2020-09-11Offshore Geotechnical Survey across the Main Site and Along the Export Cable Routes (Codling Wind Park Ltd)
The Codling Wind Park (CWP) is located off Codling Bank, 13 km from the east coast of Ireland between Greystones and Wicklow, in water depths between 7 and 30 meters LAT. The development is planned to incorporate an offshore substation(s), transmission infrastructure and individual wind turbine foundations and structures, and enables grid connection cables to the Irish coastline.
The purpose of the scope is to perform an offshore.
Geotechnical survey across the main site and along the export cable routes …
View the procurement »
2020-09-04Next Generation Ticketing (National Transport Authority)
The authority intends to procure a nationwide multi-modal Account Based Ticketing (ABT) system supporting both public and private operated transport services, with the eventual aim of enabling the provision of Mobility as a Service 'MaaS' type offerings. The solution is expected to include the delivery of a fully functioning and fit for purpose ABT back office system including all necessary equipment, hosting, software, services and supporting systems. The solution is also expected to include the supply, …
View the procurement »
2020-09-04Building Services (M&E) Engineering Services for Additional Accommodation at Ballygarvan N.S. Co. Cork (Ballygarvan National School)
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 5 SET rooms: 15 m each.
Giving a floor area including circulation and internal walls of: 96 m.
Section B
• 2 classroom SEN Base 343.2 m;
• giving a floor area (incl circulation and internal walls) of 439 m.
Giving a Gross Floor Area for Section A and B (including circulation, internal walls) of 535 m.
Also:
• secure hard and soft play area 200 m;
• sensory garden 100 m;
• 6 …
View the procurement » Mentioned suppliers:Matt O'Mahony and Associates
2020-09-04Landscape Architect and Fire/Disability Access Consultant (Limerick 2030 Strategic Development DAC)
The contracting authority, require a landscape architect and fire safety and disability access consultant for the design, procurement, construction and delivery of the project opera works, which includes the following:
Parcel 1: new build — modern offices at One Opera Square;
Parcel 2A: refurbishment and new build — residential units above retail at Patrick Street and Ellen Street Corner;
Parcel 2B: refurbishment — bar/restaurant at No 9 Ellen Street;
Parcel 3a4: refurbishment and new build — New City …
View the procurement » Mentioned suppliers:Maurice Johnston & Partners
2020-09-04Civil Structural Engineering Services for Additional Accommodation at Ballygarvan N.S. Co. Cork (Ballygarvan National School)
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 5 SET rooms: 15 m each
Giving a floor area including circulation and internal walls of: 96 m.
Section B
• 2 classroom SEN Base 343.2 m.
• Giving a floor area (incl circulation and internal walls) of 439 m.
Giving a gross floor area for Section A and B (including circulation, internal walls) of 535 m.
Also:
• secure hard and soft play area 200 m,
• sensory garden 100 m,
• 6 …
View the procurement » Mentioned suppliers:Collins Boyd Engineering
2020-09-03Architectural Services for Additional Accommodation at Ballygarvan N.S. Co Cork (Ballygarvan National School)
Please see attached project brief and schedule of additional accommodation.
In summary, the project will comprise:
Section A:
• 5 SET rooms: 15 m each.
Giving a floor area including circulation and internal walls of: 96 m.
Section B
• 2 classroom SEN Base 343.2 m;
• giving a floor area (incl circulation and internal walls) of 439 m.
Giving a Gross Floor Area for Section A and B (including circulation, internal walls) of 535 m.
Also:
• secure hard and soft play area 200 m;
• sensory garden 100 m;
• 6 …
View the procurement » Mentioned suppliers:Gildea Chartered Surveyors
2020-09-03Quatity Survey Services for Additional Accommodation at Corpus Christi NS, Moyross, Limerick (Corpus Christi Primary School (Limerick))
Corpus Christi N.S. is a primary school under the trusteeship of the Catholic Diocese of Limerick.
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 4 SET rooms: 15 m each.
Giving a floor area including circulation and internal walls of: 76.8 m.
Section B
• 2 classroom SEN Base 343.2 m;
• giving a floor area (incl circulation and internal walls) of 439.3 m.
Giving a Gross Floor Area for Section A and B (including circulation, …
View the procurement » Mentioned suppliers:Molloyqs
2020-09-02Derryadd Client Engineer (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme …
View the procurement »
2020-09-02Consultancy Services for Galway Technology Centre ‘AcademyWest’ Extension (Galway Technology Centre, DAC)
Design and project management services for the construction of an extension to the Galway Technology Centre.
Galway Technology Centre DAC proposes to build a four storey extension to the existing Galway Technology Centre, at the Mervue Business Park, Wellpark Road, Galway.
