Beaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in patient care, medical education, innovation and research. In addition to providing a wide range of national and regional services, Beaumont Hospital delivers acute care to a population of over 500,000 people within its local catchment area and is host to Centres of Excellence in Neuroscience, Cancer and Renal Transplantation. The Board of Beaumont Hospital proposes to undertake a programme of works to provide additional Intensive Care Unit (ICU) bed capacity. The project will deliver six additional ICU bed spaces, together with the required ancillary accommodation, through the reconfiguration and refurbishment of existing hospital space. Collectively, these works will strengthen critical care resilience, enhance operational flexibility, and support the safe and sustainable delivery of acute services at Beaumont Hospital. Design Team Services shall be provided across all project stages for both the new six-bed ICU development and the DOSA and Staff facilities Relocation Works. It is proposed to reconfigure an existing area within the Beaumont Hospital campus, currently accommodating the DOSA and staff changing facilities, to deliver six additional ICU bed spaces with associated ancillary accommodation. The proposal utilises the existing floor plate and capitalises on the areaโs close proximity to the current ICU, enabling a timely and cost-effective increase in critical care capacity while minimising disruption to ongoing hospital operations. To facilitate the delivery of the new ICU accommodation, an advance enabling works package will be required to be completed. This enabling package will provide alternative accommodation for the existing Day of Surgery Admission DOSA and staff changing facilities, which must be relocated to accommodate the new ICU unit. In the first instance, a feasibility study shall be undertaken as part of the Design Team Services to identify the most appropriate alternative accommodation within the hospital campus for the relocated DOSA offices and staff changing facilities. This study may include the development of up to three (3) alternative layout options for consideration and approval by the Client. The net floor area of the existing DOSA and Staff Changing Facilities is approximately. 340m2.
Contract notice (2026-04-21) Object Scope of the procurement
Title: Multi Disciplinary Design Team Services for the delivery of six (6) additional ICU bed spaces at Beaumont Hospital, Dublin.
Short description:
โBeaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in...โ
Short description
Beaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in patient care, medical education, innovation and research. In addition to providing a wide range of national and regional services, Beaumont Hospital delivers acute care to a population of over 500,000 people within its local catchment area and is host to Centres of Excellence in Neuroscience, Cancer and Renal Transplantation. The Board of Beaumont Hospital proposes to undertake a programme of works to provide additional Intensive Care Unit (ICU) bed capacity. The project will deliver six additional ICU bed spaces, together with the required ancillary accommodation, through the reconfiguration and refurbishment of existing hospital space. Collectively, these works will strengthen critical care resilience, enhance operational flexibility, and support the safe and sustainable delivery of acute services at Beaumont Hospital. Design Team Services shall be provided across all project stages for both the new six-bed ICU development and the DOSA and Staff facilities Relocation Works. It is proposed to reconfigure an existing area within the Beaumont Hospital campus, currently accommodating the DOSA and staff changing facilities, to deliver six additional ICU bed spaces with associated ancillary accommodation. The proposal utilises the existing floor plate and capitalises on the areaโs close proximity to the current ICU, enabling a timely and cost-effective increase in critical care capacity while minimising disruption to ongoing hospital operations. To facilitate the delivery of the new ICU accommodation, an advance enabling works package will be required to be completed. This enabling package will provide alternative accommodation for the existing Day of Surgery Admission DOSA and staff changing facilities, which must be relocated to accommodate the new ICU unit. In the first instance, a feasibility study shall be undertaken as part of the Design Team Services to identify the most appropriate alternative accommodation within the hospital campus for the relocated DOSA offices and staff changing facilities. This study may include the development of up to three (3) alternative layout options for consideration and approval by the Client. The net floor area of the existing DOSA and Staff Changing Facilities is approximately. 340m2.
Show more
Type of contract: Services
Products/services: Architectural services for buildings๐ฆ
Estimated value excluding VAT: 650 000 EUR ๐ฐ
Description
Description of the procurement:
โBeaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in...โ
Description of the procurement
Beaumont Hospital is the principal teaching hospital for the Royal College of Surgeons in Ireland and has an international reputation for excellence in patient care, medical education, innovation and research. In addition to providing a wide range of national and regional services, Beaumont Hospital delivers acute care to a population of over 500,000 people within its local catchment area and is host to Centres of Excellence in Neuroscience, Cancer and Renal Transplantation. The Board of Beaumont Hospital proposes to undertake a programme of works to provide additional Intensive Care Unit (ICU) bed capacity. The project will deliver six additional ICU bed spaces, together with the required ancillary accommodation, through the reconfiguration and refurbishment of existing hospital space. Collectively, these works will strengthen critical care resilience, enhance operational flexibility, and support the safe and sustainable delivery of acute services at Beaumont Hospital. Design Team Services shall be provided across all project stages for both the new six-bed ICU development and the DOSA and Staff facilities Relocation Works. It is proposed to reconfigure an existing area within the Beaumont Hospital campus, currently accommodating the DOSA and staff changing facilities, to deliver six additional ICU bed spaces with associated ancillary accommodation. The proposal utilises the existing floor plate and capitalises on the areaโs close proximity to the current ICU, enabling a timely and cost-effective increase in critical care capacity while minimising disruption to ongoing hospital operations. To facilitate the delivery of the new ICU accommodation, an advance enabling works package will be required to be completed. This enabling package will provide alternative accommodation for the existing Day of Surgery Admission DOSA and staff changing facilities, which must be relocated to accommodate the new ICU unit. In the first instance, a feasibility study shall be undertaken as part of the Design Team Services to identify the most appropriate alternative accommodation within the hospital campus for the relocated DOSA offices and staff changing facilities. This study may include the development of up to three (3) alternative layout options for consideration and approval by the Client. The net floor area of the existing DOSA and Staff Changing Facilities is approximately. 340m2.
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2026-05-27 12:00:00 ๐
Conditions for opening of tenders: 2026-05-27 12:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=7957311
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180
Contracting authority Name and addresses
Name: Beaumont Hospital_403
National registration number: N/a
Postal address: Beaumont Hospital, Beaumont Road, Dublin 9
Postal code: Dublin 9
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: tendering@beaumont.ie๐ง
Phone: 003531 809 3000๐
Address of the buyer profile: http://www.etenders.gov.ie๐ Type of the contracting authority
Body governed by public law
Main activity
Health
Communication
Documents URL: http:///www.etenders.gov.ie ๐
Participation URL: https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=7957311๐
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Service from which information about the review procedure may be obtained
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2026/S 079-278284 (2026-04-21)