2022-11-07Newtown School Waterford - Post Primary School Redevelopment -Mechanical Installation (Newtown School)
Mechanical reserved specialists’ role shall consist of the installation, testing and commissioning of all mechanical installations including sub-specialists works associated with the works.
Extension to the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including passenger lift and Special Educational Needs Block (5,339m2), new single storey PE Facility building (1,149m2), new vehicular …
View the procurement »
2022-11-07Newtown School Waterford - Post Primary School Redevelopment -Electrical Installation (Newtown School)
Electrical reserved specialist’s work shall consist of the installation, testing and commissioning of
all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of Phase 1 of the re-development of the
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks
and construction of a new three storey Classroom Block extension including a passenger lift and
single storey Special Educational …
View the procurement »
2022-11-04Newtown School Waterford - Post Primary School Redevelopment -Electrical Installation (Newtown School)
Electrical reserved specialist’s work shall consist of the installation, testing and commissioning of all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of Phase 1 of the re-development of the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including a passenger lift and single storey Special Educational …
View the procurement »
2022-11-02Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements.
Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-11-02Pre-Qualification of Works Contractors for Tyndall North New Facility (University College Cork ( UCC ))
The project consists of the construction of a new circa 17,426m2 research building. The building will be primarily used as a research facility with LV labs, packaging, ULV Labs, bio photonics labs, ancillary labs, meeting rooms, offices, roof top plant enclosure, support service areas and roof terraces. The third, fourth and fifth floor will currently not be fitted out as part of this tender.
The building structure is a concrete frame with lightweight internal walls. The external elevation will consist …
View the procurement »
2022-11-01Schools Energy Pathfinder Design & Build Programme 2023/24 (Limerick and Clare Education and Training Board)
This project is part of continuing series of Pilot Schemes focusing on Schools Energy Upgrades whose objective is to deliver significant improvements works to a two (2) schools during 2023/24 (primarily during school holiday periods). The shared objectives of the programme are to implement a range of energy efficiency measures in a number of typical schools to achieve:
50% reduction in Carbon Emissions
50% reduction in Direct Carbon Emissions
50% reduction in Primary Energy
BER Grade B
Renewable Heat – …
View the procurement »
2022-11-01Works Contract for Devoy Barracks Housing Development (Phase 1) (Land Development Agency)
The Devoy Barracks housing development is a key strategic project located on John Devoy Road, Naas, Co. Kildare, Ireland and forms part of current and future programmes of work to be undertaken by the Contracting Authority to develop affordable sale, cost rental and social housing and apartments.
The development consists of circa 19,650 sqm of accommodation. It will deliver 219 new homes, comprising of a mix of terraced houses, duplexes, apartments, a creche, and all ranging in height from 2 to 5 …
View the procurement »
2022-10-21Reserved Specialist (Electrical) for extension and reconfiguration works at St Francis College, Rochestown, Cork (St. Francis College (Rochestown))
Electrical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for electrical installation for multistorey extension including a PE hall c.7,900m2, with demolition, reconfiguration and refurbishment to the existing school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction.
View the procurement »
2022-10-21Reserved Specialist (Mechanical) for extension and reconfiguration works at St Francis College,Rochestown, Cork (St. Francis College (Rochestown))
Mechanical Subcontractors (Reserved Specialists to the Main Appointed Contractor) for multistorey extension including a PE hall c.7,900m2, with demolition, reconfiguration and refurbishment to the existing school buildings, complete with ballcourts, carparking, roadworks, landscaping and all associated siteworks. The project will be phased, requiring the relocation of existing temporary accommodation and the provision of new temporary accommodation for the duration of construction.
