2023-09-25EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there …
View the procurement »
2023-09-25EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there …
View the procurement »
2023-08-31The National Maternity Hospital at St. Vincent's University Hospital Campus - WORKS CONTRACTOR and PSCS (Health Service Executive HSE)
The proposed development comprises the construction of The National Maternity Hospital at St. Vincent’s University Hospital campus, Elm Park, Dublin 4. The proposed new National Maternity Hospital building will be located at the eastern side of the hospital campus and comprises the construction of a building that rises to seven (7) storeys above ground level, with one partial basement level, plus additional ancillary plant areas on the roof level, giving an overall height of 42.300m. The gross floor area …
View the procurement »
2023-07-04Est Constr University Hospital Galway Site Clearance Works (Health Service Executive HSE)
The works comprise the removal and disposal of redundant temporary buildings and a single-storey section of permanent buildings, including removal of concrete ramps, steps and railings, redundant drainage and redundant mechanical and electrical services. The site is to be levelled and hoarded off on completion of the works. The works are to be carried out on the site of a fully functioning acute hospital. A section of building will be retained for use as a Neurology OPD adjacent to works to be removed. …
View the procurement »
2023-06-27Est Constr Surgical Hub at Merlin Park University Hospital Galway (Health Service Executive HSE)
The development will comprise of the following: •The provision of a three storey Surgical Hub building (Gross Floor Area: 4,265 sq.m) to include: o Staff Services, Storage and Plant Rooms at Ground Floor Level; o Operating Theatres, Preparation Area, Recovery Area , Waiting Area and ancillary support services at First Floor Level; and o Plant and associated equipment at Second Floor Level. • The provision of roof mounted Solar PV Panels; • The provision of 108 no. car parking spaces (including 6 no. …
View the procurement »
2023-05-31EST WORKS - Development and Lease of Surgical Services Hub in the North Dublin Area (Health Service Executive HSE)
Development of a surgical services hub on the tenderer’s land and/or building to be leased to the Health Service Executive (“HSE”) in the North Dublin Area. The HSE is initiating this tender competition in order to identify an economic operator with suitable lands and/or building and the capability to develop a surgical services hub to HSE specifications on the same land and/or building and lease it to the HSE. It is anticipated that that term of the lease will be circa 25 years from the completion of …
View the procurement »
2023-04-12Construction of 50 Bed Residential Care Centre - Sacred Heart Hospital Roscommon (Health Service Executive (HSE))
The demolition of 2 No outdated 1960s constructed single storey accommodation units, Our Ladys and St Josephs. Existing generator room and of the catering staff changing rooms and catering stores, and the construction of a new two storey 50 bed Community Nursing Unit. New single storey modular kitchen to the east of the existing link corridor and of a new single storey building linking the new residential accommodation to the existing corridor, all totalling 3994.3m2 of new floor area.
View the procurement »
2022-09-09TURNKEY DESIGN AND BUILD OPTION(S) FOR THEATRES AND DAY RECOVERY UNIT AT CORK UNIVERSITY HOSPITAL (Health Service Executive (HSE))
The HSE wishes to establish a new contract with a suitably qualified Service Provider (hereafter “Provider”) for the Provision of a Turnkey Design and Build option(s) for Theatres and Day Recovery Unit for Cork University Hospital (CUH) (hereafter “the Unit”). The HSE reserves the right to procure the Unit on either a rental or outright purchase basis, with the decision on this to be finalized following the dialogue stage of the process.
View the procurement »
2022-07-14Turnkey Specialist Facilities for new children’s hospital at St James’s Hospital Campus, Dublin 8 (National Paediatric Hospital Development Board)
The proposed works requirements will consist of the construction and fit-out of four separate Turnkey Specialist facilities with a total area of approximately 500sqm located throughout the new children’s hospital which is currently under construction on the site of the St James’s Hospital, Dublin 8.
1) Provision of Biosafety Laboratory
2) Provision of Stem Cell HSCT Laboratory.
