2024-01-26   Moorepark Technology Ltd. - Turnkey Gas/LPG Fired Modular Steam Boiler/Generator with Installation (Teagasc - the Agriculture and Food Development Authority)
Teagasc on behalf of Moorepark Technology Ltd. are issuing a request for the tender for the Supply and installation of Turnkey Gas/LPG fired modular Steam Boilers/Generators which allows the replacement of existing boiler with a capacity of 4000 kg/hr steam production which is distributed at 10 bar. See attached documentation for additional information. View the procurement ยป
2022-03-29   Request for tenders for the supply, delivery and installation of Engineering Laboratory Equipment in IT Sligo (ITSLIGO)
The Institute of Technology Sligo (IT Sligo) is seeking to procure new laboratory equipment, for educational purposes for the Faculty of Engineering and Design in the fields of Hydraulic Engineering, Wind and Hydro Energy, Thermodynamics, and Fluid Mechanics. This Equipment will be used for training, from novice to expert level. Therefore, it must be easy to use, strongly made, and capable of withstanding rough handling and heavy-duty use. The build quality should provide years of excellent service, with โ€ฆ View the procurement ยป
2020-06-17   Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use. The equipment for sale includes: โ€ข gas turbines, โ€ข gas turbine spares (unused), โ€ข fuel handling plant for solid fuels, โ€ข gas fired boiler, โ€ข solid fuel boilers, โ€ข condensing steam turbines, โ€ข generators, โ€ข transformers, โ€ข associated equipment with above, โ€ข other associated spare parts for above (unused). Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical. Interested parties โ€ฆ View the procurement ยป
2015-03-20   Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020. To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project โ€ฆ View the procurement ยป
2009-01-21   Laboratory, optical and precision equipments (excl. glasses) (National Institute for Bioprocessing Research & Training (NIBRT))
Title attributed to the contract by the contracting authority: Supply of Cleansteam Generator. The contract comprises the supply and delivery of one (1) Clean Steam Generator/ Skid, with a capacity of up to 300 kg/hr of clean steam at an outlet pressure of 3 barg. (the โ€Goodsโ€). At a minimum, the Goods shall comprise the following: a) Be fabricated from 316 L stainless steel; b) The unit shall be insulated; c) The unit shall allow for automatic blowdown (intermittent); d) The unit shall include a โ€ฆ View the procurement ยป