View the procurement »
2022-10-20The Contracting Authority (Connacht Rugby Stadium Ltd.) is seeking to appoint a Works Contractor (on a Design &... (Connacht Rugby Stadium Ltd)
The Redevelopment of the Sportsgrounds, College Road, Galway - Phase 2 – North Stand and High-Performance Centre & Associated External Works generally consists of the following: • Phase 2A - A new High-Performance Centre comprising of a new indoor synthetic training pitch and office accommodation which will incorporate offices and player welfare facilities (canteen, treatment rooms, etc). This new High-Performance Centre is adjacent to the existing Bohermore Cemetery wall which is within the curtilage of …
View the procurement »
2022-10-14Extension and Refurbishment at St.Columba’s College, Stranorlar, Co. Donegal - Reserved Specialist Mechanical (St. Columba's College (Stranorlar))
The proposed project refers to the extension and refurbishment of existing St. Columba’s College, Stranorlar, Co. Donegal. The overall floor area of 10,500 m2 will be accommodated part in new 2-story buildings (7,000 m2) and part in existing 2-story and single story buildings to be retained and refurbished (3,500 m2). A number of existing obsolete standalone blocks and prefabricated units will be demolished (approx. 3.500 m2). The project also includes the provision of new external play areas, the …
View the procurement »
2022-10-14Extension and Refurbishment at St.Columba’s College, Stranorlar, Co. Donegal - Reserved Specialist Electrical (St. Columba's College (Stranorlar))
The proposed project refers to the extension and refurbishment of existing St. Columba’s College, Stranorlar, Co. Donegal. The overall floor area of 10,500 m2 will be accommodated part in new 2-story buildings (7,000 m2) and part in existing 2-story and single story buildings to be retained and refurbished (3,500 m2). A number of existing obsolete standalone blocks and prefabricated units will be demolished (approx. 3.500 m2). The project also includes the provision of new external play areas, the …
View the procurement »
2022-10-06Main Contractor Works Package for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the Works Contract (including other services) for the Old Library Redevelopment Project (OLRP). The project concerns the construction works located at the University’s city centre campus. The contracting Authority intends to invite 6 candidates to tender, please note that the contracting authority reserves the right to invite at least 6, subject to the number qualifying.
View the procurement »
2022-10-05Sligo University Hospital. Medical Beds Department (Health Service Executive (HSE))
The proposed site is near the Out-Patient Department entrance of the hospital on the East side and is accessible from the main circulation concourse of the hospital at all levels. The proposed design creates two 21 bed wards on the first two storeys at Level 3 and Level 4. The beds spaces are all provided in single rooms with two isolation rooms per floor as per Strategy for the control of Antimicrobial Resistance in Ireland (SARI) guidelines with all necessary ancillary accommodation self-contained on …
View the procurement »
2022-09-29Lift Specialist - National Children's Science Centre (Office of Public Works (OPW))
The refurbishment and restoration of the existing north and part of the east wing of the existing National Concert Hall and Real Tennis building and the construction of a new 4 storey over basement extension with a planetarium dome, the construction of an underground link tunnel with a glazed box roof light, new substation, switch room and bicycle storage and changing area. Total floor area of the development is approx. 9 224sqm.
The demolition of: existing 2 storey stone workshop building, plant area …
View the procurement »
2022-09-29Electrical Specialist - National Children's Science Centre (Office of Public Works (OPW))
The refurbishment and restoration of the existing north and part of the east wing of the existing National Concert Hall and Real Tennis building and the construction of a new 4 storey over basement extension with a planetarium dome, the construction of an underground link tunnel with a glazed box roof light, new substation, switch room and bicycle storage and changing area. Total floor area of the development is approx. 9 224sqm.
The demolition of: existing 2 storey stone workshop building, plant area …
View the procurement »
2022-09-29Mechanical Specialist - National Children's Science Centre (Office of Public Works (OPW))
The refurbishment and restoration of the existing north and part of the east wing of the existing National Concert Hall and Real Tennis building and the construction of a new 4 storey over basement extension with a planetarium dome, the construction of an underground link tunnel with a glazed box roof light, new substation, switch room and bicycle storage and changing area. Total floor area of the development is approx. 9 224sqm.
The demolition of: existing 2 storey stone workshop building, plant area …
View the procurement »
2022-09-28ATU Galway City (Atlantic Technological University)
The Contracting Authority ATU Galway City wishes award a contract under the open procedure for a Turnkey Design and Install Upgrade works package to include Furniture & POD fit-out with Electrical Services Upgrade, Flooring Upgrade and painting works to the upper floor of 2003 Building based on the ATU, Dublin Road, Galway City Campus. Please refer to the attached documentation for further details.
