2022-04-21Greencastle Breakwater (Donegal County Council)
Donegal County Council is undertaking a joint pre-qualification and tender process to identify a contractor to undertake the construction of the Greencastle Breakwater works.
The following works are included.
• Alterations to the existing breakwater
• Construction of approximately 130m of new breakwater
• Construction of reinforced concrete walkway and wave wall along the length of the entire breakwater
• Installation of ducting, chambers, and lighting
View the procurement »
2022-03-04The extension and refurbishment of the former National School, Kinnegad to accommodate a new Community Library and... (Westmeath County Council)
The extension and refurbishment of the former National School, Kinnegad to accommodate a new Community Library and Education and Training Centre, and Public Realm Enhancement works. The proposed development will include the following:
1. Restoration and adaption of the former National School into a Community Library and Education and Training Centre, including a two-storey rear extension and glazed links to the front and rear;
2. Alterations to the public realm including
Roads and Footpaths;
3. Provision …
View the procurement »
2022-03-03Demolition of Midlands Stations (Electricity Supply Board ( ESB ))
The Contracting Entity intends to procure a contract for the provision of demolition and associated site remediation services at two ESB peat burning plants located at Shannonbridge, Co. Offaly and Lanesborough, Co. Longford.
The contract will be awarded in two Lots,
Lot 1 Demolition and associated site remediation services in Shannonbridge Co. Offaly
Lot 2 Demolition and associated site remediation services in Lanesborough Co. Longford.
The works shall include for the removal of all structures, …
View the procurement »
2022-02-23Louth County Council Peters Hill, Drogheda (Louth County Council)
Removal of car parking and redesign of the space will allow an open area and vista for the protected structures that front onto Peters Hill meeting space with reallocation of existing Blue Badge or wheelchair accessible parking to adjoining streets.
A retaining structure will be constructed to modify the existing gradient to be more suitable for pedestrian space along with provision of areas of soft planting and street tree planting.
View the procurement » Mentioned suppliers:Glas Civil Engineering Ltd
2022-02-04Construction of 84 new residential units at Gort na Glaise, Farganstown, Navan, Co. Meath (Meath County Council)
Construction of 84 no. new residential units to include:
2no. 4-storey Apartment Blocks, 8no. 3-storey Duplex Units, and 10no. 2-storey Semi-Detached Units.
comprising in total:
• 34 no 1 bed Units
• 38 no. 2 bed Units
• 6 no 3 bed Units
• 2 no 3 bed Accessible Units
• 4 no 4 bed Units
External facilities include; roads, public open spaces, parking, landscaping, bin stores, boundary treatments and all required utilities and services.
View the procurement » Mentioned suppliers:Andrews Construction Ltd.
2022-01-06UCD - Framework Agreements for Building Construction Works (University College Dublin ( UCD ))
UCD (and any wholly owned subsidiary thereof), is issuing this Project Information Memorandum and the accompanying Suitability Assessment Questionnaires (SAQ) in order to obtain information from Applicants to determine their suitability on the basis of financial standing, technical competence and capability, and relevant experience to carry out the projects under these two framework agreements. Separate SAQ’s for each of Lots 1and 2 are included in the accompanying documentation. Applicants should only …
View the procurement »
2021-12-16Kerry - Theatre Extension Project, University Hospital Kerry, Tralee (Health Service Executive (HSE))
The development will consist of the construction of a new single-storey rooftop extension to the existing Theatre Department at first floor level, located on the west side of the campus at University Hospital Kerry, to provide an expanded Theatre Department incorporating two new Operating Theatre Suites, a six-bay Recovery Area, support rooms and new Plant Rooms at first and second floor levels, enclosed escape stairway and associated site works.
View the procurement »
2021-11-17Ennis Town Centre Public Realm Regeneration Project B (Clare County Council)
The proposed works represents the second phase of street upgrade works being completed as part of the overall rejuvenation and enhancement programme for Ennis Town Centre. The first phase involved the regeneration of Parnell Street and the extensive network of Lanes and Bow-Ways. This phase, which is funded under the URDF, is scheduled to commence construction in 2022.
View the procurement »
2021-10-05Grange Road to Tramore Valley Pedestrian and Cycle Link (Cork City Council)
The scheme is to provide a pedestrian and cycle link between Grange Road and Tramore Valley Park and includes:
The 5m wide pedestrian/cycle track is to be constructed on a constrained site through the existing woodland requiring site clearance and tree felling.
The pavement will be constructed on earthworks/vegetated and mechanically stabilised embankments along its length.
The N40 pedestrian/cycle overbridge comprises a 2-span steel structure. The main northern bridge span over the dual carriageway …
View the procurement »
2021-09-02Public Lighting Energy Efficiency Project Eastern Region (Kilkenny County Council)
The Client, Kilkenny County Council, acting as the Lead Authority on behalf of
Carlow County Council, Meath County Council, Louth County Council,
Tipperary County Council, Offaly County Council, Kildare County Council,
Wicklow County Council, Westmeath County Council and Kilkenny County
Council, wishes to engage in a process for the establishment of a contract for the
Public Lighting Energy Efficiency Project for Eastern Region.
View the procurement » Mentioned suppliers:KLS ASD JV
2021-05-19Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2021-05-12Apartment Development in Belgard Square North of 133 Units (South Dublin County Council)
Stage 01 of restricted tender for a design and build contractor for new development of 133 apartments at Belgard Square North. The contracting authority will be South Dublin County Council/Approved Housing Body. A minimum number of eight (8) contractors to be short-listed, subject to a sufficient number of pre-qualified applicants.
View the procurement »
2021-05-11N54 Tullybryan Realignment Tullygrimes to Annaghervy, Archaeological Consultancy Services Contract (Stage (I) and (IV) (Monaghan County Council)
The archaeological consultancy services will be required: test excavations and surveys [stage (i)]; pre-excavation services [stage (ii)]; excavation and post-excavation assessment services [stage (iii)]; post-excavation and dissemination [stage (iv)]. The on-site services are to be carried out at between Annaghervy, Drummaconor, Drumacaslan, Annagola, Aghalisk, Kilnahaltar, Tullybryan, Brandrum, Ballyleack, Cornecassa Demesne and Tullygrimes townlands, Co. Monaghan.
The area is shown on the accompanying …
View the procurement »
2021-05-06The Mayfair Library, Abbey Quarter, Kilkenny (Kilkenny County Council)
The renovation and extension of the Mayfair Building on the former Smithwicks Brewery site in Kilkenny City to provide a new Kilkenny City Library including public realm areas with hard and soft landscaping to the areas in front and adjoining the building together with other associated siteworks and drainage.
View the procurement » Mentioned suppliers:Duggan Lynch Ltd
2021-03-26Basement and Parcel 1 Works Package (Limerick 2030 Strategic Development DAC)
Contract B construction consists of the following:
Basement
— the construction of a single level basement of circa 8 000 m which will accommodate 150nr. car parking spaces, plant rooms, stairs and lift cores etc.;
— design and installation of secant pile wall;
— the basement will be common to a number of buildings with common services;
— the basement will incorporate foundations for substructure for other buildings within the development.
Parcel 1: One Opera Square
— One Opera Square will be a 6 story …
View the procurement » Mentioned suppliers:John Sisk & Sons (Holdings) Ltd