Procurements: Works for complete or part construction and civil engineering work (page 29)

2019-04-29   Request for Tender for the Provision of Service Maintenance and JSP403 Certification at Live Firearms Ranges for An... (An Garda Síochána)
Request for tender for the provision of service, maintenance and JSP403 certification at live firearms ranges for an Garda Síochána. View the procurement »
Mentioned suppliers: General Cabins & Eng
2019-04-29   Extension and Refurbishment to St David’s Holy Faith Secondary School, Greystones, Co. Wicklow – Roll No 61830M –... (St David's Holy Faith Secondary School)
St David’s Holy Faith Secondary School, Greystones, Co. Wicklow – Roll No 61830M – Main Contract Works – New Four-Story Extension (between existing buildings) and standalone PE Facility, together with extensive works to the exiting school and all associated siteworks. The school will remain in full use during the construction works and the contract will involve phasing. The project also includes reserved specialists for both mechanical and electrical installations. These reserved specialists will be … View the procurement »
2019-04-26   Grange Castle West Access Road (South Dublin County Council)
Construction of the Grange Castle West Access Road and Attenuation Pond. View the procurement »
Mentioned suppliers: Clonmel Enterprises Ltd
2019-04-26   Construction of a New 850 Pupil Post Primary School on a Greenfield Site (St. Paul's Secondary School Monasterevin)
Construction of a new 850 pupil post primary school on a greenfield site. The building extends to c. 9 230 m gross floor area over 2 storeys including SENU, multipurpose hall and general purpose hall. Site development works including new access road, major foul and surface water infrastructure, ballcourts and playing pitch works. View the procurement »
2019-04-25   Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works. Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2). This RFI seeks to … View the procurement »
2019-04-25   New 16 Classroom School, St Joseph's National School, Kilcock, Co. Kildare (St. Joseph's National School (Kilcock))
Phased construction project, comprising the construction of new part single storey and part 2-storey school building, approximately 2,905 m, including 16 No. classrooms, 5 No. special education tuition rooms, a multi-purpose room, a library/resource room, a general purpose hall, associated stores, administrative offices, circulation areas and a special needs unit with 2 base classrooms; the demolition of the existing school buildings and all associated site works on a live school site. View the procurement »
2019-04-24   19/087 — Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following: A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11. This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. Please refer to PQQ document for scope of works. View the procurement »
2019-04-24   Electrical Specialist For 2 New Primary Schools at Gaelscoil na Camóige and Gaelscoil Chluain Dolcáin and PE Hall to... (Dublin and Dun Laoghaire Education and Training Board)
Electrical installation for 2 new 3 storey primary school buildings for Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation. The development will also consist of the construction of a new single storey PE Hall building for Coláiste Chilliain. Photovoltaic panels, at roof level are to be provided to the Gaelscoil buildings and to the PE Hall building. View the procurement »
2019-04-24   Mechanical Specialist for 2 New Primary Schools at Gaelscoil na Camóige and Gaelscoil Chluain Dolcáin and PE Hall to... (Dublin and Dun Laoghaire Education and Training Board)
Mechanical installation for 2 new 3-storey primary school buildings for Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation. The development will also consist of the construction of a new single storey PE Hall building for Coláiste Chilliain. Photovoltaic panels, at roof level are to be provided to the Gaelscoil buildings and to the PE Hall building. View the procurement »
2019-04-24   Gaelscoil na Camóige and Gaelscoil Chluain Dolcáin, 2 New Primary School Buildings and New PE Hall at Coláiste Chilliain (Dublin and Dun Laoghaire Education and Training Board)
The development will consist of the construction of 2 new 3 storey Primary school buildings for Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation. The development will also consist of the construction of a new single storey PE Hall building for Coláiste Chilliain. Photovoltaic panels, at roof level are to be provided to the Gaelscoil Buildings and to the PE Hall building. View the procurement »
2019-04-23   N67 Ballinderreen to Kinvara Phase 2 Road Realignment (Galway County Council)
The N67 Ballinderreen to Kinvara Road Realignment Scheme consists of the improvement of approximately 3 km of the N67 National Secondary Road between Ballinderreen and Kinvara. Galway County Council is advancing this road re-alignment, which includes: — approx. 3 km, — re-alignment of 7 side road junctions, — various reconfigured accommodation works accesses, — the scheme comprises of online widening with some sections of off-line construction, — combined Cycletrack and Footway, — various retaining walls. View the procurement »
Mentioned suppliers: Fox Building and Engineering Ltd
2019-04-18   Metocean Buoy Platforms (Marine Institute)
The Marine Institute wishes to put a contract in place for Supply of Metocean Buoy Platforms for the Irish Marine Data Buoy Observation Network under a single supplier framework to run from August 2019 to August 2023. A detailed technical description is available in the attached ITT documentation. View the procurement »
Mentioned suppliers: JFC Manufacturing Co Ltd
2019-04-15   New Development Consisting of 43 No Residential Units, Associated Plant, Services and All Associated Site Development Works (Limerick City and County Council)
New development consisting of 43 No residential units, associated plant, services and all associated site development works in Limerick City, Ireland. View the procurement »
Mentioned suppliers: Glenman Corporation Ltd.