3) Provision of Radio Pharmacy Aseptic Compounding Unit (RACU)
4) Provision of Pharmacy Aseptic Compounding Unit (ACU)
Responses …
View the procurement »
2022-03-11Framework Competition for Minor Works Contractor (St Vincent's University Hospital)
This is a multi-operator framework competition with a maximum of five (5) operators. Scores allocated to the First Works Contract will rank the five successful tenderers.
The First Works Contract includes the refurbishment of nine (9) existing bathrooms within the Herbert Wing of St. Vincent's University Hospital.
View the procurement »
2022-01-06Co. Cork - Bantry General Hospital, Clinical Capacity Expansion (Health Service Executive (HSE))
The works comprise the construction of a single storey Endoscopy Unit, of 1201.2 Sqm and the construction of a single storey extension to the existing hospital to provide 16 No. beds for a Stroke Rehabilitation Unit, of 1439.3 Sqm and all associated site development, including a link from the proposed Endoscopy Unit to the existing hospital, alterations to road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit extension.
View the procurement »
2021-12-16Kerry - Theatre Extension Project, University Hospital Kerry, Tralee (Health Service Executive (HSE))
The development will consist of the construction of a new single-storey rooftop extension to the existing Theatre Department at first floor level, located on the west side of the campus at University Hospital Kerry, to provide an expanded Theatre Department incorporating two new Operating Theatre Suites, a six-bay Recovery Area, support rooms and new Plant Rooms at first and second floor levels, enclosed escape stairway and associated site works.
View the procurement »
2021-07-26Acute Inpatient Ward (96-bed) Block at University Hospital Limerick (UHL) (Health Service Executive (HSE))
The development will be a new 4-storey, 96 single bed, acute inpatient ward block extension (GFA 9 817 m.) with interstitial plantroon floor part of existing plantroom all located above the existing 2 storey above ground Renal and Emergency Department over 2 Storey Basement Carpark, adjacent to the Critical Care Unit, along with supporting services associated with site works, additional plant on the existing phase 1 building, an extension to the existing outpatients department at level 0, 110 carparking …
View the procurement » Mentioned suppliers:John Sisk & Son (Holdings) Ltd
2020-08-08Minor Works/Services Framework Competition (St Vincent's University Hospital)
The competition consists of six (6) lots for works/services under EUR 1 million:
1) Lot 1: Contractor's work
2) Lot 2: Architectural Consultancy Services
3) Lot 3: Mechanical and Electrical (M&E) Engineer Consultancy Services
4) Lot 4: Quantity Surveying Consultancy Services
5) Lot 5: Fire Safety Consultancy Services
6) Lot 6: Assigned Certifier Services.
Candidates should note that only Lot 1 is a multi operator framework agreement with maximum five economic operators; the other Lots are single operator …
View the procurement »
2020-02-06Construction of a New 50 Bed Community Nursing Unit (CNU) at Tyone, Nenagh (Health Service Executive (HSE))
The development of this new 50 bed community nursing unit and associated landscaping/parking, at Tyone, Nenagh is to provide elderly care accommodation containing 50 bedrooms, to replace the existing St Conlon’s facility which currently has a capacity of 27 beds.