Planning permission has being obtained from Galway City Council for the construction of a four storey extension at the rear of the existing building to provide new office accommodation, meeting rooms, canteen and toilet facilities.
The …
View the procurement » Mentioned suppliers:MKO Estates Project Management Ltd
2020-08-19Contract C and D — Design Team Procurement (Limerick 2030 Strategic Development DAC)
The contracting authority, require a design team for the design, procurement, construction and delivery of the project opera contract C and D works, which includes the following:
• Parcel 3a refurbishment and new build — New City Library (Town Hall) on all floors including a Café/Restaurant at basement level;
• Parcel 3b refurbishment — retail at basement and ground floor with Residential over;
• Parcel 4 new build — Commercial Office use;
• Parcel 5 new build — Landmark Office building; and
• Parcel 6 …
View the procurement » Mentioned suppliers:ArupHenry J LyonsPunch Consulting Engineers
2020-08-18Statutory Inspection of Lifting Equipment (Irish Water)
The purpose of this contract is to enable Irish Water to comply with current legislative requirements relating to the inspection and certification of lifting equipment to ensure that Irish Water meets its statutory duties in the areas listed above.
The contract shall include the independent and competent examination of lifting equipment, production of records of inspection, management information reports and access to a web based portal.
Inspection of equipment at all Irish Water sites based in 31 local …
View the procurement »
2020-08-18Multi-party Frameworks for Architect OR Engineer Led Integrated Design Teams in Four Lots (Udaras Na Gaeltachta)
Establishment of multiparty framework for integrated design team services for Údarás na Gaeltachta:
Lot 1: Architect Led IDT for Counties Galway, Mayo and Meath,
Lot 2: Engineer Led IDT for Counties Galway, Mayo and Meath,
Lot 3: Architect Led IDT for County Donegal,
Lot 4: Engineer Led IDT for County Donegal.
Each framework agreement will be established with five economic operators comprising the following disciplines:
(a) architectural services and associated specialist skills;
(b) civil and structural …
View the procurement »
2020-08-14Building Services (M&E) Engineering Services for Additional Accommodation at Scoil Eoin Naofa, Roscrea (Scoil Eoin Naofa (Roscrea))
Building Services (M&E) engineering services for additional accommodation at Scoil Eoin Naofa, Roscrea. Scoil Eoin Naofa is a primary school under the trusteeship of the Diocese of Killaloe.
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 2 classrooms: 80 m each;
• 1 SET Room: 15 m.
Giving a floor area including circulation and internal walls of: 224 m.
Section B
• 1 Classroom SEN Base 167 m;
• Giving a floor area (incl …
View the procurement »
2020-08-14Civil Structural Engineering Services for Additional Accommodation at Scoil Eoin Naofa, Roscrea (Scoil Eoin Naofa (Roscrea))
Civil structural engineering services for additional accommodation at Scoil Eoin Naofa, Roscrea. Scoil Eoin Naofa is a primary school under the trusteeship of the Catholic Diocese of Killaloe.
Please see attached project brief and schedule of additional accommodation.
In summary, the project will comprise:
Section A:
• 2 classrooms: 80 m each;
• 1 SET Room: 15 m.
Giving a floor area including circulation and internal walls of: 224 m.
Section B
• 1 classroom SEN Base 167 m;
• giving a floor area (incl …
View the procurement »
2020-08-13Quantity Surveying Services for Additional Accommodation at Scoil Eoin Naofa, Roscrea (Scoil Eoin Naofa (Roscrea))
Quantity surveying services for additional accommodation at Scoil Eoin Naofa, Roscrea.Scoil Eoin Naofa is a primary school under the trusteeship of the Diocese of Killaloe.
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 2 classrooms: 80 m each,
• 1 SET room: 15 m.
Giving a floor area including circulation and internal walls of: 224 m.
Section B
• 1 classroom SEN base 167 m,
• giving a floor area (incl circulation and internal …
View the procurement »
2020-08-1020/010 — A Multi Supplier Framework for the Provision of Technical Specialists Services (Ervia)
A multi supplier framework for the provision of technical specialists services
Scope includes but not limited to:
Material testing and investigation.
Integrity, risk management and audits
Surveying services.
Network analysis support distribution and transmission specialist.
Third party inspection services.
(PSDP) support services
Cathodic protection and high voltage interference specialist.
Noise testing and analysis/assessment.
Building Information Modelling (BIM) and Information management support …
View the procurement »
2020-08-09Building Services (M&E) Engineering Services for Additional Accommodation at Ballyhooly N.S (Scoil Mhuire National School (Ballyhooly))
Architectural services for additional accommodation at Ballyhooly N.S.
