2022-05-13Supply of Tea and Coffee Products for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin seeks to appoint a competent supplier to provide Tea, Coffee & Ancillary products for Trinity College Dublin, the University of Dublin
All equipment supplied will be on loan at no additional cost for the term of the contract.
The specifications and requirements are wholly described within the tender document set. Tenders must be submitted via the electronic post-box available on www.etenders.gov.ie by the response deadline.
Only Tenders submitted to the electronic post-box will be …
View the procurement » Mentioned suppliers:Valeo Professional
2022-05-04Retubing Supplies and Services Framework for Edenderry Power Limited (Bord Na Mona)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the supply of boiler retubing for Edenderry Power Limited. The Company intends to establish a Framework Agreement for the provision of these supplies. The Company anticipates awarding up to 3 Tenderers a place on the framework, subject to the quality of responses received. The Framework Agreement period will be for four years with the possibility to extend annually for up to four years subject always …
View the procurement » Mentioned suppliers:Babcock & Wilcox Renewable ServicesBalcke-Dürr GmbHValmet Limited
2022-03-29Request for tenders for the supply, delivery and installation of Engineering Laboratory Equipment in IT Sligo (ITSLIGO)
The Institute of Technology Sligo (IT Sligo) is seeking to procure new laboratory equipment, for educational purposes for the Faculty of Engineering and Design in the fields of Hydraulic Engineering, Wind and Hydro Energy, Thermodynamics, and Fluid Mechanics. This Equipment will be used for training, from novice to expert level. Therefore, it must be easy to use, strongly made, and capable of withstanding rough handling and heavy-duty use. The build quality should provide years of excellent service, with …
View the procurement »
2022-03-25Boiler Cleaning Services Framework for Edenderry Power Limited (Bord Na Mona)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the provision of boiler cleaning services for Edenderry Power Limited. The Company intends to establish a multiple supplier Framework Agreement for the provision of these Services. The Company anticipates awarding up to 3 Tenderers a place on the framework, subject to the quality of responses received. The Framework Agreement period will be for four years with the possibility to extend annually for …
View the procurement »
2020-06-17Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use.
The equipment for sale includes:
• gas turbines,
• gas turbine spares (unused),
• fuel handling plant for solid fuels,
• gas fired boiler,
• solid fuel boilers,
• condensing steam turbines,
• generators,
• transformers,
• associated equipment with above,
• other associated spare parts for above (unused).
Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical.
Interested parties …
View the procurement »
2020-04-17Multi Party Framework for Boiler Replacement Programme 2020-2024 (Dublin City Council)
Dublin City Council (DCC) is seeking to establish a multi-party framework agreement for the procurement of works contractors for the Boiler Replacement Programme in Dublin City Councils housing units in the Dublin City Council Areas marked out as lots 1 to 3. Subject to there being sufficient responses it is envisaged that lot 1 and 2 will each consist of 6 No successful contractors respectively while lot 3 will consist of 10 No successful contractors. Tenderers can apply for inclusion in lot 1 and lot 3 …
View the procurement »
2018-06-06HP1, LP2 and LP3 Feedwater Heater Replacement Lough Ree Power Station (Electricity Supply Board (ESB))
Lough Ree Power is a 100MWe peat fired CFB power plant. Amongst the feed water heaters employed on the water steam cycle are three vertical high pressure (HP) feed water heaters and 3 horizontal low pressure (LP) heaters. ESB plan to replace one of the HP heaters due to flow accelerated corrosion damage to its shell and internal tubing. ESB also plan to replace two LP heaters due to repeated tube leaks also. ESB invites expressions of interest for the design, manufacture, delivery, installation and …
View the procurement »
2017-05-16Boiler Tube Replacement Moneypoint Framework Agreement (Electricity Supply Board (ESB))
ESB invites expressions of interest for the following: Design, manufacture, delivery and installation of Boiler components on the three 305MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Moneypoint Generating Station. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the three are expected to take place during outages in 2018 (two units in series) and in 2019 (one unit). Outage dates may …
View the procurement » Mentioned suppliers:Alstom Ireland Ltd.
2016-06-28Moneypoint SCR Catalyst Regeneration Services (Electricity Supply Board (ESB))
Framework agreement for the supply of Catalyst Regeneration services to ESB Moneypoint to cover the years 2017 to 2019 inclusive. In the period from 2017-2019 ESB foresee a requirement to commence a regeneration program of several of the existing SCR Catalyst Layers. This contract will include for the transport of the Catalyst modules to and from Moneypoint Generating Station, Kilrush, Co. Clare.
View the procurement » Mentioned suppliers:Ebinger Katalysatorservice GmbH & Co. KG
2016-04-16GWM4576 Boiler Tube Replacement Money-point Framework (ESB)
This Framework is for the design, manufacture, delivery and installation of Boiler components on the 3 305-MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Money-point Generating Station — works for each unit are likely to be tendered individually. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the 3 units will take place during outages in 2017, 2018 and 2019. Outage dates may change …
View the procurement »
2015-12-21GWM4277 Moneypoint Unit 2 SCR New Catalyst Layers (ESB)
The contract is for the supply of honeycomb catalyst layers for one 285MWe coal fired boiler at Moneypoint Generating Station. The layers will be installed in a high dust SCR plant. There are two SCR reactors per unit which are situated between the economiser and the airheaters. Each Reactor has three layers of honeycomb catalyst currently installed (Layer 1, 2 and 3), with each Reactor Layer made up of 42 individual catalyst modules comprising a total catalyst volume of approx. 78 m.
View the procurement » Mentioned suppliers:Cormetech Inc.
2015-03-20Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project …
View the procurement »
2013-03-2113/001 - AGI Gas Preheating Systems (Bord Gais Eireann)
BGN require the supply, delivery, installation and commissioning of AGI Gas Pre Heating Systems. At various points on the Natural Gas Network BGN is required to reduce the operating pressure of gas pipelines/supplies. This is achieved using pressure regulators in Above Ground Installations, AGIs. Gas pre-heating systems are required to heat the gas prior to pressure reduction to overcome the Joules-Thompson effect. This is a three (3) year framework agreement with an option to extend for a further period …
View the procurement »
2012-06-27Supply and erecting of a Timber Drying Kiln & Wood Waste Fueled Boiler Plant and Chipper (Irish Pallet Systems Ltd Ballyclare)
Irish Pallet Systems Ltd requires submissions to supply and erect a timber drying kiln and biomass boiler / chipping plant with specification as outlined in Appendix 1 of attached RFT document.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=452832.
The awarding authority has indicated that it will accept electronic responses to this notice via a 'Tender Submission Postbox' …
View the procurement »
2011-05-30PG108T778 Moneypoint SCR New Catalyst Layers (ESB Power Generation)
The contract is for the supply of honeycomb catalyst layers for three 305MWe coal fired boilers at Moneypoint Generating Station. The layers will be installed in a high dust SCR plant. There are two SCR reactors per unit which are situated between the economiser and the airheaters.There are two layers of honeycomb catalyst currently installed in each reactor.
This work is likely to include supply of honeycomb catalysts in the order of 78m3 volume per layer. Two new layers will be required per unit. Also …
View the procurement » Mentioned suppliers:Cormetech, Inc.