2024-10-23   P20099 - T1 Facade, Roof L40 L50 and Spirals Repair (daa plc)
Dublin Airport T1 Facade, Roof L40 L50 and Spirals Repair View the procurement »
2024-09-11   Shannon Airport ASL Hangar Door Replacement Works - Door replacement (Shannon Airport Authority DAC)
Shannon Airport ASL Hangar Door Replacement Works - Door replacement. This project involves dismantling and removal of existing fabric doors in addition to the design, supply and installation of new fabric doors to the ASL Hangar in Shannon Airport View the procurement »
2024-02-19   P19281 Construction of New Mezzanine for C3 Security Upgrade at Cork Airport (daa plc)
Completion of detailed design, enabling works and construction of a new mezzanine within the existing terminal building at Cork Airport to facilitate the upgrade and reconfiguration of the security screening system (installation of C3 scanning equipment) and associated architectural, structural and mechanical / electrical works View the procurement »
2024-01-23   P19740 Airfield Drainage Works - Dublin Airport (daa plc)
The Airfield Drainage Works project has the core objective of providing source control for surface water contaminants, namely pavement surface de-icing chemicals and aircraft de-icing/anti-icing glycols. Due to the current infrastructure shortfall in surface water management capacity this project proposes significant upgrades to the infrastructure through a series of drainage system enhancement measures. The project includes the upgrade of existing drainage and the construction of additional … View the procurement »
2023-07-26   IWAK RWY26 RESA Upgrade (Connaught Airport Development Company Ltd)
The objective for this project is to upgrade the RWY 26 RESA and the associated an ancillary works to ensure that the RWY 26 RESA is fully the exiting RESA against clauses from Chapter C – Runway End Safety Area of the European Union Aviation Safety Agency (EASA) Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) Issue 6. View the procurement »
2023-07-12   P18599 South Apron Hub Construction (daa plc)
The South Apron Hub (SAH) development forms part of the overall North Apron and South Apron Hub (NASAH) programme of works, which comprises a series of transformation projects to facilitate operational efficiency improvements and capacity enhancement at Dublin Airport. View the procurement »
2023-04-06   North Apron Hub Development (daa plc)
This RFI is the first stage in the procurement process to identify a suitably experienced building Contractor to design, procure, construct, test and commission, put into service (including assisting the Contracting Authority with Operational Readiness and Airport Transfer) and undertake close-out activities for the NA development at Dublin Airport. View the procurement »
2022-07-21   Solar Photovoltaic Farm Frameworks (1) (daa plc)
The Contracting Authority, wishes to put in place a Framework Agreement with a suitably qualified contractor to act on behalf of the Contracting Authority in developing a 7,500kWp minimum Solar Photovoltaic (PV) plant within the Dublin Airport campus to provide on-site renewable electricity to Dublin Airport. The Contracting Authority previously advertised this opportunity (2022/S 079-213723) due to changes in the Contracting Authorities requirements we are re-advertising this opportunity. The … View the procurement »
2022-04-19   Solar Photovoltaic Farm Frameworks (daa plc)
The Contracting Authority, wishes to put in place a Framework Agreement with a suitably qualified contractor (hereafter referred to as the ‘Contractor’) to act on behalf of the Contracting Authority in developing a 7,500kWp minimum Solar Photovoltaic (PV) plant within the Dublin Airport campus to provide on-site renewable electricity to Dublin Airport. The project is currently at concept stage. The Contracting Authority requires a partner to design, build, operate, and maintain the proposed solar … View the procurement »
2021-03-04   Airside and Landside Civil Works Framework (daa plc)
The contracting authority, wishes to put in place two (2) bespoke framework agreement’s with two (2) suitably qualified civil contractor’s to act on behalf of the contracting authority in carrying out: 1) Airside and Landside Civil works (including pavement, concrete and all associated works to successfully deliver a civil works contract) at Dublin Airport; and 2) Construction of a Underpass (including all associated works to successfully deliver the contract) at Dublin Airport, as described in the … View the procurement »
2021-02-17   Dublin Airport (DAP) Works Framework Agreement (daa plc)
The scope of the projects issued under the WP11 Dublin Airport (DAP) works framework agreement comprises the design, procurement, construction, testing, commissioning and putting into service of works and services to safeguard the potential for future development at Dublin Airport and improve the existing infrastructure. View the procurement »
2020-11-25   Rehabilitation of Runway 16/34 at Cork Airport (daa plc)