2019-04-10   Establishment of a Multi-Party Framework Agreement for Civil Engineering and Utility Works Contractors for Projects... (University College Dublin (UCD))
UCD are establishing a Multiple Operator Framework for Civil Engineering and Utility Works Contractors for projects in excess of 1 250 000 EUR. The framework agreement will be in operation for 4 years. The indicative works envisaged comprise of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement … View the procurement »
2019-04-04   Hydro Water Control Equipment Maintenance and Overhaul Framework (Electricity Supply Board (ESB))
Hydro water control equipment maintenance and overhaul framework. View the procurement »
2019-04-04   Monaghan Peace Campus — Construction of New 4 Storey Mixed Use Community Building Incorporating Cultural Heritage... (Monaghan County Council)
Construction of new 4 storey mixed use Community Building Incorporating Cultural Heritage Centre (Museum), Library, Youth Facility and Community Hub (approx. 3 400 m), external community space (approx. 2 500 m) and underground parking (127 spaces). Estimated construction cost: 12 000 000 EUR. This project is supported by the European Union’s PEACE IV Programme, managed by the Special EU Programmes Body (SEUPB). View the procurement »
Mentioned suppliers: Felix O'Hare and Co. Ltd
2019-04-03   Fermoy Weir Remediation and Fish Bypass Channel Project (Cork County Council)
Cork County Council wish to carry out remediation works to the existing weir in Fermoy and to construct a new permanent Fish Bypass Channel on the north bank by undertaking the design, tender, construction and handover stages of the Fermoy Weir remediation and Fish Bypass Channel Project in a timely manner, and in scheme that represents best value for money while complying with the relevant standards and statutory requirements. View the procurement »
Mentioned suppliers: T.J. O'Connor and Associates
2019-04-03   Replacement of Studio Floors (Raidio Teilifis Eireann (RTE))
RTÉ invites tenders for the replacement of studio floors in 2 separate lots. Lot 1 is the studio 5 floor totalling 223 m and Lot 2 is the studio 4 floor totalling 626 m. The floors will be high-quality TV floors with a surface hardness, levelness and flatness suitable for modern TV studio requirements including ‘in shot’ camera tracking. Currently the Studio 5 works are programmed for August 2019 with the studio available for 3 weeks. Studio 4 works are planned for 2020 subject to internal RTÉ approval. View the procurement »
Mentioned suppliers: MVOHalloran Ltd
2019-03-29   Environmmental Engineering Consultancy Services (Fingal County Council)
Single party framework for environmental engineering consultancy services to support the specified engineering works programme at Balleally former Landfill (Rogerstown Park). View the procurement »
Mentioned suppliers: Fehily Timoney and Company
2019-03-27   UCD are Setting Up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors (University College Dublin (UCD))
UCD are setting up a Multiple Operator Framework in for Civil Engineering and Utility Works Contractors for large scale contracts.It is envisaged that the scope of works will typically consist of general civil engineering and associated works including site enabling works, the installation and diversion of main drainage systems and utility services, electrical ducting, ESB works, HDPE welded gasmain, HDPE welded Watermain and associated reinstatement works, landscaping works, road, carpark and path … View the procurement »
2019-03-25   Operating and Maintenance Services at 3 Oil Storage Terminals: (1) Tarbert, Co. Kerry, (2) Ringsend, Dublin Port (3)... (National Oil Reserves Agency)
The services comprise the operation and maintenance (O&M) of 3, marine-supplied, terminals that are used for the storage of strategic oil stocks and located at Tarbert, Co Kerry, at Ringsend, Dublin South Port and at Poolbeg, Dublin South Port. View the procurement »
Mentioned suppliers: Zenith Energy Bantry Bay Terminal Ltd
2019-03-22   Social Housing Opportunities in Cork City and Cork County (Túath Housing Association Ltd)
As part of the ongoing growth and development of the association, Túath wishes to engage with experienced residential developers, building contractors and/or landowners or agents acting on their behalf, in connection with the procurement of social housing units within Cork City and County This notice sets out to explore the availability of suitable development opportunities that Túath may procure from the open market on a turnkey acquisition or design and build basis in order to assist in the delivery of … View the procurement »
2019-03-20   N56 Drumbeigh to Inver Road Scheme (Donegal County Council)
