Procurements: Environmental standards for construction
One active procurement
Environmental standards for construction have been procured by organizations such as National Transport Authority, Dublin City Council, and Clare County Council.
Historically, suppliers within this area have been Jacobs Engineering Ireland Ltd, Roughan & O'donovan, AECOM Ireland Ltd, Arup, Roughan and O'Donovan, ABK Architects (Awarded initial contract), Bulchoz McEvoy Architects, CAAS, CAAS Ltd., and Carr Cotter Naessens and co Ltd.
- Architectural, construction, engineering and inspection services (>20 new procurements)
- Engineering services (>20)
- Consultative engineering and construction services (>20)
- Environmental engineering consultancy services (5)
- Environmental impact assessment for construction (1)
- Risk or hazard assessment for construction
- Environmental standards for construction (1) ⬅️
- Environmental indicators analysis for construction (1)
- Environmental Impact Assessment (EIA) services for construction (1)
- Environmental monitoring for construction
Recent procurements of environmental standards for construction in Ireland
2026-04-29
Deadline 2026-06-03
Framework for Environmental Consultancy Services for Transport Projects funded by the NTA (National Transport Authority_1149)
Establishment of a framework of suitable qualified service providers who will be available, upon request, to tender for the provision of environmental consultancy services in relation to projects funded by the Authority. View the procurement »
Establishment of a framework of suitable qualified service providers who will be available, upon request, to tender for the provision of environmental consultancy services in relation to projects funded by the Authority. View the procurement »
2025-11-18
MetroLink Programme Delivery Partner Support Services (Transport Infrastructure Ireland (TII))
TII intends to award a MetroLink Programme Delivery Partner Support Services Contract, with specific services to be performed set out by task orders. The Programme Delivery Partner appointed to perform the Contract will provide capability and capacity to integrate with and support the MetroLink Directorate in the co-ordination and management of the pre- and post-contract stages of the MetroLink Project. The Programme Delivery Partner will manage various contracts procured by TII through providing … View the procurement »
TII intends to award a MetroLink Programme Delivery Partner Support Services Contract, with specific services to be performed set out by task orders. The Programme Delivery Partner appointed to perform the Contract will provide capability and capacity to integrate with and support the MetroLink Directorate in the co-ordination and management of the pre- and post-contract stages of the MetroLink Project. The Programme Delivery Partner will manage various contracts procured by TII through providing … View the procurement »
2025-08-11
The provision of consultancy services to support the development of an environmental “Mitigation Rulebook” for... (Department of Climate Energy and the Environment)
To assist in complying with the requirements of Article 15c of the revised Renewable Energy Directive (RED III), the Department of Climate, Energy and the Environment (DCEE) requires consultancy services to support the identification and collation of a suite of mitigation measures already deployed for renewable energy projects in Ireland. This will include reviewing existing renewable energy project permissions (from 2014 to present) and extracting, collating, and presenting common or “standard” … View the procurement »
To assist in complying with the requirements of Article 15c of the revised Renewable Energy Directive (RED III), the Department of Climate, Energy and the Environment (DCEE) requires consultancy services to support the identification and collation of a suite of mitigation measures already deployed for renewable energy projects in Ireland. This will include reviewing existing renewable energy project permissions (from 2014 to present) and extracting, collating, and presenting common or “standard” … View the procurement »
2025-07-24
Review of the Best Practice Guidelines for Resource and Waste Management Plans for Construction and Demolition Projects (Environmental Protection Agency)
The Best Practice Guidelines for Resource and Waste Management Plans for Construction and Demolition Projects were published by the EPA in 2021. Since 2021, there has been significant activity to drive circularity in the construction and demolition (C and D) sector, supporting waste prevention and effective resource management. The provision of services for this contract relate to a review of the guidelines, and to deliver updated guidelines which reflect current policy, legislation and other aspects as … View the procurement »
The Best Practice Guidelines for Resource and Waste Management Plans for Construction and Demolition Projects were published by the EPA in 2021. Since 2021, there has been significant activity to drive circularity in the construction and demolition (C and D) sector, supporting waste prevention and effective resource management. The provision of services for this contract relate to a review of the guidelines, and to deliver updated guidelines which reflect current policy, legislation and other aspects as … View the procurement »
2025-07-11
Call for Tenders Services to assist in the production of guidance relating to both mitigation and compensatory... (Department of the Environment Climate and Communications)