Daa wishes to put in place a bespoke non-exclusive framework agreement with a suitably qualified design and build contractor to act on behalf of daa in carrying out the design and build works associated with rehabilitation of runway 16/34 at Cork Airport, and other associated works as required by daa as described in the RFI documents available at www.etenders.gov.ie Daa will be utilising the accelerated procurement procedure available under Directive 2014/25/EU for this procurement process. Due to the … View the procurement »
2019-04-25   Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works. Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2). This RFI seeks to … View the procurement »
2017-11-14   Design and Construction Services for North Apron 5H Stands Main Works (daa plc)
The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G. View the procurement »
2017-06-16   HBS Upgrade / Baggage Integrators (daa plc)
Daa currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the daa wishes to procure the services of a baggage integrator(s) for three (3) Lots (Dublin T1, Dublin T2 and Cork) to act as design and build contractor for the design, supply, installation, testing and commissioning and … View the procurement »
2017-04-25   HBS Upgrade / Baggage Integrators (daa plc)
Daa currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the Daa wishes to procure the services of a baggage integrator(s) for three (3) Lots (Dublin T1, Dublin T2 and Cork) to act as design and build contractor for the design, supply, installation, testing and commissioning and … View the procurement »
2017-01-23   RFI for Shannon Airport Aircraft Hangar and Taxiway Project (Shannon Airport Authority DAC)
The Works Contractor shall be responsible for the construction of a new 7 200 m² steel framed aircraft hangar clad with insulated panels within the airport lands at Shannon Airport, Co. Clare, Ireland. The area includes for ancillary office space, workshops, plant rooms and storage space. Site works including car parking, landscaping and civil works. The hangar will have an approximate 90m clear span steel roof truss with the works being carried out in poor ground conditions requiring significant ground … View the procurement »
2015-09-07   Runway 10/28 and Associated Taxiways Rehabilitation and Enhancements to (Dublin Airport Authority plc (DAA))
This particular project is located within Dublin Airport (airside) which opened to operations in 1941. In 1950, annual passenger traffic was recorded at 212 661 persons with 16 769 air transport movements. By 2008, passenger numbers had risen to some 23 500 000 (passengers) with more than 210 000 commercial air transport movements. During 2008-2012 these numbers reduced, however Dublin Airport has enjoyed steady growth since then and in 2014 there were 21 700 000 passengers. The airport has progressively … View the procurement »
2015-05-14   Capacity Development Management Building Contract at Dublin Airport (daa plc)
A 5 year capacity development plan has been prepared to improve functionality and capacity of Dublin Airport. The output of this plan is a requirement to enhance components of the existing building infrastructure. As part of this overall plan, the following works are proposed to be carried out: 1. Pier 2 Segregation; 2. T1 and T2 Bussing Gates; 3. T2 Transfer Facility; 4. Pier 3 Wide Body Facility; 5. T1 Security Screening Facility; 6. New areas created to facilitate displaced staff; 7. Any associated … View the procurement »
2015-01-05   Automatic Tray Return Systems (ATRS) (daa plc)
Daa currently has a number of passenger search areas in service across its 2 Terminals at Dublin (Terminal 1 and Terminal 2) Airport. These Search areas are an essential component of the Terminal operations at each Airport. As well as being required to be efficient and smooth they must first and foremost comply with both EU and International Compliance Regulations. As a result, daa plc intends to upgrade the existing passenger screening systems between 2015 and 2016 to accommodate enhanced security … View the procurement »
2015-01-05   Airside Electrical Installation Framework (daa plc)
The Contracting Authority proposes to appoint between 4 and 8 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield Electrical construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2015 to 2019 inclusive. View the procurement »
2014-08-19   HOB Refurbishment Project (Design and Build) (Dublin Airport Authority plc (DAA))
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the ‘Employers Requirements Documents’. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose. View the procurement »
2014-03-11   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc (DAA))
The Contracting Authority proposes to appoint between 4 and 12 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement »
2013-12-02   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to appoint between four (4) and twelve (12) Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement »
2013-11-29   P2175 - Retail Street Development / Phase 3 (Dublin Airport Authority plc ( DAA ))
To manage & construct a retail refurbishment in a live operational Airport Terminal Building at Dublin Airport as per the following overview: — Development of a 2000 sq.m. Fit out for a Retail unit. — Development of a 700 sq.m. Shell & Core for a future Fit-Out. — Refurbishment of an 800 sq.m. Public concourse. View the procurement »