View the procurement »
2022-09-27Biomass - St. Anne’s Primary School, Kilcarrig Ave, Fettercairn, Dublin 24 (St. Anne's Primary School)
Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in …
View the procurement »
2022-09-02Lift Specialist - Archival Repository Project (Office of Public Works (OPW))
The proposed development at the warehouse of the National Archives of Ireland, Dublin 8, comprising approx. gross floor area of 5,200m2, consists of the construction of ground and new first floor archive repository accommodation and circulation areas, with climate control and fire protection. Construction will take place within the existing warehouse walls and roof. The existing floor slab will be removed and replaced by new foundations and floor slab at finished floor level of the existing ground floor. …
View the procurement »
2022-09-02Electrical Specialist - Archival Repository Project (Office of Public Works (OPW))
The proposed development at the warehouse of the National Archives of Ireland, Dublin 8, comprising approx. gross floor area of 5,200m2, consists of the construction of ground and new first floor archive repository accommodation and circulation areas, with climate control and fire protection. Construction will take place within the existing warehouse walls and roof. The existing floor slab will be removed and replaced by new foundations and floor slab at finished floor level of the existing ground floor. …
View the procurement »
2022-09-02Mechanical Specialist - Archival Repository Project (Office of Public Works (OPW))
The proposed development at the warehouse of the National Archives of Ireland, Dublin 8, comprising approx. gross floor area of 5,200m2, consists of the construction of ground and new first floor archive repository accommodation and circulation areas, with climate control and fire protection. Construction will take place within the existing warehouse walls and roof. The existing floor slab will be removed and replaced by new foundations and floor slab at finished floor level of the existing ground floor. …
View the procurement »
2022-08-24Mechanical Sub-Contract Works, New Build Construction of a 25 Class Primary School with an 8 Class Special Needs... (Scoil Iosagain (Buncrana))
Mechanical Sub-Contract
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 sequential Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks)
Reserved Specialists for the Mechanical and Electrical Services Installations are …
View the procurement »
2022-08-24Electrical Sub-Contract Works, New Build Construction of a 25 Class Primary School with an 8 Class Special Needs... (Scoil Iosagain (Buncrana))
Electrical Sub-Contract Works:
Demolition of existing Sacred Heart and St. Columba`s School buildings, relocation and removal of temporary buildings, construction of a new build 2-storey 25 classroom Primary School incorporating 8 classrooms for Special Needs. The new building of 6335m2 GFA shall be constructed in 2 sequential Phases with a third Phase for construction of 3 hard ball courts, car parking and associated siteworks)
Reserved Specialists for the Mechanical and Electrical Services …
View the procurement »
2022-08-08FRAMEWORK COMPETITION FOR PROVISION OF MECHANICAL MAINTENANCE AND ASSOCIATED WORKS (St Vincent's University Hospital)
This is a single operator framework with a maximum of one (1) economic operator. The scores allocated to the First Works Contract will rank tenderers. Only the number one ranked tenderer will be appointed to the framework.
The First Works Contract project includes mechanical maintenance works as detailed in Appendix 1_M01-2022 Volume A Part 2 Site Specific Requirements and Appendix 2_M01-2022 Volume A Part 1 Asset Register Schedule & Planned Maintenance Requirements v.4 within St. Vincent’s University Hospital.
View the procurement »
2022-07-28Energy Meter Data Capture and Meter Data Processing Solution with Support and Maintenance (EirGrid plc)
The objective of this PQQ process is to produce a short-list of suitably qualified Candidates who will be invited to tender for the provision of an Energy Meter Data Capture and Meter Data Processing Solution and the Support and Maintenance of same. Energy Meter Data is collected from transmission connected Generators, Interconnectors and Tie Line flow meters, and the SCADA system, and used by EirGrid and SONI for the purpose of Settlement and as Meter Data Provider obligations under the I-SEM Trading …
View the procurement »