Consultancy Services are being sought by the Minister for Climate, Energy and the Environment to assist in the production of guidance relating to both mitigation and compensatory measures for renewable energy projects, and all associated electricity transmission connections and enabling infrastructure, in order to support the State’s compliance with the revised Renewable Energy Directive (RED III). Services must include, but are not limited to, the following: • To set out clearly the Article 6(3) … View the procurement »
Consultancy Services are being sought by the Minister for Climate, Energy and the Environment to assist in the production of guidance relating to both mitigation and compensatory measures for renewable energy projects, and all associated electricity transmission connections and enabling infrastructure, in order to support the State’s compliance with the revised Renewable Energy Directive (RED III). Services must include, but are not limited to, the following: • To set out clearly the Article 6(3) … View the procurement »
2025-06-18
CONSULTANCY SERVICES FOR MARINE ENGINEERING WORKS AT ROS AN MHÍL FISHERY HARBOUR CENTRE, CO. GALWAY, IRELAND (Department of Agriculture Food and the Marine)
The Department of Agriculture, Food and the Marine (DAFM) requires the services of a Marine Civil Engineering Consultancy. DAFM wish to appoint consultants with expertise in civil and marine engineering to prepare a preliminary report, detailed design and tender documentation for Marine Projects at Ros an Mhíl Fishery Harbour Centre (FHC), Co Galway, Ireland. View the procurement »
The Department of Agriculture, Food and the Marine (DAFM) requires the services of a Marine Civil Engineering Consultancy. DAFM wish to appoint consultants with expertise in civil and marine engineering to prepare a preliminary report, detailed design and tender documentation for Marine Projects at Ros an Mhíl Fishery Harbour Centre (FHC), Co Galway, Ireland. View the procurement »
2025-01-21
Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots (Lots 5 and 6) / Creatlacha... (Údarás Na Gaeltachta_289)
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally … View the procurement »
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally … View the procurement »
2024-09-13
Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots (Lots 3 and 4) / Creatlacha... (Údarás Na Gaeltachta_289)
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 3: Architect Led IDT for Counties Galway, Mayo and Meath - Lot 4: Engineer (Civil and Structural) Led IDT for Counties Galway, Mayo and Meath Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally … View the procurement »
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 3: Architect Led IDT for Counties Galway, Mayo and Meath - Lot 4: Engineer (Civil and Structural) Led IDT for Counties Galway, Mayo and Meath Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally … View the procurement »
2024-06-13
Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots (Údarás Na Gaeltachta_289)
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs … View the procurement »
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs … View the procurement »
2024-04-25
TII428_Standard Commission 2024 Lots 1, 3, 4 and 6 (Transport Infrastructure Ireland (TII))
TII has a requirement for engineering services in connection with updating and maintenance of TII Standards, Specifications and other technical documents contained in TII Publications relevant to the following, Road Design on TII networks (Lot 3 Road Design), design, maintenance and management of TII national roads and active travel network assets, including, but not limited to, pavements, drainage, structures and other ancillary infrastructure (Lot 4 Network Asset Management and Maintenance), and … View the procurement »
TII has a requirement for engineering services in connection with updating and maintenance of TII Standards, Specifications and other technical documents contained in TII Publications relevant to the following, Road Design on TII networks (Lot 3 Road Design), design, maintenance and management of TII national roads and active travel network assets, including, but not limited to, pavements, drainage, structures and other ancillary infrastructure (Lot 4 Network Asset Management and Maintenance), and … View the procurement »
2024-02-08
Dublin City Council Multi Party Framework Agreement for Multi-Disciplinary Design Team Services for Adaptive Reuse... (Dublin City Council)
Dublin City Council (“the Contracting Authority”) proposes to engage in a competitive process for the establishment of a Multi Party Framework Agreement for Multi-Disciplinary Design Team Services for Adaptive Reuse Projects Involving the Creation of Social and Affordable Residential Developments. The Adaptive Reuse Unit within Dublin City Council’s Housing and Community Services Department aims to deliver new social and affordable housing by adapting and refurbishing vacant office, commercial and … View the procurement »
Dublin City Council (“the Contracting Authority”) proposes to engage in a competitive process for the establishment of a Multi Party Framework Agreement for Multi-Disciplinary Design Team Services for Adaptive Reuse Projects Involving the Creation of Social and Affordable Residential Developments. The Adaptive Reuse Unit within Dublin City Council’s Housing and Community Services Department aims to deliver new social and affordable housing by adapting and refurbishing vacant office, commercial and … View the procurement »