2012-03-21   New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following: — Threshold 26 relocation, — CAT I approach lighting system relocation, — Eastern RESA extension to approximately 150mx240m, — Western RESA extension to approximately 150mx240m, — Construction of concrete box to channel open drain, — Construction of Eastern runway turn pad extension, — Construction of Western runway turn pad extension, — Installation of runway guard lights, — Relocation of PAPI, — Relocation of glide path, — Reparation of … View the procurement »
2010-06-15   Construction work for airports (Dublin Airport Authority plc)
R132 upgrade. The proposed development represents approximately 1.3km of upgrade to the existing R132 (old Dublin – Belfast Road) between Collinstown Cross and the Airport Roundabout. The works involve upgrading the existing single carriageway road to a dual carriageway with bus lanes, cycleways, footpaths and grass verges. To register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=132742. View the procurement »
2010-03-10   Construction work for airports (Dublin Airport Authority plc)
Runway overlay. The project comprises construction of overlay on runway 10/28 at Dublin International Airport. The overlay is intented to comprise of a thin porous friction course (TPFC). TPFC is constructed with special integrated asphalt pavers where the tack-coat is applied just before the asphalt material is placed (similar to the French developed Novachip). View the procurement »
2010-01-28   Airport buildings construction work (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Pier B Connectivity Project. This contract is for the construction, at Dublin Airport, of an airside connection between Pier B (at ground floor level) and Pier C (at second floor level). It is intended that this work will be procured as a traditional contract with the majority of works designed by the Client’s team. Specific elements of specialist design may be allocated to the contractor. These elements will be detailed within the tender … View the procurement »
2009-10-08   Airport buildings construction work (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Hanger Refurbishment Works Framework. Dublin Airport Authority plc proposes to set up a Framework Agreement for Hangar Refurbishment and Associated Building Works at Dublin Airport, with Main Contractors for works valued up to a maximum of €10 million for any one project. The Framework will be kept in place for a 3 year period and mini competitions will be run as and when required between the panel members. Work to be carried out by contractors … View the procurement »
2009-06-03   Airport buildings construction work (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: T1–T2 Airside Link- Suspended Enclosed Pedestrian Bridge. This contract includes works required to provide an airside connection between the new terminal (T2) and the existing Pier B which adjoins Terminal 1. The link will comprise a suspended enclosed pedestrian bridge which will follow the line of the existing Pier B, Terminal 1 and Pier C structures. A new Vertical Circulation Core building (VCC) will connect the link to Pier B of Terminal 1. … View the procurement »
2007-12-13   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/22 T2 Specialist Systems. TP7200 Specialist Systems. Installation of specialist systems to the Terminal, Remote Check, VCCs, Pier E and Energy Centre. The scope of Specialist Systems includes the final detailed design, Project Management and co-ordination of specialist sub-contractors, supply, installation, setting to work, system testing, integration testing, final implementation and acceptance, training, and documentation for the … View the procurement »
2007-12-04   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Supply and install airbridges. This project involves the immediate supply and installation of 3 passenger boarding bridges or airbridges at Shannon Airport, Ireland with an option for the replacement of a further 3 airbridges within 5 years. The project also includes the immediate design, supply and installation of 4 fixed-link sections between 4 airbridges (3 new and 1 existing) and the terminal building. further information and additional … View the procurement »
2007-01-26   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/15 T2 Kerbs and Forecourts. Construction of permanent roads, forecourt and all associated works including drainage, infrastructure pit and duct systems, external lighting, signage and street furniture. The trade package design responsibility is limited to temporary works design, i.e. temporary ground water measures, traffic management, etc. installation of infrastructure services where specified (contracts with utilities may be … View the procurement »
2006-12-22   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/13 Dublin Airport T2 Energy Centre. Provision of the energy centre including structural steelwork, envelope cladding, modularised mechanical plant, pipework and electrical installation works. Substructure by others. All installation works 'landside'. There will be some elements of specialist technical fit out by others (not part of this enquiry). This includes BMS, Fire Detection and Alarm systems, Energy Management system and lighting … View the procurement »
