Electrical reserved specialistโs work shall consist of the installation, testing and commissioning of all electrical installations including sub-specialists works associated with the works. The main contract works comprise the construction of Phase 1 of the re-development of the existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including a passenger lift and single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures. The project will be completed and handed over on a phased basis.
Deadline
The time limit for receipt of tenders was 2022-12-06.
The procurement was published on 2022-11-07.
Contract notice (2022-11-07) Object Scope of the procurement
Title: Electrical installation work
Reference number: 16015 Elect
Short description:
Electrical reserved specialistโs work shall consist of the installation, testing and commissioning of
all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of Phase 1 of the re-development of the
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks
and construction of a new three storey Classroom Block extension including a passenger lift and
single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility
building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new
substation and construction store, together with associated landscaping and external works. All
within the curtilage of two Protected Structures. The project will be completed and handed over on
a phased basis.
Electrical reserved specialistโs work shall consist of the installation, testing and commissioning of
all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of Phase 1 of the re-development of the
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks
and construction of a new three storey Classroom Block extension including a passenger lift and
single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility
building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new
substation and construction store, together with associated landscaping and external works. All
within the curtilage of two Protected Structures. The project will be completed and handed over on
a phased basis.
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Electrical installation work๐ฆ
Additional CPV: Electrical installation work๐ฆ Place of performance
NUTS region: Southern
๐๏ธ
Procedure
Procedure type: Restricted procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
Reserved specialists shall be pre-selected for Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.
Reserved specialists shall be pre-selected for Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.
Object Scope of the procurement
Short description:
Electrical reserved specialistโs work shall consist of the installation, testing and commissioning of
all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of Phase 1 of the re-development of the
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks
and construction of a new three storey Classroom Block extension including a passenger lift and
single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility
building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new
substation and construction store, together with associated landscaping and external works. All
within the curtilage of two Protected Structures. The project will be completed and handed over on
a phased basis.
Estimated total value: 15 500 000 EUR ๐ฐ
Short description:
Electrical reserved specialistโs work shall consist of the installation, testing and commissioning of all electrical installations including sub-specialists works associated with the works.
The main contract works comprise the construction of the re-development of the
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including a passenger lift and single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new
existing historic Newtown School campus involving demolition of 5 no. existing classroom blocks and construction of a new three storey Classroom Block extension including a passenger lift and single storey Special Educational Needs Block (approx. 5,400m2), new single storey PE Facility building (approx. 1,150m2), new vehicular entrance, car parking, boundary wall realignment, new
substation and construction store, together with associated landscaping and external works. All within the curtilage of two Protected Structures. The project will be completed and handed over on a phased basis.
Reserved specialists shall be pre-selected for Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.
Reserved specialists shall be pre-selected for Electrical Installations, directly and separately tendered by the Contracting Authority for appointment by the main contractor upon award of the main contract. Reserved Specialists will be required to execute a Collateral Warranty with the Employer.
Place of performance
Main site or place of performance: Newtown School, Co. Waterford
Legal, economic, financial and technical information Conditions for participation
Suitability to pursue the professional activity:
As DoES-QW4 Suitability Assessment Questionnaire and Declaration โ Reserved Specialists, For use with Public Works Contract โ CF1 (Restricted Procedure).
A declaration is required to confirm that none of the circumstances specified Article 57 of Directive 2014/24/EU (and Regulation 57 of SI No. 284 of 2016) or Article 80 of Directive 2014/25/EU (and Regulation 85 of SI No.286 of 2016) apply to the applicant
A declaration is required to confirm that none of the circumstances specified Article 57 of Directive 2014/24/EU (and Regulation 57 of SI No. 284 of 2016) or Article 80 of Directive 2014/25/EU (and Regulation 85 of SI No.286 of 2016) apply to the applicant
As DoES-QW4 Suitability Assessment Questionnaire and Declaration โ Reserved Specialists, For use with Public Works Contract โ CF1 (Restricted Procedure).
Procedure
Legal basis: 32014L0024
Envisaged number of candidates: 8
Objective criteria for choosing the limited number of candidates: Suitability Assessment Questionnaire
Time of receipt of tenders: 17:00
Date of dispatch of invitations: 2023-03-06 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
The envisaged number of operators to be short-listed to tender is as stated at 11.2.9 above. All applicants have an equal suitability assessment score to the lowest qualifying candidate will also be deemed to be qualified.
Candidates will be prequalified on the basis of the information submitted in response to this notice (All criteria have a minimum standard). The submission of the apparently successful applicants will be validated prior to completing the short-list.
Where a candidate having qualified for the short-list withdraws prior to the completion of the tender process or is subsequently found to have provided inaccurate information sufficient to justify exclusion (at any stage after the short-list is formed), the competition will proceed with the remaining number of candidates. Applicants who failed to be short-listed will not be subsequently added to the list.
Where a candidate having qualified for the short-list withdraws prior to the completion of the tender process or is subsequently found to have provided inaccurate information sufficient to justify exclusion (at any stage after the short-list is formed), the competition will proceed with the remaining number of candidates. Applicants who failed to be short-listed will not be subsequently added to the list.
The contract will be awarded on the basis of the most economically advantageous tender.
The works requirements may be extended to include additional works of a similar nature at the discretion of the contracting authority. All additional works requirements are subject to the restrictions as set out in Article 72 of Directive 2014/24/EC (Regulation 72,SI 284 of 2016). The successful applicant will enter into a contract with the successful Main Contractor.
The works requirements may be extended to include additional works of a similar nature at the discretion of the contracting authority. All additional works requirements are subject to the restrictions as set out in Article 72 of Directive 2014/24/EC (Regulation 72,SI 284 of 2016). The successful applicant will enter into a contract with the successful Main Contractor.
The project categorisation for assessment of H&S competence as Works Contractor and PCSC is Major Works.
The areas of work involving Particular risks known ti contracting authority at this time are: falling from a height- construction of a three storey classroom block.
Expressions of interest or tender competitions have been or are being conducted separately for: none.
It is a condition precedent to the award of the contract that the successful tenderer will provide a current tax clearance certificate or in the case of a non-resident contractor a statement of suitability on tax grounds from the Revenue Commissions of Ireland.
It is a condition precedent to the award of the contract that the successful tenderer will provide a current tax clearance certificate or in the case of a non-resident contractor a statement of suitability on tax grounds from the Revenue Commissions of Ireland.
The funding Agency, the Department of Education and Skills is subject to the requirements of the Freedom of Information Acts, 1997, 2003 and 2014. If a candidate considers that any of the information supplied in response to this notice is either commercially sensitive confidential, this should be highlighted and reasons for its sensitively given. The relevant material will, in response to a request under the Act, be examined in the light of exemptions provided for in the Act.
The funding Agency, the Department of Education and Skills is subject to the requirements of the Freedom of Information Acts, 1997, 2003 and 2014. If a candidate considers that any of the information supplied in response to this notice is either commercially sensitive confidential, this should be highlighted and reasons for its sensitively given. The relevant material will, in response to a request under the Act, be examined in the light of exemptions provided for in the Act.
Complementary information Review body
Name: Department of Education and Skills
Postal town: Portlaoise Road, Tullamore
Country: Ireland ๐ฎ๐ช
Source: OJS 2022/S 218-623847 (2022-11-07)