2024-02-06
External Environmental Assessor Services (Inland Fisheries Ireland)
IFI require independent environmental expert advice to facilitate statutory fisheries environmental assessment procedures known as the Environmental Assessment Process (EAP). The EAP informs appropriate and transparent decision making regarding the potential implications of submitted proposals, directly or indirectly with respect of relevant European sites qualifying interests and conservation objectives, either alone and/or in combination with other plans or projects. View the procurement »
IFI require independent environmental expert advice to facilitate statutory fisheries environmental assessment procedures known as the Environmental Assessment Process (EAP). The EAP informs appropriate and transparent decision making regarding the potential implications of submitted proposals, directly or indirectly with respect of relevant European sites qualifying interests and conservation objectives, either alone and/or in combination with other plans or projects. View the procurement »
2024-01-01
Appropriate Assessment of New Pond (River Moy Search and Rescue Ballina CLG)
Performance of an appropriate assessment and related studies of a new pond View the procurement »
Performance of an appropriate assessment and related studies of a new pond View the procurement »
2023-12-08
Multi-Party Framework Agreement for Sustainability and Environmental Consultancy Services including projects with an... (Dublin City Council)
The Contracting Authority is seeking to establish a multiparty framework agreement for Sustainability and Environmental consultancy services for projects, located within the Council’s administrative area across multiple sites. Projects will be varied in size and nature, including new build and retrofit projects of housing, civic, community, commercial, libraries, sports and recreation, public realm. Framework members will be required to provide full Sustainability and Environmental Consultancy Services … View the procurement »
The Contracting Authority is seeking to establish a multiparty framework agreement for Sustainability and Environmental consultancy services for projects, located within the Council’s administrative area across multiple sites. Projects will be varied in size and nature, including new build and retrofit projects of housing, civic, community, commercial, libraries, sports and recreation, public realm. Framework members will be required to provide full Sustainability and Environmental Consultancy Services … View the procurement »
2023-11-28
OPW Arterial Drainage Maintenance Environmental Services Contract 2024: Corrib and other Schemes (Office of Public Works (OPW))
The Office of Public Works (OPW), Arterial Drainage Maintenance Service is commissioning an environmental consultant to assist with various environmental services, to support arterial drainage maintenance activities on thirteen arterial drainage schemes. Part 1 The principal study area for Part 1 of the Commission makes up nine schemes for arterial drainage schemes and flood relief schemes. The contract will require the completion of AA Screening for 9 Schemes and it is assumed that 6 of these schemes … View the procurement »
The Office of Public Works (OPW), Arterial Drainage Maintenance Service is commissioning an environmental consultant to assist with various environmental services, to support arterial drainage maintenance activities on thirteen arterial drainage schemes. Part 1 The principal study area for Part 1 of the Commission makes up nine schemes for arterial drainage schemes and flood relief schemes. The contract will require the completion of AA Screening for 9 Schemes and it is assumed that 6 of these schemes … View the procurement »
2023-10-05
Development of a Standard Document relating to the Biodiversity Impact Assessment of National Road, Greenway and... (Transport Infrastructure Ireland TII)
The services comprise of the Development of a Standard Document relating to the Biodiversity Impact Assessment of National Road, Greenway and Active Travel Projects. See Appendix 1 Requirements and Specifications for more details View the procurement »
The services comprise of the Development of a Standard Document relating to the Biodiversity Impact Assessment of National Road, Greenway and Active Travel Projects. See Appendix 1 Requirements and Specifications for more details View the procurement »
2023-10-05
Ecological Study of Two Ponds and a Wetland Area (River Moy Search and Rescue Ballina CLG)
Ecological Study of Two Ponds and a Wetland Areas View the procurement »
Ecological Study of Two Ponds and a Wetland Areas View the procurement »
2023-07-17
FCC/051/22 - Architect Led Integrated Design Team for the construction of a Residential/Mixed use development... (Fingal County Council_371)
Fingal County Council is seeking to commission an Architect Led Integrated Design Team for the construction of a residential/mixed use site located at 6-14 Bridge Street, Balbriggan, Co Dublin through stages 1-5 where the Employers Representative is a dedicated resource at stages 4 and 5 and a project manager trough stages 1-3. The Integrated Design will comprise of the following principal disciplines: (a) Architectural Services (Design Team Lead incl. fire safety design services, disability access … View the procurement »
