2026-03-05Tender (RFT) for Electricity Supply at Medite SmartPly 26 (SmartPly Europe DAC)
MEDITE SMARTPLY invites suitably qualified and licensed electricity suppliers to submit tenders for the provision of renewable electricity supply options. Suppliers must be appropriately licensed and capable of delivering renewable electricity in accordance with the requirements set out in the following sections of this document, together with the data provided electronically alongside this document. Suppliers are requested to submit their tenders on the following basis: Medite Smartply electricity usage …
View the procurement »
2025-12-05SINGLE PARTY FRAMEWORK FOR THE SUPPLY OF ELECTRICITY AND NATURAL GAS TO HORSE RACING IRELAND AND SUBSIDIARIES Lot 1:... (Horse Racing Ireland (HRI))
Horse Racing Ireland (HRI) was established by the Irish Government under the Horse and Greyhound Racing Act 2001 and the Irish Horseracing Industry Act 1994. It is a commercial semi-state body that is responsible for the administration, promotion and development of Horse Racing in Ireland. HRI subsidiaries include Irish Thoroughbred Marketing Ltd (ITM), Tote Ireland Ltd and HRI Racecourse Division consisting of Leopardstown Racecourse, Fairyhouse Racecourse, Navan Racecourse, Tipperary Racecourse and …
View the procurement »
2025-10-22Design, Supply, and Installation of Purpose-Built Residential Cabins for Depaul Ireland (Depaul_158465)
Depaul Ireland is seeking suitably qualified suppliers for the design, supply, and installation of four purpose-built residential cabins to provide temporary accommodation for individuals experiencing homelessness. These cabins will serve as transitional housing units, supporting service users in their journey from homelessness to independent living. The units must be durable, weather-resistant, and easy to maintain, ensuring year-round use and longevity. The successful supplier will be responsible for …
View the procurement »
2025-08-19Preliminary Business Case for the Atlantic Marine Energy Test Site (AMETS) (Sustainable Energy Authority of Ireland)
In summary, the Services comprise of the development of a Preliminary Business Case for the Atlantic Marine Energy Test Site (AMETS) in line with the requirements of the Infrastructure Guidelines available at - https://www.gov.ie/en/collection/e8040-infrastructure-guidelines/ A holistic case will be developed for a policy intervention considering strategic alignment with national and European policy, climate action plan targets and actions, sectoral trends and needs, identification of a longlist of …
View the procurement »
2025-06-17ENQEIR964 - EIDAC Trading Services (EirGrid plc)
EIDAC owns the East West Interconnector which links the electricity grids of the island of Ireland and Great Britain via submarine cables running between converter stations in Ireland and Wales. EIDAC manages the commercial exposure associated with physical unavailability on this link. Imbalance charges will arise under a forced outage as capacity on the East West Interconnector, EWIC, normally utilised by the market can no longer be delivered as the interconnector is unavailable. In order to effectively …
View the procurement »
2025-06-10Supply of electricity and gas - Facilities/7249 (European Foundation for the Improvement of Living and Working Conditions)
The subject of this call for tenders is: Lot 1: Provision of 100% renewable (green) electricity to Eurofound, the European Commission, DG SANTE, Directorate F, and the European Parliament Liaison Office. The supply shall be continuous and provided under a fixed 24-month electricity unit rate based on a 100% green tariff. The Contractor shall guarantee that all electricity delivered under this contract is exclusively sourced from renewable energy. Lot 2: Provision of natural gas to Eurofound under a fixed …
View the procurement »
2025-05-20ENQEIR953 – Green Electricity Supply for EirGrid Interconnector Designated Activity Company (EirGrid plc)
A single party Framework for the provision of Green Electricity for EirGrid Interconnector Designated Activity Company. Please note the meter is located at Portan Converter Station in Woodland Co. Meath and the MPRN is 21305588106. The MIC for the meter is 3,684 kVA and the metering data for the previous 24 months is attached in supporting document. Please note EWIC was not operated in SVC mode in the last 2 years therefore there was no energy usage. For the purpose of evaluation, we have included …
View the procurement »
2025-02-28ZEVI TII EV Recharging Infrastructure Light Duty Vehicle (LDV) National Road Grant Scheme Phase 3 (Transport Infrastructure Ireland (TII))
