2026-04-24Deadline 2026-05-22St Joseph's North East Wing and Gym Block Refurbishment Enabling and Energy Works (Health Service Executive (HSE))
The project is an enabling works package to refurbish the North-East Wing and the adjacent Gym Block / Social Hall at St. Joseph’s Hospital which are both Protected Structures (RPS 3363). This represents the first phase of works to stabilise the building and prepare it for future fit-out, creating modern, fit-for- purpose administrative and clinical accommodation for multiple HSE mental health teams
View the procurement »
2026-04-21Deadline 2026-05-27Multi Disciplinary Design Team Services for the delivery of six (6) additional ICU bed spaces at Beaumont Hospital, Dublin. (Beaumont Hospital_403)
Beaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in patient care, medical education, innovation and research. In addition to providing a wide range of national and regional services, Beaumont Hospital delivers acute care to a population of over 500,000 people within its local catchment area and is host to Centres of Excellence in Neuroscience, Cancer and Renal Transplantation. The Board of Beaumont …
View the procurement »
2026-03-06Marymount Internal Refurbishment Works (Marymount University Hospital and Hospice Ltd.)
The proposed project is a facilities enhancement that will be completed over several phases to improve key areas across the facility, including the lower ground floor atrium, mortuary, catering, and changing room facilities, creating a more functional, welcoming, and efficient environment for staff, visitors, and service users. The serving area will be reconfigured to improve operational flow during peak service times, while the coffee dock will be relocated to a central position within the atrium to …
View the procurement »
2026-02-27HSE EST MW -St Josephs Ennis Pump Upgrade (Health Service Executive (HSE))
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivilant) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved
View the procurement »
2026-02-25HSE EST MW - Pump Upgrade At Nenagh General Hospital (Health Service Executive (HSE))
The project involves the removal of existing pumps, supply and installation of new pumps as per the specification document(or suggestion of equivalent) and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing pumps pre install and survey new pumps at post install to identify savings that will be achieved.
View the procurement »
2025-11-05Construction of a new Electrical Energy Centre (EEC) and associated site development works at UHG Campus. (Health Service Executive (HSE))
The proposed upgrade works include the construction of a new Electrical Energy Centre (EEC) building to support the Temporary Emergency Department, general site development works along with Mechanical and Electrical services works. The associated site infrastructure shall also be upgraded as described in the tender documentation. This includes diversions to the Mechanical and Electrical services as well as the supply and installation of new infrastructure, distribution boards, transformers and cabling …
View the procurement »
2025-09-23Theatre Air Handling Units Upgrade supply, installation and all associated works in St. Josephs Hospital Raheny... (Beaumont Hospital_403)
Beaumont Hospital (i.e., the Contracting Authority) intends to appoint a suitably-qualified and experienced contractor to undertake upgrade works on the Heating, Ventilating and Air-Conditioning system that serves the operating theatre based in the St. Joseph Hospital campus located at Springdale Road Raheny Dublin 5, D05 E261, Ireland, under the management of Beaumont Hospital. The selected contractor shall supply, install, and commission the equipment and entire system mentioned in the scope of work. …
View the procurement »
2025-09-15Rotunda Hospital: Suitability Assessment Questionnaire (SAQ) - Critical Care Wing Enabling Works Contractor as PSCS (The Rotunda Hospital)
Rotunda Hospital plans to develop a new Critical Care Wing on the existing Rotunda Hospital campus. This project will entail the construction of a new 4 storey over basement, 10,000m2 new build acute critical care wing and the refurbishment of approximately 2,000m2 of existing acute hospital facilities within the existing main hospital. The proposed location for the new Critical Care Wing is on the site of the existing single storey outpatient and diagnostics radiology department and the main entrance …
View the procurement »
2025-06-16Construction of a new Electrical Energy Centre (EEC) and associated site development works at UHG Campus. (Health Service Executive (HSE))
The proposed upgrade works include the construction of a new Electrical Energy Centre (EEC) building to support the Temporary Emergency Department, general site developments works along with Mechanical and Electrical services works. The associated site infrastructure shall also be upgraded as described in the SAQ documentation. This includes diversions to the Mechanical and Electrical services as well as the supply and installation of new infrastructure, distribution boards, transformers and cabling for …
View the procurement »
2025-05-30HSE Estates SW: Development and Lease of Kanturk Primary Care Centre (Health Service Executive (HSE))
The Contracting Authority invites submissions in response to the PQQ for the design and delivery of a sustainable primary care centre at the Development Site and the lease of the primary care centre to the HSE. The Procurement Process is being conducted in accordance with the restricted procedure pursuant to EU Directive 2014/24/EU as implemented in Ireland by the Regulations. The Project is being advertised on www.etenders.gov.ie and the Official Journal of the European Union (OJEU).