Fingal County Council is seeking to commission an Architect Led Integrated Design Team for the construction of a residential/mixed use site located at 6-14 Bridge Street, Balbriggan, Co Dublin through stages 1-5 where the Employers Representative is a dedicated resource at stages 4 and 5 and a project manager trough stages 1-3. The Integrated Design will comprise of the following principal disciplines: (a) Architectural Services (Design Team Lead incl. fire safety design services, disability access … View the procurement »
2023-07-10
NSAI - CONCRETE BLOCK STEERING GROUP CONSULTANTS PANEL - 2023 (National Standards Authority of Ireland NSAI)
NSAI invites tenders from suppliers to provide consultancy services to support NSAI’s review of the I.S. 465 Standard and its application. A review by NSAI Masonry Committee of the Irish Standard for Concrete Blocks (including aggregates). A review of the impact of pumped cavity wall insulation on cavity wall construction and within homes susceptible to or impacted by defective concrete blocks. Successful suppliers in this process will be placed on a panel for 3 years with possibility of extension for … View the procurement »
NSAI invites tenders from suppliers to provide consultancy services to support NSAI’s review of the I.S. 465 Standard and its application. A review by NSAI Masonry Committee of the Irish Standard for Concrete Blocks (including aggregates). A review of the impact of pumped cavity wall insulation on cavity wall construction and within homes susceptible to or impacted by defective concrete blocks. Successful suppliers in this process will be placed on a panel for 3 years with possibility of extension for … View the procurement »
2023-03-03
Carlow Town URDF Town Centre Public Realm Enhancement (Carlow County Council)
Procurement of Design Team for Carlow Town URDF Town Centre Public Realm Enhancement as part of the Urban Regeneration and Development Fund Project. View the procurement »
Procurement of Design Team for Carlow Town URDF Town Centre Public Realm Enhancement as part of the Urban Regeneration and Development Fund Project. View the procurement »
2023-02-14
Environmental, Statutory Planning and Transport Assessment Consultancy Services for BusConnects Infrastructure Cork Programme (National Transport Authority)
EIA and AA, including preparation of Environmental Impact Assessment Reports (EIARs) and Natura Impact Statements (NISs); Provision of Statutory Planning Advice; transport modelling and assessment to support Preliminary Business Case preparation, Sustainable Transport Corridors (STCs) design development and Transport Impact Assessments (TIAs) for EIARs for the Statutory Consent Application (SCA) submission to ABP through to the end of the Statutory Consent Process of the BusConnects Infrastructure Cork … View the procurement »
EIA and AA, including preparation of Environmental Impact Assessment Reports (EIARs) and Natura Impact Statements (NISs); Provision of Statutory Planning Advice; transport modelling and assessment to support Preliminary Business Case preparation, Sustainable Transport Corridors (STCs) design development and Transport Impact Assessments (TIAs) for EIARs for the Statutory Consent Application (SCA) submission to ABP through to the end of the Statutory Consent Process of the BusConnects Infrastructure Cork … View the procurement »
2023-01-23
Invitation to Tender for the Provision of Ecological Services for South Kerry Greenway for Kerry County Council (Kerry County Council)
Provision of Ecological Services for South Kerry Greenway Ecological Services. View the procurement »
Provision of Ecological Services for South Kerry Greenway Ecological Services. View the procurement »
2022-12-21
Engineering Design Services for BusConnects Cork (National Transport Authority)
The NTA seek to appoint Engineering Designers to progress, as part of the BusConnects Cork project. The Tender & Schedule sets out the scope for the Provision of Engineering Design Services for the Planning Stage through to the end of the Statutory Process of Project A of the BusConnects Cork Sustainable Transport Corridors Infrastructure Upgrade Programme (the Programme). For purposes of the tender the Programme has been subdivided into three (3) Engineering Design Projects. Each Project is made up of … View the procurement »
The NTA seek to appoint Engineering Designers to progress, as part of the BusConnects Cork project. The Tender & Schedule sets out the scope for the Provision of Engineering Design Services for the Planning Stage through to the end of the Statutory Process of Project A of the BusConnects Cork Sustainable Transport Corridors Infrastructure Upgrade Programme (the Programme). For purposes of the tender the Programme has been subdivided into three (3) Engineering Design Projects. Each Project is made up of … View the procurement »
2022-12-13
Engineer Led Technical Advisor Team Consultancy Services (Clare County Council)
Engineer Led Technical Advisor Team Consultancy Services for Phase 2 Option Selection, Phase 3 Design and Environmental Evaluation, and Phase 4 Statutory Processes with Option for Phase 5 Enabling and Procurement for West Clare Railway Greenway - Sections 3 & 4 - Ennistymon to Miltown Malbay and Miltown Malbay to Moyasta. View the procurement »
Engineer Led Technical Advisor Team Consultancy Services for Phase 2 Option Selection, Phase 3 Design and Environmental Evaluation, and Phase 4 Statutory Processes with Option for Phase 5 Enabling and Procurement for West Clare Railway Greenway - Sections 3 & 4 - Ennistymon to Miltown Malbay and Miltown Malbay to Moyasta. View the procurement »
