVVAL
2019-09-20   Independent Emergency Shut Down (Iarnrod Eireann-Irish Rail)
Iarnród Eireann -Irish Rail's ‘IE’ Dublin area Rapid transit ‘DART’ network is a 1,500Vdc overhead line catenary system with traction return path through the track (running rails). It comprises some 45 kms of double track, 10 kms of single track and necessary stabling sidings in the Dublin area. The total length of contact wire is approximately 130 kms. The power for the Dart is supplied via 13 substations and 7 switch houses (also known as track paralleling huts or TPHs). IE requires the services of a … View the procurement »
Mentioned suppliers: Sella Controls Ltd
2019-05-03   Maintenance of 38kV equipment in Traction Substations (Iarnrod Eireann-Irish Rail)
This is a call to competition by Iarnród Éireann-Irish Rail (“IE”), for the procurement of a suitably qualified Electrical Contractor to carry out maintenance of the 38kV equipment in Traction Substations located throughout the IE Rail Network. View the procurement »
Mentioned suppliers: O'Hara Engineering Services Ltd
2018-12-10   Supply of Rail Electrical Connection Components (Iarnrod Eireann — Irish Rail)
IE are seeking expressions of interest from companies experienced in providing rail electrical connection components, including drills and fastening systems, to mainline railway operators, ideally for UIC 54 kg rail. IE intend to enter into a 3-year fixed price agreement with the option extend for an additional 2 years. Delivery is to IE central stores, Inchicore, Dublin 8. A pre-qualification questionnaire is attached to this notice and must be completed and submitted in order to be considered for tender stage. View the procurement »
Mentioned suppliers: Cembre Ltd
2018-10-17   The Supply of a Photoresist Strip Tool — Plasma Asher (University College Cork (UCC))
The supply of a photoresist strip tool — Plasma Asher for Tyndall National Institute in University College Cork. View the procurement »
Mentioned suppliers: S3 Alliance Ltd
2018-08-20   The Supply of Photoresist Strip Tool — Plasma Asher (University College Cork (UCC))
The supply of Photoresist Strip Tool — Plasma Asher for Tyndall National Institute in University College Cork View the procurement »
2018-03-13   Design, Supply, Installation, Commissioning and Maintenance of Traffic Management System and Train Control Equipment... (Iarnrod Eireann-Irish Rail)
Iarnrod Eireann is seeking to procure a traffic management system and train control equipment for it’s proposed new National Train Control Centre (NTCC). The scope of this tender will include: 1— the design, supply, installation and commissioning of a fully integrated Traffic Management System and control equipment, (TMS supply contract) 2— a maintenance agreement for the technical support of the traffic management system (maintenance support services contract). The duration of this agreement will be for … View the procurement »
Mentioned suppliers: Indra Sistemas S.A
2018-02-13   The Supply of AIN Cluster Sputtering System (University College Cork (UCC))
The Supply of AIN Cluster Sputtering System for Tyndall National Institute, University College Cork. View the procurement »
Mentioned suppliers: Evatec Europe GmbH
2018-02-13   The supply of plasma etch systems — 2 Lots (University College Cork (UCC))
The supply of plasma etch systems — 2 Lots for Tyndall National Institute, University College Cork. View the procurement »
2018-02-13   The Supply of a HF Vapour Etch System (University College Cork (UCC))
The Supply of a HF Vapour Etch System for Tyndall National Institute, University College Cork. View the procurement »
Mentioned suppliers: Memsstar Ltd
2017-10-09   The Supply of Piezo MEMs and Materials Metrology Tooling — 2 Lots (University College Cork ( UCC ))
The Supply of Piezo MEMs and Materials Metrology Tooling — 2 Lots for Tyndall National Institute, University College Cork. View the procurement »
Mentioned suppliers: Bruker Uk Limited
2017-09-19   The Supply of Three Surface Profilers — Mechanical Step Height Measurement Systems (University College Cork ( UCC ))
The Supply of Three Surface Profilers — Mechanical Step Height Measurement Systems for Tyndall National Institute, University College Cork. View the procurement »
Mentioned suppliers: CN Technical Services Ltd
2017-09-15   Design, Supply and Safety Validation of Trackside Train Protection System (TPS) Equipment (Iarnrod Eireann-Irish Rail)
As part of the roll out of a new Train Protection System across the rail network, Iarnrod Eireann has a requirement for the design, supply, safety validation, programming, testing & commissioning of trackside Train Protection System (TPS) equipment. The on — board TPS equipment will be procured under a separate supply agreement. The supplier of the trackside TPS equipment will be responsible for the design and safety validation of the equipment including the interface with the on-board equipment. Further … View the procurement »
Mentioned suppliers: Alstom Ferroviaria S.p.A
2017-04-07   Electrical Systems Testing, Maintenance & Replacement Services Contract (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a competent contractor for the provision of electrical systems testing, maintenance and replacement services. The requirements under this contract will include; planned preventative maintenance and unplanned asset replacement. This proposed duration of the contract is 4 years. The current agreement for these services will expire in September 2017. Location Types: IE Stations, IE CCE Engineering compounds, IE Staff facilities, CIE property & retailers, CAN … View the procurement »
Mentioned suppliers: Global Rail Services Ltd
2017-02-13   Maintenance of 38kV Equipment in Traction Substations (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) requires the services of a suitably qualified Electrical Contractor to carry out maintenance on the 38kV equipment in Traction Substations located throughout the IÉ Rail Network. View the procurement »
Mentioned suppliers: O'Hara Engineering Electrical Maintenance
2015-02-16   Consultancy Services for new Centralised Traffic Control (CTC) Centre (Iarnrod Eireann-Irish Rail)
In 2013 a strategy study was carried out by Iarnród Éireann to evaluate the performance of the existing Centralised Traffic Control (CTC) centre (based at Connolly Station, Dublin) and to determine an effective Staging Proposal for the development of a new integrated Centralised Traffic Control centre. A number of limitations and deficiencies associated with the existing CTC control systems were identified. It is intended that an updated and integrated CTC will be constructed to allow Iarnród Éireann to … View the procurement »
2014-01-17   CCE/5152/GC - Enhancement of User Worked Level Crossings (Iarnrod Eireann-Irish Rail)
Iarnród Éireann is looking for suitable companies to assist in providing technological solutions to improve the operation of our User Worked Level Crossings. It is envisaged that this will be through the provision of technological solutions which will be developed and installed at level crossings to aid the level crossing user in his operation of the crossing in conjunction with current requirements. The project will consist of 2 phases: Phase 1: The design of solutions for the various types of … View the procurement »
Mentioned suppliers: Schweizer Electronic AG
2012-08-27   Enhancement of User Worked Level Crossings (Iarnrod Eireann-Irish Rail)
As part of Iarnród Éireann’s (IÉ) ongoing investment in safety at Level Crossings and their proactive approaches and commitments to risk reduction, IÉ is looking to develop upgrade solutions to its user operated level crossings. Initially, this will be with consideration for its Occupational Crossings on private roads (‘O’ type) and Occupational Crossings on public roads (‘OP’ type) but with possible further applications to Field level crossings (‘F’ type). It is envisaged that this will be through the … View the procurement »