The new 50 bed community nursing unit is to be located on the 2,6 hectacre site, directly adjacent to the Nenagh Hospital campus, which has been selected to provide sufficient space provision for the construction of the new CNU and to also help …
View the procurement »
2019-05-15Supply, Delivery and Installation of an Ultra-Low Noise Digital 3T MRI Solution for Trinity College Dublin (TCD) (Education Procurement Service (EPS))
Tenders are sought for the Supply of Ultra Low Noise Digital 3T MRI for MRI of the brain and other body parts. A state-of-the-art MRI scanner is required by academic, clinical and industrial users across Ireland, and partners across Europe and the world. The future of neuro-imaging is in large-scale collaboration. To participate in H2020 and other consortia, a scanner capable of the international standard is essential. Several critical subject groups will only lay still for a limited period in the MRI …
View the procurement » Mentioned suppliers:Grania Heal
2019-05-09The Appointment of an Architect-led Multi-disciplinary Design Team in Connection with Beaumont Hospital's New Cystic... (Beaumont Hospital)
The Contracting Authority intends to develop a new dedicated in-patient Cystic Fibrosis Unit, which will further the objectives of the National Clinical Care Programme for Cystic Fibrosis (NCPCF). The Contracting Authority will construct a 3-storey block extension to its current premises with plant accommodation at the lower ground level, high dependency bedroom accommodation at upper ground and first floor levels and a link connection to the main hospital building. The Contracting Authority therefore …
View the procurement »
2018-07-2460 Bed Systems Build Ward Block — University Hospital Limerick (Health Service Executive (HSE))
The HSE requests tender bids for a design and build 4 storey systems build ward block on the University Hospital Limerick campus. The proposed development comprises a 60 bed ward block with Rooftop plantroom which will provide 60 en suite Single bedrooms in three wards to be realized on a Rapid build basis. The basement floor is primarily reserved for plant equipment associated with the development.
View the procurement »
2018-07-04New Centre for Radiation Oncology at University Hospital Galway (Health Service Executive (HSE))
Construction of a three storey Radiation Oncology Centre to include 7 radiotherapy treatment vaults, a brachytherapy suite, 2 CT rooms, on-treatment support and ancillary physics, treatment planning and administration facilities. The building will be approximately 8,050 sqm in area connected to the hospital via a single storey corridor. The project also includes a new surface car park and connections to existing below ground services.
The Works will be carried out on active hospital campus. Hospital …
View the procurement » Mentioned suppliers:John Paul Construction
2018-01-05Establishment of a Single Operator Framework for Enabling Works; The National Maternity Hospital at St Vincent's... (Health Service Executive (HSE))
The works relate to the creation of a single operator to deliver a series of enabling works in connection with The NMH relocation to the campus of SVUH. Such works will include but are not limited to, the following:
1) The provision of temporary service supplies including laboratory gases, N2O, LTHW, etc., and all associated works;
2) The provision of permanent service supplies including M, LV, FA, Oil, NG, Comms, etc., and all associated works;
3) Decommissioning of existing services and associated …
View the procurement »
2017-02-22Pharmacy and Car park Works at St. Vincent's University Hospital (St Vincent's University Hospital)
The Pharmacy
The proposed development will consist of the construction of a new pharmacy facility.
The works include the provision of a Pharmacy Automated Dispensing system within the New Pharmacy Building.
The installation of a New Pharmacy Aseptic Compounding Unit (ACU) within the New Pharmacy Building. The ACU is approximately 210 sq. m and will provide clean room facilities capable of operating to Grade B. The ACU comprises, Prep Room, Compounding Room, 2 x Changing Rooms, Aseptics Office, Aseptics …
View the procurement »
2016-10-20Healthcare Fit Out (Health Service Executive (HSE))
The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.
It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2 842 m².
View the procurement » Mentioned suppliers:Walls Construction Ltd
2016-05-11100 Bed Nursing Facility and Catering Department (Peamount Healthcare)
Construction of a new 2 storey healthcare unit comprising residential accommodation for 100 people, ancillary healthcare services, catering, pharmacy and staff facilities, associated site works, access road, landscaping, an internal link to the existing rehabilitation unit, together with redistribution of existing car parking spaces and the demolition of a disused building. The proposed works are located on the site of Protected Structures.
View the procurement »
2016-04-04Framework Agreement for Works (Mater Misericordiae University Hospital Ltd)
The Mater Misericordiae University Hospital (MMUH) is acting behalf of the hospitals that make up the Ireland East Hospital Group (IEHG) with respect to establishing a framework of 6 contractors who can be called-off to complete works contracts with a value in excess of 1 000 000 EUR.