2006-12-22   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/14 Dublin Airport T2 Apron Regrading / Pavement Works. Breaking out and re-construction of airside pavement works associated with the new Pier E, including service and fuel main associated with the new aircraft stands. Provision of drainage and services modifications. Isolation and capping of existing above and below ground services. Breaking out of existing pavement concrete including Pier E footprint. Provision of specified hardcore … View the procurement »
2006-11-29   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Central Immigration Facility Pier A & D. New ground level single storey flat roof, glazed pedestrian corridor and associated ancillary works to provide a passenger route from Pier A to a proposed ground floor centralised immigration facility at Pier A, Ground Floor. Also, a new ground level extension to provide new walkway to southwest (airside) façade of existing Pier A Link, as well as the change of use of ground floor of Pier A from office … View the procurement »
2006-11-10   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/12 Dublin Airport T2 Substructure & Superstructure Concrete Works. Bulk excavation, disposal and fill. Concrete pad foundations and ground beams, drainage and other underground services, and substructure concrete works to the terminal, remote check-in facilities, arrivals vertical circulation cores, Energy Centre and possibly Pier E substructure works. Also included are superstructure works with the provision of re-inforcement and … View the procurement »
2006-10-07   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Upgrade to Airport Drainage System. Construction of Drainage Works to Taxiways Delta 1 and 2 at Shannon Airport. Further information relating to this notice may be available on the web site at: http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=40488. View the procurement »
2006-10-05   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/10 Dublin Airport Terminal 2 Structural Steelwork Package. The structural steelwork package comprises of the design of connections, manufacture, deliver and install of the structural steel frame and hollowrib decking to Dublin Airport Terminal 2. This includes steel staircases and lift shafts. The concrete works will be by others. The scope of works include the Structural Steelwork to the Main Terminal and Check-in building, Link … View the procurement »
2006-10-05   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/11 Dublin Airport Terminal 2 Envelope Package. The envelope package comprises of the design, manufacture, deliver and install of the complete weather cladding system to Dublin Airport Terminal 2. The cladding system will be based on a primary cassette system, followed by a secondary weather-tight layer. A number of different cladding systems will be utilised through-out the building envelope, including roof light modules, structural … View the procurement »
2006-10-04   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Relocation of Car Hire Facility. Design and build contractor services for a new car hire facility at Dublin Airport. The facility will consist of 6 industrial units and approximately 1 200 car parking spaces, associated hard / soft landscaping and siteworks. Each unit will include reception, car valet facilities and car wash facilities on the ground floor and office space on the first floor. Externally, each unit will have individual petrol … View the procurement »
2006-07-14   Construction work (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: CD 1049/8 Logistics Package. Design and construct of temporary works and temporary services, provide site boundary fencing and hoardings. Provision of personnel and vehicle controlled entry points, site security staff and equipment. Maintenance of site roads, maintenance and cleaning of site accommodation, provide staff and equipment for medical centre and site first aid rooms. Staff and equipment to manage site deliveries including offload and … View the procurement »
2006-04-15   Construction-related services (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Terminal 1 Extension. Extension to existing Terminal Building at Dublin Airport. This contract is for the design, management and construction of an extension to the existing terminal building at Dublin Airport and the associated infrastructural works. Elements of the work may inculde the development of the clients feasability scheme within agreed cost, time and quality levels, procurement of works packages to achieve an agreed contract sum and … View the procurement »
2006-04-08   Construction work for airports (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Lower Ground Floor Check-in Facility. The contract works involve the refurbishment and development of the existing basement area of the Main Terminal Building into a new passenger check-in facility incorporating a new baggage carousel. The gross floor area is approximately 2 132 m2. Elements of the works may include existing service diversions, foundations, structural steel, cladding, glazing, doors, lift refurbishment, escalators, baggage … View the procurement »