2022-11-29
Single Party Framework Agreement for an Architect Led Multi-disciplinary Design Team for the College Green Dame... (Dublin City Council)
Dublin City Council (DCC) & the National Transport Authority (NTA) intend to construct a landmark public space at College Green & Dame Street (CGDS), Dublin 2. The Contracting Authority, DCC, is seeking to establish a Single Party Framework Agreement for an Architect Led Multi-disciplinary Design Team for the CGDS Public Realm Project & associated ancillary projects relating to the CGDS Public Realm Project. The establishment of the framework agreement is subject to the provisions of Directive 2014/24/EU … View the procurement »
Dublin City Council (DCC) & the National Transport Authority (NTA) intend to construct a landmark public space at College Green & Dame Street (CGDS), Dublin 2. The Contracting Authority, DCC, is seeking to establish a Single Party Framework Agreement for an Architect Led Multi-disciplinary Design Team for the CGDS Public Realm Project & associated ancillary projects relating to the CGDS Public Realm Project. The establishment of the framework agreement is subject to the provisions of Directive 2014/24/EU … View the procurement »
2022-04-19
Single-party framework for Project Management Led Integrated Multi-Disciplinary Consultancy Services in relation to... (Galway City Council)
Galway City Council is engaging in a competitive tendering process for the establishment of a single-party framework agreement for Project Management Led Integrated Multi-Disciplinary Consultancy Services in relation to Extension and Enhancement of Galway City Museum and Spanish Arch Site. Project Management services will include for the design, supervision and construction management for the proposed extension and enhancement of the Galway City Museum site at the Spanish Arch, Galway City. The framework … View the procurement »
Galway City Council is engaging in a competitive tendering process for the establishment of a single-party framework agreement for Project Management Led Integrated Multi-Disciplinary Consultancy Services in relation to Extension and Enhancement of Galway City Museum and Spanish Arch Site. Project Management services will include for the design, supervision and construction management for the proposed extension and enhancement of the Galway City Museum site at the Spanish Arch, Galway City. The framework … View the procurement »
2022-02-07
Provision of Strategic Capital Development Advisory Services (Technological University of the Shannon: Midlands Midwest (TUSMM))
The recent achievement of Technological University status and the amalgamation of Limerick Institute of Technology and Athlone Institute of Technology will have a significant impact on the capital development priorities of TUS. In order to support the process of developing and availing of funding and other opportunities to support and maintain progress in campus development, TUS wishes to engage providers of Strategic Capital Development Advisory Services. View the procurement »
The recent achievement of Technological University status and the amalgamation of Limerick Institute of Technology and Athlone Institute of Technology will have a significant impact on the capital development priorities of TUS. In order to support the process of developing and availing of funding and other opportunities to support and maintain progress in campus development, TUS wishes to engage providers of Strategic Capital Development Advisory Services. View the procurement »
2022-01-27
Framework for Environmental Consultancy Services (National Transport Authority)
The services to be performed may include: 1. Screening of plans, programmes and projects in order to assess their requirements under the relevant directives and applicable legislation; 2. Carrying out of all required stages of the following environmental assessment processes:a. Strategic Environmental Assessment; b. Environmental Impact Assessment; c. Appropriate Assessment; and d. Flood Risk Assessment. In the case of plans and programmes, a to d may apply, in the case of projects, b and c may apply; 3. … View the procurement »
The services to be performed may include: 1. Screening of plans, programmes and projects in order to assess their requirements under the relevant directives and applicable legislation; 2. Carrying out of all required stages of the following environmental assessment processes:a. Strategic Environmental Assessment; b. Environmental Impact Assessment; c. Appropriate Assessment; and d. Flood Risk Assessment. In the case of plans and programmes, a to d may apply, in the case of projects, b and c may apply; 3. … View the procurement »
2021-09-22
West Clare Railway Greenway Section 2 (Clare County Council)
Tender for Multi-Disciplinary Services for West Clare Railway Greenway - Section 2 Ennis to Ennistymon (circa 30km) View the procurement »
Tender for Multi-Disciplinary Services for West Clare Railway Greenway - Section 2 Ennis to Ennistymon (circa 30km) View the procurement »
2021-09-20
Architect Led Integrated Design Team Services for the development of a new visitor hub facility at Dublin Castle (Office of Public Works (OPW))
The OPW is seeking to enter into a contract for Architect Led Integrated Design Team Services for the development of a new visitor hub at Dublin Castle. The project will be guided by the objectives set out in the Dublin Castle Conservation Management Statement. The design team will comprise the following principle disciplines: - Architectural Design including design team lead - Civil & Structural Engineering - Mechanical & Electrical Engineering - Conservation Architect - Quantity Surveyor - Project … View the procurement »
