2022-10-26Lower Shannon Sediment Survey (Office of Public Works (OPW))
The survey shall take place over a reach of approximately 6.7km in the old channel of the River Shannon, between cross-sections 25SHAN08392 and 25SHAN08959 and on the Mulkear from 25KEAR0073 down to the confluence (approx. 0.8km).
The Scope is to capture the topography of the River Shannon and River Mulkear as outlined in the drawings in the Appendix to the Lower Shannon Sediment Survey Specification.
The Scope also includes liaison with the various Relevant Authorities and Landowners and Utility Service …
View the procurement » Mentioned suppliers:Murphy Geospatial Ltd (Formerly Murphy Surveys)
2020-06-23N59 Derradda to Newport Road Project — Archaeological Consultancy Services (Stage [i]-[iv] Services) (Mayo County Council)
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the N59 Derradda to Newport Road Project. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
View the procurement » Mentioned suppliers:TVAS (Ireland) Ltd
2017-06-23Capital Dredging Works at Dublin Port — 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 m³ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month …
View the procurement »
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly …
View the procurement »
2014-07-29Mapping of Underground Utility Services and Structures (National Transport Authority)
The survey works required include mapping of underground utility services and structures, in accordance with the contract drawings provided in Volume 4.4.
The area for which utility survey is required is shown on Drawing No's. 14130-UT-0101 to 14130-UT-0103.
The survey site covers a number of suburban streets, separated into three survey zones. Zones 1 and 2 surveys will be undertaken under a separate contract. Zone 3 has an area of approximate survey area of 14.6 Hectares.
View the procurement » Mentioned suppliers:Murphy Surveys Limited
2014-05-12Topographical Surveying Services (National Transport Authority)
The purpose of the survey is to inform the design process of the Swords to City Centre BRT scheme. The services to be provided include, but are not limited to: - Detailed topographical survey of the site - LiDAR survey of the existing road pavement and footpaths - Detailed topographical survey and elevation surveys of existing structures - Bathymetric Surveying - Mapping of underground utility services using appropriate geophysical techniques, including but not limited to Electromagneting Locating …
View the procurement »
2014-01-2214/003 - Provision of Archaelogical & Ecological Services to Irish Water (Bord Gais Eireann)
Irish Water (IW) is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Archaeological and Ecological Services to support the provision of water services capital investment. It is envisaged that these services will be carried out in a planned manner where work packages are identified in advance of each call off.
The services will be sub-divided into separate Lots detailed below.
— Lot 1: Archaeological Services
— Lot 2: …
View the procurement »
2013-02-01RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of:
1) Planning & Environmental Assessment;
2) Archaeological, Architectural & Cultural Heritage;
3) Hydrology, Hydrogeology & Water Quality;
4) Geotechnical;
5) Noise & Vibration;
6) Landscape & Visual Impact Assessment;
7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ;
8) Shadow Flicker Assessment;
9) …
View the procurement »
2011-10-12Technical specialists in various disciplines (Grangegorman Development Agency)
The Grangegorman Development Authority (GDA) is a statutory agency established in 2006 to redevelop the Grangegorman site in Dublin city centre. The challenge is to plan for and implement a complex, multi-phased development that provides:
— a high quality area with physical linkages to Smithfield, Phibsborough, Prussia Street, and the City Centre,
— new health care facilities for the Health Service Executive (HSE),
— new urban campus for Dublin Institute of Technology (DIT),
— new arts, cultural, …
View the procurement »
2011-02-03Archaeological Services at Thornton Hall (Irish Prison Service)
The Irish Prison Service (IPS) wish to undertake a phase of pre-development archaeological investigations in advance of the construction of the new prison at Thornton Hall, Kilsallaghan, Co Dublin. The results of an extensive series of non-invasive archaeological and architectural surveys, augmented by a phase of testing, previously undertaken as part of the compilation of the Environmental Impact Assessment (EIA) for the proposed works, revealed eight sites of archaeological significance, five of which …
View the procurement »