Construction of 2,42 km of single lane carriageway split approx. 50/50 between online/offline alignment. The works also include site clearance, fencing, safety barriers, drainage, earthworks, pavements, kerbs and paved areas, road signs and markings, public lighting and electrical work associated therewith, CCTV survey of drains, landscaping, contractor designed structures, accommodation works, services ducts for Utilities and watermain works including temporary diversion. View the procurement »
Mentioned suppliers: Wills Bros Ltd
2019-03-15   Electrical Specialist for Pobailscoil Rosmini (Rosmini Community School), New Post Primary School and PE Hall (Pobalscoil Rosmini (Rosmini Community School))
This project consists of the electrical installation for development at Pobalscoil Rosmini (Rosmini Community School). The development consists of the construction of a new post-primary school of 6 786 m to provide general classrooms, specialised classrooms, PE Hall, general purpose area, a unit for pupils with multiple disability visual impairment, ancillary accommodation. Photovoltaic panels, at roof level are to be provided to the new school building. The development will also consist of the … View the procurement »
2019-03-15   Mechanical Specialist for Pobailscoil Rosmini, (Rosmini Community School), New Post Primary School and PE Hall (Pobalscoil Rosmini (Rosmini Community School))
The development consists of Mechanical installation for development at Pobalscoil Rosmini (Rosmini Community School). The development consists of construction of a new 3-storey post-primary school of 6,786 sqm to provide general classrooms, specialised classrooms, PE Hall, general purpose area, a unit for pupils with multiple disability visual impairment, ancillary accommodation. Photovoltaic panels, at roof level are to be provided to the new school building. The development will also consist of … View the procurement »
2019-03-15   Pobalscoil Rosmini (Rosmini Community School), New Post Primary School with PE Hall (Pobalscoil Rosmini (Rosmini Community School))
The development at Pobalscoil Rosmini (Rosmini Community School), will consist of the construction of a new 3-storey post-primary school of 6,786 sqm to provide general classrooms, specialised classrooms, PE Hall, general purpose area, a unit for pupils with multiple disability visual impairment, ancillary accommodation. Photovoltaic panels, at roof level are to be provided to the new school building. The development will also consist of demolition of the existing post-primary school building, including … View the procurement »
2019-03-15   Additions and Alterations to Existing Community Hall (Carrig and Riverstown Development Association)
The works shall consist of the construction of a single storey extension to the east side of the existing hall, adjust ground levels outside to suit with all ancillary site works and minor works within the existing hall. View the procurement »
2019-03-13   Interpretation Strategy and Visitor Experience Plan for Galway Cultural Tourism Project (Galway City Council)
The services comprise the preparation of: (A) an interpretive design strategy; and (B) a visitor experience plan; (C) detailed exhibition design fitout and installation for the proposed Galway cultural tourism project. View the procurement »
Mentioned suppliers: Haley Sharpe Design Ltd
2019-03-06   WH9601 — Westmeath County Council Framework for Pavement and Associated Minor Works on National Roads (Westmeath County Council)
The Procuring Authority on behalf of Westmeath, Longford and Offaly County Councils wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for Transport Infrastructure Ireland (TII) funded road schemes. The number of works Contracts awarded under the framework in a year is unlikely to exceed 20. Typically, the value of each works contract would approximately range from 100 000 EUR to 1 000 000 EUR. The values and number of works … View the procurement »
2019-03-04   Recording of 600 Historic Structures for National Inventory of Architectural Heritage (Department of Culture, Heritage and the Gaeltacht)
Contract involves recording by way of site visits, description, appraisal, photography, database inputting and map plotting of 600 historic buildings and other features in the northern suburbs of Dublin City. This project is Phase 14 of the Dublin City and Suburbs programme of recording. View the procurement »
Mentioned suppliers: Alastair Coey Architects
2019-03-04   Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works. View the procurement »
Mentioned suppliers: McGinty and O'Shea Ltd
2019-03-01   Electrical Subcontractors (Reserved Specialist to the Main Appointed Contractor) for Electrical Installation for... (Blackwater Community School (Lismore))