The OPW is seeking to enter into a contract for Architect Led Integrated Design Team Services for the development of a new visitor hub at Dublin Castle. The project will be guided by the objectives set out in the Dublin Castle Conservation Management Statement. The design team will comprise the following principle disciplines: - Architectural Design including design team lead - Civil & Structural Engineering - Mechanical & Electrical Engineering - Conservation Architect - Quantity Surveyor - Project … View the procurement »
2021-06-30
Carrigans to Castlefin Greenway (Donegal County Council)
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the Consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII project management guidelines for a Greenway linking Carrigans and Castlefin villages. View the procurement »
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the Consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII project management guidelines for a Greenway linking Carrigans and Castlefin villages. View the procurement »
2021-06-30
Muff to Quigleys Point Greenway (Donegal County Council)
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII Project management guidelines for a Greenway linking Muff and Quigleys Point in Inishowen, Co. Donegal. View the procurement »
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII Project management guidelines for a Greenway linking Muff and Quigleys Point in Inishowen, Co. Donegal. View the procurement »
2021-06-10
Buncrana to Carndonagh Greenway (Donegal County Council)
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the Consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII project management guidelines for a Greenway linking Buncrana and Carndonagh in Inishowen, Co. Donegal. View the procurement »
Donegal County Council seeks to appoint a multi-disciplinary engineering and consultancy services team, with external specialists as required (the Consultant) to undertake the services required under Phases 0 – 4 (up to and including completion of statutory processes) of the TII project management guidelines for a Greenway linking Buncrana and Carndonagh in Inishowen, Co. Donegal. View the procurement »
2021-03-09
Integrated Design Team for the Ulster Canal Restoration – Phase 2 (Clones to Clonfad) (Waterways Ireland)
This tender exercise aims to establish a single-party agreement for the provision of a civil/structural engineer led integrated design team services to support the delivery of the design and development of the restoration of an approximately 1 km stretch of the Ulster Canal between Clones town and the Clonfad aqueduct just under 1 km south west of Clones. View the procurement »
This tender exercise aims to establish a single-party agreement for the provision of a civil/structural engineer led integrated design team services to support the delivery of the design and development of the restoration of an approximately 1 km stretch of the Ulster Canal between Clones town and the Clonfad aqueduct just under 1 km south west of Clones. View the procurement »
2021-02-03
Independent Environmental, Health, Safety, Training and Security (EHST&S) Auditor Services (National Paediatric Hospital Development Board)
Independent health and safety auditor services for the nch. View the procurement »
Independent health and safety auditor services for the nch. View the procurement »
2020-12-11
Single-Party Framework Agreement for Architect Led Integrated Design Team Services (Crawford Art Gallery)
The Crawford Art Gallery is seeking to establish a single-party framework agreement for architect led integrated design team services for the redevelopment of the Gallery and surrounding areas. The design team will comprise the following principle disciplines: — architectural design including design team lead; — civil AND structural engineering; — mechanical AND electrical engineering; — landscape architect; — conservation architect; — project management; — planning consultant; — archaeological … View the procurement »
The Crawford Art Gallery is seeking to establish a single-party framework agreement for architect led integrated design team services for the redevelopment of the Gallery and surrounding areas. The design team will comprise the following principle disciplines: — architectural design including design team lead; — civil AND structural engineering; — mechanical AND electrical engineering; — landscape architect; — conservation architect; — project management; — planning consultant; — archaeological … View the procurement »
2020-12-04
West Clare Railway Greenway Section 1 (Clare County Council)
Tender for Multi-Disciplinary Services for West Clare Railway Greenway - Section 1 Kilrush to Kilkee (circa 25km). View the procurement »
Tender for Multi-Disciplinary Services for West Clare Railway Greenway - Section 1 Kilrush to Kilkee (circa 25km). View the procurement »
2020-11-06
Multi-Party Framework Agreement for Architect Led Integrated Design Team Services (Irish Prison Service)
The Irish Prison Services is now seeking to establish a multi-party framework agreement for architect led integrated design team services. View the procurement »
The Irish Prison Services is now seeking to establish a multi-party framework agreement for architect led integrated design team services. View the procurement »