View the procurement »
2025-05-22St Michaels Unit Refurbishment, Mercy University Hospital (Mercy University Hospital)
St Michael’s Unit (SMU) is a 50 bed acute admission unit for people experiencing Mental Health difficulties located on the 1st floor of the Lee View Block building, Mercy University Hospital, Cork. The unit contains single, double, and multi occupancy rooms. It is a mixed gender unit and is divided into an 18-bed acute ward and a 32-bed sub-acute ward. The facilities in SMU were designed in 2000 and do not meet the needs of a modern service. The current environment is not conducive to the recovery …
View the procurement »
2025-05-22Internal Alteration Works to the existing Occupational Therapy Stores, together with all Associated Site Works at... (Health Service Executive (HSE))
Proposed Internal Alteration Works to the existing HSE Occupational Therapy Stores, Unit 10, MDA Business Park, Mountmellick, Co Laois The removal of the existing steel frame mezzanine structure and lift, removal and replacement of steel frame racking, the provision of structural supports to the existing full height masonry wall between store and office accommodation, alterations to the existing Decontamination area, replacement of fire exit doors and provision of new lighting throughout the store area, …
View the procurement »
2025-05-13HSE EST MW - UHL Lighting Upgrade Project (Health Service Executive (HSE))
The project involves the removal of existing light fittings and supply and installation of LED light fittings as per the specification document (or suggestion of equivalent) and install of PIR sensors in areas, and all associated building and services works, including works contractor and PSCS roles and responsibilities. To survey existing light fitting pre install and survey new LED fittings at post install to identify savings that will be achieved.
View the procurement »
2025-05-12HSE EST MW - Nenagh General Hospital - Electrical Upgrade Works Phase 2_Electrical and Mechanical (Health Service Executive (HSE))
The project comprises the construction of a new electrical substation, inclusive of all necessary civil and structural works to accommodate the installation of a new standby generator system. The scope includes comprehensive enabling works such as site clearance, temporary access provisions, utility diversions, and groundwork preparations. Additionally, all associated builder’s works in connection with the mechanical and electrical installations—such as trenching, ducting, concrete plinths, equipment …
View the procurement »
2025-05-12HSE EST MW - Nenagh General Hospital - Electrical Upgrade Works Phase 2_Construction (Health Service Executive (HSE))
The project comprises the construction of a new electrical substation, inclusive of all necessary civil and structural works to accommodate the installation of a new standby generator system. The scope includes comprehensive enabling works such as site clearance, temporary access provisions, utility diversions, and groundwork preparations. Additionally, all associated builder’s works in connection with the mechanical and electrical installations—such as trenching, ducting, concrete plinths, equipment …
View the procurement »
2025-04-29Child and Adolescent Mental Health Service (CAMHS) Regional Centre and Day Hospital at St Josephs Hospital - Limerick (Health Service Executive (HSE))
The development consists of a new two storey (2,904 m²) building for the Child and Adolescent Mental Health Service (CAMHS), to include entrance foyer, waiting area, assessment, therapy / treatment, and family rooms along with administration areas associated with the Day Hospital and Outpatient Departments, Regional Headquarter office accommodation and all ancillary spaces. Provision of new access road, to tie into existing campus roads infrastructure, 65 no. parking spaces, including 4 no. accessible …
View the procurement »
2025-04-17Estates MW Radiology and MRI expansion project at University Hospital Limerick (Health Service Executive (HSE))
The development consists of: a 701m2 single-storey extension to the Radiology Department overhead at Level 2; the creation of a 730m2 interstitial plantroom floor between the existing and the extension at Level1; a 36m2 new bridge link at Level 2 connecting the extension to the existing building; an 112m2 extensionto the existing MRI building at ground level (level 0); and a stair core connecting the existing Radiology withthe extension along with supporting services, associated site works and associated …
View the procurement »
2025-04-07HSE EST MW - UHL Cancer Care Enabling Works at University Hospital Limerick (Health Service Executive (HSE))
Works consist of the reconfiguration of the internal layout of the Cancer Care Building to provide a new Pre-Assessment Area, new Clinical Rooms, Offices, WCs and Stores. Existing prefabs on the site are to be demolished on completion of the new Pre-Assessment Area. Works areas are divided into two main sections: (i) Works Area A: Refurbishment (ii) Works Area B: Demolitions and Site Preparation Reconfiguration Works will be taking place within a live hospital environment during normal working hours.
View the procurement »
2025-04-04On Call Accommodation 26A Dublin Road, Portlaoise (Health Service Executive (HSE))
The proposed refurbishment of the existing B and B located at 26 A Dublin Road, Portlaoise, to ‘On Call’ Accommodation for Midland Regional Hospital Portlaoise. The refurbishment will consist of proposed new internal layouts, new external plant room, together with all associated site works, all located at 26A Dublin Road, Portlaoise, Co. Laois.
View the procurement »