View the procurement »
2015-09-29Construction of a Radiation Oncology Centre at Cork University Hospital (Health Service Executive (HSE))
Construction of a Radiation Oncology centre at Cork University Hospital (CUH):
A new facility of approximately 8 800 m² (Gross Floor Area) over three storeys above ground level, including Bunkers for seven Linear Accelerators and support accommodation, a Brachytherapy Suite, Shelled Out MRI Suite, 2 no CT Scanners, On-Treatment Support, Technical and Administration support accommodation and associated site works.
The Works will be carried out on active hospital campus site and will involve the …
View the procurement »
2015-05-25HSE West (Galway, Mayo and Roscommon Area) — Building Contractors Framework: 500 000 — 5 000 000 (Health Service Executive (HSE))
HSE West (Galway, Mayo and Roscommon) is seeking to Establishment a Framework (500 000 EUR — 5 000 000 EUR) of suitable building contractors for refurbishment, extensions and buildings works required for a number of their acute and non-acute Healthcare buildings and structures located throughout Galway, Mayo and Roscommon. These building works will be carried out in a live operational hospital / healthcare buildings which include all the associated health and safety requirements including dust / …
View the procurement »
2015-04-17New Build and Alteration Works to Sacred Heart Hospital Community Nursing Unit Castlebar (Health Service Executive (HSE))
The development will comprise the demolition of two wards and part of the link corridor at the east of the site, (4 698 ha) and the construction of a two storey extension (3 720 sq m total gross floor space), a single storey link corridor (47 sq m gross floor space), raising the parapet of the existing link corridor at the east of the site by approximately 1 metre, and the provision of an electrical backup generator 8.5 sq m, medical gas enclosure 12 sq m and vacuum plant enclosure 15 sq m in the service …
View the procurement »
2014-11-10Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont... (Beaumont Hospital)
The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric …
View the procurement »
2014-10-15Phase 2 Wards/Theatre/A&E Extension Building, Our Lady of Lourdes Hospital Drogheda Co. Louth (Health Service Executive (HSE))
The works consist of a new building constructed next to the phase 1 existing emergency department block. The new block will provide for an A & E extension on the ground floor, Three ward floors to provide approx eighty three new single beds and operating department of five operating theatres on the fourth floor. Initially however only a partial fit out is proposed comprising two ward floors and part of the ground floor.
View the procurement »
2014-06-21ED & Dialysis Fit Out & Other Works Project - New Emergency Department & Dialysis Unit Fit Out & Associated Other... (Health Service Executive (HSE))
The project includes the fit-out for new Emergency and Dialysis Departments
and related other works at University Hospital Limerick. The Emergency Department will be mainly accommodated in a shell building at level 0, part of which is directly underneath the hospital's current live Intensive Care Unit and the remainder of the shell space is underneath another shell space at level 1 which will also be fitted out as part of the works to provide a new dialysis unit for the hospital. The works will include …
View the procurement »
2013-11-122013.11.12 - 75 Bed Ward Block University Hospital Galway (Health Service Executive (HSE))
A 75-Bed 3 storey Ward Block plus one level of plant, on the grounds of University Hospital Galway, located between Block 2A and the Maternity wing. The proposal includes a link corridor to connect over 3 storeys to Block 2a and at Ground Floor to the existing circulation corridor adjacent to the Maternity wing. The proposal also includes for demolition of a single storey ward, temporary buildings and plant rooms which are being displaced by the proposed Ward Block ground floor plan.
View the procurement »
2012-08-13NUIG/BUILD/017/12; Works Contractor for Clinical/Translational Research Facility (National University of Ireland, Galway (NUI Galway))
The proposed Clinical Research Facility and Translational Research Facility (CRF-TRF) is a four-storey building plus roof level penthouse plant enclosure with a gross floor area of 5,300m². The building has been designed as a hi-technology clinical science research facility. This facility is a joint development of the Health Service Executive and National University of Ireland Galway where sharing of expertise and accommodation including HSE patient casework will inform new strands of clinical …
View the procurement »