2020-10-07
Engineering Consultancy Services for Tivoli Access Infrastructure for Stages 1-2 (Port of Cork Company)
Port of Cork Company (POCC) is seeking to establish a single party framework agreement for an engineering led multi-disciplinary design team to facilitate the redevelopment of their lands at Tivoli, Cork. The framework will be established on foot of an initial contract for the preliminary design and planning stages for the required access, public transport and Cycleway Infrastructure at Tivoli Docks. View the procurement »
Port of Cork Company (POCC) is seeking to establish a single party framework agreement for an engineering led multi-disciplinary design team to facilitate the redevelopment of their lands at Tivoli, Cork. The framework will be established on foot of an initial contract for the preliminary design and planning stages for the required access, public transport and Cycleway Infrastructure at Tivoli Docks. View the procurement »
2020-06-26
Cork Northern Distributor Road Route Selection (Cork City Council)
Cork City Council (the ‘Client’) wish to engage the services of a suitably qualified and experienced consultant engineer led multi-disciplinary design team for the route selection process for the Cork Northern Distributor Road. The services sought require multi-disciplinary engineering and other specialist consultancy services, consisting of all services necessary or desirable for the purposeful delivery of phases 1-2 as per the National Transport Authority's guidelines for the management of public … View the procurement »
Cork City Council (the ‘Client’) wish to engage the services of a suitably qualified and experienced consultant engineer led multi-disciplinary design team for the route selection process for the Cork Northern Distributor Road. The services sought require multi-disciplinary engineering and other specialist consultancy services, consisting of all services necessary or desirable for the purposeful delivery of phases 1-2 as per the National Transport Authority's guidelines for the management of public … View the procurement »
2020-06-22
Landscape Architect Led Integrated Design Team Services Single Party Framework Agreement for Fingal County Council (Fingal County Council)
Fingal County Council is seeking to establish a single-party framework agreement for a landscape architect led integrated design team. The proposed framework will be established on foot of an initial contract for the completion of a design for the development of Church Field Linear Park Development which is made up of 3 No separate but integrated parks. These include Wellview Park (existing), Church Fields Linear Park and Pinkeen River Wetlands Park. The integrated design team will be responsible for … View the procurement »
Fingal County Council is seeking to establish a single-party framework agreement for a landscape architect led integrated design team. The proposed framework will be established on foot of an initial contract for the completion of a design for the development of Church Field Linear Park Development which is made up of 3 No separate but integrated parks. These include Wellview Park (existing), Church Fields Linear Park and Pinkeen River Wetlands Park. The integrated design team will be responsible for … View the procurement »
2019-09-12
ER Led Design Team Framework Tender (Fingal County Council)
Fingal County Council is seeking to establish a multi-party framework agreement for employers representative led integrated design team services for construction and refurbishment/upgrading/repair type projects including but not limited to residential use, estate/public space areas, public buildings and facilities, public realm type works, etc. The construction projects envisaged will range in value from 1 000 000 EUR – circa 20 000 000 EUR and may be a combination of a number of sub-projects for … View the procurement »
Fingal County Council is seeking to establish a multi-party framework agreement for employers representative led integrated design team services for construction and refurbishment/upgrading/repair type projects including but not limited to residential use, estate/public space areas, public buildings and facilities, public realm type works, etc. The construction projects envisaged will range in value from 1 000 000 EUR – circa 20 000 000 EUR and may be a combination of a number of sub-projects for … View the procurement »
2019-08-06
Additional Accommodation at Glencastle National School, Ballina, Co. Mayo (Mayo, Sligo and Leitrim ETB)
Glencastle National School, Roll No 13222P requires additional accommodation comprising 2x Classroom SEN base (total area incl. walls and circulation 267 m) and 1 x staff room 35 m, 1 x multi purpose/games room 801 m, 1 x nurses office 15 m, toilets boys and girls 15 m and ancillary as per attached schedule at Glencastle NS. View the procurement »
Glencastle National School, Roll No 13222P requires additional accommodation comprising 2x Classroom SEN base (total area incl. walls and circulation 267 m) and 1 x staff room 35 m, 1 x multi purpose/games room 801 m, 1 x nurses office 15 m, toilets boys and girls 15 m and ancillary as per attached schedule at Glencastle NS. View the procurement »
2019-07-31
Planning and Environmental Services for Coillte’s Bio Energy Project Shine (Coillte CGA)