Electrical Subcontractors (reserved specialist to the main appointed contractor) for electrical installation for the removal of 2 x No. temporary prefabricated structures, the demolition of an existing 410,6 m single storey post primary school building extension, the demolition of a 148 m single storey services building, the demolition of a 19.6m boiler house and a 9,5 m shed within the curtilage of a structure that is recommended for inclusion on the local authority’s record of protected structures, the … View the procurement »
Mentioned suppliers: CTS Group Waterford
2019-02-25   Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM. The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise: Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the … View the procurement »
2019-02-25   Construction of a Food Innovation and Incubator Hub Campus (BIA Innovator Campus CLG)
Construction of a food innovation and incubator Hub Campus at Mellows, Teagasc Campus, Athenry, Co. Galway. The Campus consists of the construction of 3 separate buildings: Building 1 — BIA EOLAS/BIA OBAIR — construction of a 2 storey Learning Centre (1 200 m Gross Floor Area), Building 2 H.P.S.U. Units — construction of a single storey building (700 m Gross Floor Area), Building 3 — Incubation Units — single storey building (700 m Gross Floor Area) and general site works. View the procurement »
Mentioned suppliers: Glenman Corporation Ltd
2019-02-22   Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold... (Office of Public Works (OPW))
Provision of Temporary Site Services for Stage Hire, Temporary Access, Crowd Control Systems and Bespoke Scaffold Structures for the OPW Event Management Unit. View the procurement »
Mentioned suppliers: Actavo Events (Ireland) Ltd
2019-02-22   Construction of 112 No. Apartments in Blackpool, Cork City (Cluid Housing Association)
The works consist of the construction of 76 No. general needs apartments and 36 No. sheltered apartments for older residents (with communal facilities) at Blackpool, Cork. The apartments are to be constructed on behalf of Clúid Housing Association and will be used as social housing once complete. The apartments are to be constructed in 5 separate blocks. The works include the duties of main contractor and PSCS. The existing site is a brownfield sloping site with an unusual profile. Significant associated … View the procurement »
2019-02-21   Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka. Works will include but are not limited to: — upgrade and reconfigure signalised junctions, — construct new toucan crossings, — install DCC public lighting and CCTV infrastructure, — pavement construction, — granite and concrete paving and kerbing, — retaining walls, — drainage and water main works, — … View the procurement »
Mentioned suppliers: Clonmel Enterprises Ltd
2019-02-21   Clonturk Temporary Accommodation (City of Dublin Education and Training Board)
City of Dublin ETB invites tenders for the construction of 2 storey temporary modular school building and single storey modular changing rooms at Clonturk Community College, Dublin 9. Tenders for 1 or more of the following 3 options only may be submitted at the discretion of tenderers under this open procedure: Option 1: 3 year rental and subsequent removal from site (on basis of 36 monthly payments); Option 2: 3 year rental and subsequent outright purchase by CDETB (on basis of 36 monthly payments and … View the procurement »
2019-02-20   Provision of Water Management Services (St Vincent's University Hospital)
St Vincent’s University Hospital (SVUH) wishes to engage a service provider (the Operator) to provide a complete water management service, including full time technician dedicated to SVUH to be based on site; the facility of a call-out service; and day-works to support the hospital over a 24/7 period with maintenance management system. View the procurement »
Mentioned suppliers: Clearwater Compliance Ltd
2019-02-19   Temporary Event Accommodation Structures to include Marquees, Prefabs/Portable Cabins and Temporary Toilets for the... (Office of Public Works (OPW))
Temporary event accommodation structures to include marquees, prefabs/portable cabins and temporary toilets for the OPW event management unit. View the procurement »
Mentioned suppliers: Eventus
2019-02-18   Proposals for developing social residential schemes in County Wexford, Ireland (Cluid Housing Association)
Clúid hereby invites tenders from experienced housing Developers to submit proposals for developing social residential schemes within the proximity of public services and amenities in accordance with the provisions of this Request for Tenders (‘RFT’). View the procurement »
Mentioned suppliers: Byrne and Byrne Construction (Bunclody) Ltd
2019-02-15   Regional Biosolids Storage Facility — Design Build Contract (Irish Water)
