2023-08-22   8498 - Corporate Power Purchase Agreement for Iarnród Éireann (Iarnrod Eireann-Irish Rail)
Call to competition by Iarnród Éireann (IÉ) for the procurement of financially-settled renewable electricity and the associated guarantee of origin certificates (GOs) via a newly built offsite corporate power purchase agreement (CPPA) View the procurement »
2023-06-30   23/005 - Supply of Electricity and Gas to Gas Networks Ireland (Gas Networks Ireland)
Gas Networks Ireland has a requirement for the provision of Electricity and Gas. The contract has been subdivided into 2 lots. Each lot is described below Lot 1 Supply of Electricity to Gas Networks Ireland Lot 2 Supply of Gas to Gas Networks Ireland View the procurement »
2023-04-24   23/021 - Supply of Electricity to Uisce Éireann (Uisce Éireann)
Uisce Éireann is tendering to establish a Single Supplier Framework for the provision of Electricity Supply. The provision of Electricity Supply will be a fully flexible supply contract. The Framework has been sub-divided into ten lots based on tariff. Suppliers must price for all lots. Tenderers are invited to submit proposals for fully flexible 100% Green Electricity Supply and fully flexible Brown Electricity Supply. Lot 1 Low Voltage Maximum Demand Quarter Hourly Tariff Lot 2 Low Voltage Maximum … View the procurement »
Mentioned suppliers: Energia Customer Solutions Limited
2023-04-18   Expressions of Interest / Call for Competition for: SUPPLY OF OPGW & ACSR CONDUCTORS & ACCESSORIES FOR THE NSIC PROJECT (Electricity Supply Board (ESB))
CALL FOR COMPETITION / EXPRESSIONS OF INTEREST FOR: SUPPLY OF SUPPLY OF OPGW & OPPC & ACSR OHD CONDUCTORS & ACCESSORIES AS A FULLY WARRANTIED SYSTEM TO PROJECT SITES OVER A 3-YEAR TIMEFRAME FOR THE NSIC PROJECT eTenders Reference: RFT 226850 View the procurement »
2022-08-16   Supply of Electricity to Irish Water (Irish Water)
Irish Water is tendering to establish a Single Supplier Framework for the provision of Electricity Supply to Irish Water. The provision of Electricity Supply will be a fully flexible supply contract. The Framework has been sub-divided into ten lots based on tariff. Suppliers must price for all lots. Tenderers are invited to submit proposals for fully flexible 100% Green Electricity Supply and fully flexible Brown Electricity Supply. Lot 1 Low Voltage Maximum Demand Quarter Hourly Tariff Lot 2 Low Voltage … View the procurement »
2022-05-23   SINGLE PARTY FRAMEWORK FOR THE PROVISON OF ENERGY ADVISORY SERVICES WITH EXPERTISE IN PROCURMENT IN THE ELECTRICITY... (Horse Racing Ireland (HRI))
The purpose of this agreement is to provide energy advisory services to Horse Racing Ireland and its Subsidiaries as well as to a number of affiliated locations. The affiliated locations are the Irish Horseracing Regulatory Board, The Irish National Stud, The Irish Equine Centre, Cork Racecourse, Curragh Racecourse and R.A.C.E. The successful tenderer must have / establish a good working relationship with the MRSO (Meter Registration System Operator), the GPRO(Gas Point Registration Operator), the ESB … View the procurement »
Mentioned suppliers: Action Zero
2021-12-20   National Network, Local Connections Programme – Flexibility Services Pilot (Electricity Supply Board ( ESB ))
Call for Competition with a Pre Qualification Questionnaire for the National Network, Local Connections Programme – Flexibility Services Pilot. View the procurement »
Mentioned suppliers: Electricity Exchange DAC t/a VIOTAS ENDECO TECHNOLOGIES LTD T/A GRID BEYOND
2021-10-11   Provision of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm – Coillte CGA (Coillte CGA)
Coillte invites expressions of interest from suitable candidates in respect of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm. Please refer to the expression of interest document (PQQ) attached for further details on requirements. Please also note that this document must be completed and returned by the deadline cited. View the procurement »
2021-10-11   Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022 EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from … View the procurement »
Mentioned suppliers: ESB Generation & Wholesale Markets Huntstown Power Company Limited
2020-04-02   Control Room of the Future (EirGrid plc)
EirGrid is seeking expressions of interest from suitably qualified and competent advisors to review our current control room operations in Dublin/Belfast and other jurisdictions in the energy and non-energy sectors from around the world to identify best practice in terms of tools, processes and systems. This is expected to include big data analytics promoting control and decision making in a dynamic environment to facilitate automation for our 2030 and beyond requirements taking the high level of planned … View the procurement »