Coillte CGA (Coillte, or the Company) has taken the decision to engage a suitably qualified service provider for the provision of planning and environmental services in relation to the company’s opportunity for the development and delivery of a bio-energy infrastructure project at 1 of its manufacturing sites. The opportunity under development by Coillte comprises the potential development and installation of a bio-energy plant to produce thermal and electrical energy to meet the full operational needs … View the procurement »
Coillte CGA (Coillte, or the Company) has taken the decision to engage a suitably qualified service provider for the provision of planning and environmental services in relation to the company’s opportunity for the development and delivery of a bio-energy infrastructure project at 1 of its manufacturing sites. The opportunity under development by Coillte comprises the potential development and installation of a bio-energy plant to produce thermal and electrical energy to meet the full operational needs … View the procurement »
2019-06-12
Provision of Environmental and Planning Services for Ballynagree Wind Farm (Coillte CGA)
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached. Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition. View the procurement »
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached. Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition. View the procurement »
2019-05-13
Provision of Consultancy Services for the Preparation of Environmental Impact Assessments and Transport Impact... (National Transport Authority)
The national transport authority requires the services of a Service Provider to undertake services relating to the identification and mitigation of environmental impacts imposed by the BusConnects Programme. Please refer to the tender documents for further information. View the procurement »
The national transport authority requires the services of a Service Provider to undertake services relating to the identification and mitigation of environmental impacts imposed by the BusConnects Programme. Please refer to the tender documents for further information. View the procurement »
2019-03-29
Environmmental Engineering Consultancy Services (Fingal County Council)
Single party framework for environmental engineering consultancy services to support the specified engineering works programme at Balleally former Landfill (Rogerstown Park). View the procurement »
Single party framework for environmental engineering consultancy services to support the specified engineering works programme at Balleally former Landfill (Rogerstown Park). View the procurement »
2019-03-08
Single Party Framework Agreement for Landscape Architect Led Integrated Design Team Services (Dun Laoghaire Rathdown County Council)
The Cherrywood Development Agency Project Team (DAPT)/Dùn Laoghaire-Rathdown County Council (DLR) is seeking to establish a single party Framework Agreement for landscape architect led integrated design team services. The single party Framework Agreement will be established on foot of an initial contract for the completion of a design for the development of Tully Park Phase 2 within Cherrywood Strategic Development Zone. View the procurement »
The Cherrywood Development Agency Project Team (DAPT)/Dùn Laoghaire-Rathdown County Council (DLR) is seeking to establish a single party Framework Agreement for landscape architect led integrated design team services. The single party Framework Agreement will be established on foot of an initial contract for the completion of a design for the development of Tully Park Phase 2 within Cherrywood Strategic Development Zone. View the procurement »
2018-11-14
Multi-Party Framework Agreement for Architect Led Integrated Design Team Services for projects within Dublin City... (Dublin City Council)
The Contracting Authority (Dublin City Council) is seeking to establish a multi-party Framework Agreement in 2 lots for integrated design team services. The lots will comprise the following: — Lot 1: for projects with an estimated construction value up to 15 000 000 EUR. The maximum estimated value of the services over the lifetime of the framework is anticipated to be in the region 7 800 000 EUR. The estimated construction value over the lifetime of the framework is in the region of 60 000 000 EUR to 65 … View the procurement »
The Contracting Authority (Dublin City Council) is seeking to establish a multi-party Framework Agreement in 2 lots for integrated design team services. The lots will comprise the following: — Lot 1: for projects with an estimated construction value up to 15 000 000 EUR. The maximum estimated value of the services over the lifetime of the framework is anticipated to be in the region 7 800 000 EUR. The estimated construction value over the lifetime of the framework is in the region of 60 000 000 EUR to 65 … View the procurement »
2018-09-25
Provision of Master Planning and Environmental Impact Statement Services (Sport Ireland)
Services required for NSC Master Plan and EIS Review. The following sets out the broad requirements of the services to be provided under the proposed contract: 1) Review of existing planning permission and attached conditions; 2) Review and update of existing master plan; 3) Review and Update of Environmental Impact Statement (EIS). View the procurement »
Services required for NSC Master Plan and EIS Review. The following sets out the broad requirements of the services to be provided under the proposed contract: 1) Review of existing planning permission and attached conditions; 2) Review and update of existing master plan; 3) Review and Update of Environmental Impact Statement (EIS). View the procurement »