TII is launching a new multi-million euro grant scheme, funded by the Department of Transport through the Zero Emission Vehicles Ireland unit (ZEVI), to incentivise and accelerate the development of Electric Vehicle Charging Infrastructure (EVCI) on most of the Primary and Secondary non-Ten-T network sections of the National Road Network in the State. The Alternative Fuel Infrastructure Regulation (AFIR) provides mandatory targets to be achieved by Member States for EV charging infrastructure dedicated …
View the procurement »
2024-07-31INVITATION TO TENDER 2024 Supply of Electricity and Gas to Coillte (Coillte CGA)
INVITATION TO TENDER 2024 Supply of Electricity and Gas to Coillte Please note that information relating to this Invitation to Tender, including clarifications and changes, will be published on the SMS Proactis System. Responses to queries will be circulated to all Tenderers through the SMS Proactis system. The identity of the person making a query will not be disclosed when circulating the response. Please note that the Contracting Authority cannot accept responsibility for information relayed (or not …
View the procurement »
2024-06-138264 - Supply of Electricity to CIÉ Group (Iarnrod Eireann-Irish Rail)
The tender process will include Iarnród Éireann, Bus Éireann, Bus Átha Cliath and CIÉ Holding Company however unit will have the flexibility to act autonomously under the contract. A mix of Wholesale, flexible pricing and domestic pricing will be required.
View the procurement »
2024-04-24Legacy marine data and rights to publish legacy marine data to include all of Ireland (Department of the Environment Climate and Communications)
As part of a new plan-led regime, the offshore wind Phase Two policy approved by Government in March 2023 requires that all future offshore renewable energy developments in Ireland will take place within Designated Maritime Area Plans (DMAPs), which will be established according to provisions in the Maritime Area Planning Act, 2021. Specifically, all future developments will take place at specific sites within DMAPs that have been identified for this purpose by Government. Government and the Oireachtas …
View the procurement »
2023-09-20Supply of Gas and Electricity for Dublin Port (Dublin Port Company_411)
The Contracting Authority proposes to engage in a competitive process for the establishment of a contract for the supply of Electricity and Gas at Dublin Port Dublin Port Company’s energy portfolio is broken down as follows: Electricity: • 9 QH sites • 7 LVMD NQH sites • 15 GP sites • 16 GPNS NQH sites • 3 Unmetered and Natural Gas: • 1 MBU • 1 FVT. Tenderers must upload their response in a Zip File Format
View the procurement »
2023-04-2423/021 - Supply of Electricity to Uisce Éireann (Uisce Éireann)
Uisce Éireann is tendering to establish a Single Supplier Framework for the provision of Electricity Supply. The provision of Electricity Supply will be a fully flexible supply contract. The Framework has been sub-divided into ten lots based on tariff. Suppliers must price for all lots.
Tenderers are invited to submit proposals for fully flexible 100% Green Electricity Supply and fully flexible Brown Electricity Supply.
Lot 1 Low Voltage Maximum Demand Quarter Hourly Tariff
Lot 2 Low Voltage Maximum …
View the procurement » Mentioned suppliers:Energia Customer Solutions Limited
2023-02-2823/004 - Supply of Electricity to GNI UK (GNI (UK) Limited)
GNI (UK) Limited is a wholly owned subsidiary of Gas Networks Ireland, registered in England and Wales. The principal activity of the company is the transportation of natural gas (1) together with GNI, through two pipelines from Moffat in Scotland to Ballough in Ireland: and (2) from Belfast to Derry (through the North-West Pipeline) in Northern Ireland, and from Gormanston, Ireland to Belfast (through the South-North Pipeline).
The purpose of this Invitation to Tender (ITT) is to select an electricity …
View the procurement » Mentioned suppliers:British Gas Trading Ltd (CENTRICA PLC)
2022-08-16Supply of Electricity to Irish Water (Irish Water)
Irish Water is tendering to establish a Single Supplier Framework for the provision of Electricity Supply to Irish Water. The provision of Electricity Supply will be a fully flexible supply contract. The Framework has been sub-divided into ten lots based on tariff. Suppliers must price for all lots.
Tenderers are invited to submit proposals for fully flexible 100% Green Electricity Supply and fully flexible Brown Electricity Supply.