The Contracting Entity plans to construct the following: A new regional biosolids storage facility and associated site infrastructure on an 11 hectare site located on the eastern side of the N2 and within the townland of Newtown, Dublin 11. This is in accordance with Irish Water’s National Wastewater Sludge Management Plan which recommended the development of regional facilities for the storage of biosolids. For full scope of works please refer to PQQ Document. View the procurement »
2019-02-15   It is the Intention of Meath County Council to establish a Multiparty Framework Agreement to undertake Public Realm... (Meath County Council)
It is the intention of Meath County Council to establish a Multiparty Framework Agreement to undertake Public Realm and Civil Engineering Works associated with the Navan Town Centre Plan – Navan 2030. The Framework Agreement will consist of 4 suitably experienced and resourced Civil Engineering Contractors and the framework shall be for a duration of 4 years from appointment. The estimated total value of the works to be procured under the proposed Framework Agreement is circa 15 000 000 EUR. View the procurement »
2019-02-14   Multi-Party Framework Agreement for Bituminous Pavement Works for 2020–2024 (Dublin City Council)
Dublin City Council (DCC) propose to establish and operate a multi-party framework agreement involving roadway resurfacing using bituminous materials (asphaltic concrete, HRA, Clause 942 etc.), road planing, laying of grids, GPR survey, raising/lowering and tying into ironworks and roadmarkings on roadways within the DCC Administrative Area. The Contractor will be responsible for temporary and permanent road marking. Works will also involve the following: roadway repairs (depth will generally not exceed … View the procurement »
Mentioned suppliers: Arkil Ltd Kilsaran Roadsurfacing And Contracting Lagan Asphalt Ltd Roadstone Ltd Siac Bituminous Products Ltd Tarstone tarmacadam Contractors Ltd
2019-02-13   Main Contractor — Development of Office Building at Leeson Lane, Dublin (The Commissioners of Public Works in Ireland)
The development will consist of: 1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445 m in area; 2) The construction of a new 7 storey (over basement) office building of c.6 333 m; 3) Site development works include hard landscaping, boundary treatment and all other ancillary site works. View the procurement »
2019-02-08   Technological University Dublin — Tallaght Campus — Sports Science, Health and Recreation Building Development (Technological University Dublin)
The development will consist of: 1) A Sport Science, Health and Recreation Building containing a single storey sports hall and teaching accommodation and associated facilities arranged over 2 storeys plus roof plant areas, total floor area 3 175 m; 2) A new external landscaped quadrangle, pedestrian areas, footpaths and landscaping, linking existing facilities with the development. Building signage, 56 No. covered bicycle parking spaces, covered walkways and demolition of 46 No. existing car parking … View the procurement »
Mentioned suppliers: ABM Design and Build Ltd
2019-02-05   18-220 Barna GAA Ball Stop and Netting (CLG Bhearna)
Design and supply of ball stops and netting at Barna GAA Grounds, Cloghscoltis, Barna, Co Galway. View the procurement »
2019-02-04   Technological University Dublin — Tallaght Campus — Sports Science, Health and Recreation Building Development (Technological University Dublin)
The development will consist of: 1) A Sport Science, Health and Recreation Building containing a single storey sports hall and teaching accommodation and associated facilities arranged over 2 storeys plus roof plant areas; 2) A new external landscaped quadrangle, pedestrian areas, footpaths and landscaping, linking existing facilities with the development; 3) Enhanced pedestrian crossing facilities at Greenhills Road access, comprising new raised entry treatment across access and pedestrian refuge island. View the procurement »
2019-01-31   COM Cliffs View Cafe (Clare County Council)
10 year lease for Cliffs View Cafe located at the Cliffs of Moher Visitor Centre. View the procurement »
Mentioned suppliers: Brambles
2019-01-31   CIT ARENA (Cork Institute of Technology)
A c. 3 200 m 2-storey multi-purpose sports arena with associated changing, fitness suites, meeting rooms and plant level (approx area 3 344 m) and all associated site and services works. The multi-purpose nature of the facility is designed to include sports events, conferences, exams, exhibitions and concerts. The facility is to be located to the south of the existing running track within the main CIT campus located at Rossa Avenue, Bishopstown, Cork. View the procurement »