Mentioned suppliers: EPRI Europe DAC
2019-12-17   19/186 Supply of Electricity to Ervia (Ervia)
Ervia is tendering to establish a framework for the provision of electricity supply to Ervia and each of its group companies. The provision of electricity supply will be a fully flexible supply contract. The framework has been sub-divided into 9 lots based on tariff. Each lot described below is for a 36 month fixed term. Tenderers are invited to submit proposals for fully flexible 100 % green electricity supply and fully flexible brown electricity supply. Lot 1: Low Voltage Maximum Demand Quarter Hourly … View the procurement »
Mentioned suppliers: Energia Customer Solutions Ltd
2019-09-06   Samuel Beckett Civic Campus Phase 2: Electrical Services (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on phase 1 and will include the following: A. The change of use of the Phase 1 sports and community building to a library and community building; B. Refurbishment of the existing sports building to create a new library; C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s … View the procurement »
2018-07-04   Electricity Supply for NSCDA (Operations) DAC (NSCDA (Operations) DAC)
This Request for Tender (RFT) outlines the key requirements for the supply of electricity for NSCDA (Operations) DAC. View the procurement »
Mentioned suppliers: Energia
2018-06-01   Supply of Electricity to Ervia (Ervia)
Ervia is tendering to establish a Framework for the provision of electricity supply to Ervia and each of its group of companies. The Framework has been sub-divided into 5 lots based on the connection type and location of each lot. Each Lot described below is for a 14 month fixed term (with the option (at Ervia’s discretion) to extend by 2 further periods of 12 months each on the terms set out in the Contract). — Lot 1 includes all half hourly metered supplies in the Republic of Ireland (ROI), and … View the procurement »
Mentioned suppliers: SSE Airtricity Ltd
2016-06-14   Supply of Electricity to Ervia (Ervia)
Each Lot described below is split into an Sub-Lot A and Sub-Lot B where Sub-Lot A is a 3 year fixed term (with the option (at Ervia's discretion) to extend by 2 further periods of 12 months each on the terms set out in the Contract) and Sub-Lot B is a 2 year fixed term (with the option (at Ervia's discretion) to extend by 2 further periods of 12 months each on the terms set out in the Contract): Lot 1 includes all half hourly metered supplies in the Republic of Ireland (ROI), and includes sub categories … View the procurement »
2016-05-23   Provision of Electricity for NSCDA (Operations) Ltd (NSCDA (Operations) Ltd)
This Request for Tender (RFT) outlines the key requirements for the supply of electricity to 12 electricity accounts (2 x MV, 1 x LVMD QH, 3 x LVME NQH, 4 x General Purpose and 1 x General Purpose Night and 1 x Domestic) on behalf of NSCDA (Operations) Ltd for the National Sports Campus (NSC). View the procurement »
2016-01-29   16/020 — Request for Demand Side Unit Aggregators (Ervia)
Irish Water seeks requests to participate from DSU Aggregators in a tender to enable Irish Water to partake in the demand side response scheme as offered by Eirgrid. View the procurement »
2014-12-19   Single Supplier Framework Contract for the supply of electricity and related services (The Office of Government Procurement)
Single Supplier Framework Contract for the supply of electricity and related services. View the procurement »
Mentioned suppliers: Electric Ireland
2013-07-23   13/070 - Single-Supplier Framework for the Provision of Electricity Supply to Bord Gáis Éireann (Bord Gais Eireann)
The expected scope of services is the provision of electricity supply to BGÉ at multi-site locations. It is intended that the initial contracts to be awarded under the Framework Agreement will be for provision of supply of electricity for Irish Water. The Framework Agreement may also be used for provision of electricity to other parts of the BGÉ Group. The supplies and services required by BGÉ have been divided into lots as further described below: Lot 1: Low Voltage Maximum Demand Supplies with Non … View the procurement »
2013-02-01   NAC - Provision of Electricity to the National Aquatic Centre (NSCDA (Operations) Ltd)
Provision of Electricity to the National Aquatic Centre. The proposed contract period will commence on the 1st April 2013. Proposal should show variable/flexibility. View the procurement »
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under … View the procurement »