Please see attached project brief and schedule of additional accommodation
In summary, the project will comprise:
Section A:
• 2 classrooms: 80 m each
Giving a floor area including circulation and internal walls of: 204.8 m
Section B
• 2 classroom SEN Base 343.2 m
• giving a floor area (incl circulation and internal walls) of 439.3 m
Giving a gross floor area for section A and B (including circulation, internal walls, stairs and lift) …
View the procurement »
2020-08-08Civil Structural Engineering Services for Additional Accommodation at Ballyhooly N.S (Scoil Mhuire National School (Ballyhooly))
Architectural services for additional accommodation at Ballyhooly N.S. Please see attached project brief and schedule of additional accommodation.
In summary, the project will comprise:
Section A
• 2 classrooms: 80 m each.
Giving a floor area including circulation and internal walls of: 204.8 m.
Section B
• 2 classroom SEN base 343.2 m.
• Giving a floor area (incl circulation and internal walls) of 439.3 m.
Giving a gross floor area for section A and B (including circulation, internal walls, stairs and …
View the procurement »
2020-08-08Quantity Surveying Services for Additional Accommodation at Ballyhooly N.S (Scoil Mhuire National School (Ballyhooly))
Architectural services for additional accommodation at Ballyhooly N.S. Please see attached project brief and schedule of additional accommodation.
In summary, the project will comprise:
Section A:
• 2 Classrooms: 80 m each.
Giving a floor area including circulation and internal walls of: 204.8 m.
Section B
• 2 classroom SEN Base 343.2 m.
• Giving a floor area (incl circulation and internal walls) of 439.3 m.
Giving a gross floor area for section A and B (including circulation, internal walls, stairs and …
View the procurement »
2020-08-08Minor Works/Services Framework Competition (St Vincent's University Hospital)
The competition consists of six (6) lots for works/services under EUR 1 million:
1) Lot 1: Contractor's work
2) Lot 2: Architectural Consultancy Services
3) Lot 3: Mechanical and Electrical (M&E) Engineer Consultancy Services
4) Lot 4: Quantity Surveying Consultancy Services
5) Lot 5: Fire Safety Consultancy Services
6) Lot 6: Assigned Certifier Services.
Candidates should note that only Lot 1 is a multi operator framework agreement with maximum five economic operators; the other Lots are single operator …
View the procurement »
2020-08-07Development of an Integrated Constructed Wetland for Ballynacarrick Landfill Site (Donegal County Council)
DCC wishes to design and construct an ICW solution for Ballynacarrick LS. When preliminary design work is complete a specified engineering works (SEW) report must be submitted to the EPA for approval in order that the scheme may progress. A review of the current waste licence will also be needed.
The direct discharge arrangements will be key to securing EPA approval for the scheme. The design must demonstrate to the satisfaction of the EPA that the discharge from the treatment system ‘has no significant …
View the procurement »
2020-08-05DPS for the Provision of Goods and Services for Energy and Climate Action Consultancy Projects and for the Provision... (3 Counties Energy Agency)
The 3 Counties Energy Agency (‘3CEA’) (the ‘Contracting Authority’) is issuing this request for applications to participate (‘RFATP’) in a Dynamic Purchasing System (‘DPS’) on its own behalf and on behalf of other agencies and public bodies such as SEAI Sustainable Energy Communities, members of the Association of Irish Energy Agencies (AIEA), One-Stop-Shops under the aegis of the National Retrofit Delivery Body, local authorities and LEADER companies. The DPS will be coordinated and managed by the 3CEA.
View the procurement »
2020-07-31Limerick City and Environs Flood Relief Scheme, Integrated Engineering and Environmental Consultancy Services (Limerick City and County Council)
The objective of this project is the identification, design and submission (for planning consent) of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding to the Community of Limerick City and Environs to a determined standard of protection and to procure, manage and oversee the construction of the Scheme. The consultant shall also assess, design and deliver a geotechnical assessment of existing embankments within the scheme …
View the procurement »
2020-07-27Procurement of Architect Led Design Team Services for Killybegs 2040 — A Town Centre Regeneration Project (Donegal County Council)
Donegal County Council proposes to carry out a Town Centre Regeneration Development at Killybegs in the Donegal Municipal District consisting of the following elements:
• Renovation, extension and modification of the existing Island House building to provide a Tourism Information Centre and Digital/Enterprise Hub with public amenities and café space.
• Redevelopment of the Diamond public car park to provide a civic space and revised car parking layout.
• Alterations to the adjacent road layout and …
View the procurement » Mentioned suppliers:Aspect Architecture Ltd