Lot 1 Low Voltage Maximum Demand Quarter Hourly Tariff
Lot 2 Low Voltage …
View the procurement »
2022-05-23SINGLE PARTY FRAMEWORK FOR THE PROVISON OF ENERGY ADVISORY SERVICES WITH EXPERTISE IN PROCURMENT IN THE ELECTRICITY... (Horse Racing Ireland (HRI))
The purpose of this agreement is to provide energy advisory services to Horse Racing Ireland and its Subsidiaries as well as to a number of affiliated locations.
The affiliated locations are the Irish Horseracing Regulatory Board, The Irish National Stud, The Irish Equine Centre, Cork Racecourse, Curragh Racecourse and R.A.C.E.
The successful tenderer must have / establish a good working relationship with the MRSO (Meter Registration System Operator), the GPRO(Gas Point Registration Operator), the ESB …
View the procurement » Mentioned suppliers:Action Zero
2021-11-23Electricity Supply for Sport Ireland Facilities DAC (Sport Ireland Facilities DAC)
Sport Ireland Facilities DAC are one of Ireland’s large energy users with electricity usage of circa. 6 GWh per annum. The purpose of this ITT is to select an energy supplier to supply electricity to Sport Ireland Facilities, the contract period 01 February 2022 for 24 months with an option to extend for an additional 12 months. Price and contract flexibility will be key determinants in the selection of supplier/s. Additional selection criteria will also apply as detailed in the tender specification.
View the procurement » Mentioned suppliers:Energia Customer Solutions Ltd
2021-10-11Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022
EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from …
View the procurement » Mentioned suppliers:ESB Generation & Wholesale MarketsHuntstown Power Company Limited
2020-04-30Supply of Electricity to CIE (Iarnrod Eireann-Irish Rail)
The CIE group have requirement for the supply of electricity to meet the needs of the DART Commuter Train Services in the Dublin area, bus and train workshops, train stations, depots, offices and premises of the CIE Group around the bus and rail network in Ireland and also to provide electricity to Rosslare Europort (managed by Iarnród Éireann). The tender process will include Iarnród Éireann, Bus Éireann, Bus Átha Cliath and CIE Holding Company.
View the procurement »
2019-12-1719/186 Supply of Electricity to Ervia (Ervia)
Ervia is tendering to establish a framework for the provision of electricity supply to Ervia and each of its group companies. The provision of electricity supply will be a fully flexible supply contract. The framework has been sub-divided into 9 lots based on tariff. Each lot described below is for a 36 month fixed term.
Tenderers are invited to submit proposals for fully flexible 100 % green electricity supply and fully flexible brown electricity supply.
Lot 1: Low Voltage Maximum Demand Quarter Hourly …
View the procurement » Mentioned suppliers:Energia Customer Solutions Ltd
2019-08-23An Post Tender for Supply of Electricity (An Post)
An Post is proposing to tender for the appointment of one or more suppliers to supply electricity to its premises and sites (approx. 170) nationally. It is anticipated that the contract(s) will be in place for period of 3 (three) years with an option to extend for a period up to a further 4 (four 2+2) years.
Supply of electricity will be tendered in 2 Lots:
Lot 1: An Post DG 7 sites (100 % green energy) An Post DG 6 sites (100 % Green Energy);
Lot 2: An Post DG 6 NQH sites (100 % green energy) — An Post …
View the procurement » Mentioned suppliers:ESB Independent Energy Limited T/A...
2019-07-122019 Supply of Electricty and Gas to Coillte CGA (Coillte CGA)
The Contracting Authority invites responses to the Invitation to Tender (ITT) from economic operators (‘Tenderers’) for the supply of gas and 100 % renewable electricity to the company for a one year period beginning 1.9.2019 ending 31.8.2020 and separately for a 2- year period beginning 1.9.2019 ending 31.8.2021.
To access the tender documentation for this competition please log on to Coillte’s Supplier Management System (SMS) Proactis by going to (http://www.coillte.ie/), click on ‘Our Business’ – …
View the procurement »
2018-10-15Regulated Energy Market Assurance Services (Electricity Supply Board (ESB))
ESB Networks Ltd intends to procure a framework contract for regulated energy market assurance services for the Retail Market Design Service (RMDS). Retail Market Design Service is the “ringfenced” function within ESB Networks Ltd responsible for all aspects of the retail electricity market design on behalf of the commission for energy regulation.
View the procurement » Mentioned suppliers:Gemserv Ltd