Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
Deadline
The time limit for receipt of tenders was 2022-10-28.
The procurement was published on 2022-09-27.
Object Scope of the procurement
Title:
โBiomass - St. Anneโs Primary School, Kilcarrig Ave, Fettercairn, Dublin 24
St Anne's - Pathfinder Projectโ
Products/services: Boiler installation work๐ฆ
Short description:
โFull upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of...โ
Short description
Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
Show more
Estimated value excluding VAT: EUR 170 000 ๐ฐ
Full upgrade of the existing heating system with the integration of a new biomass unit 215KW. The supplier shall allow for the delivery and manufacture of plant. The supplier shall a prefabricated containerised biomass wood pellet boiler installation in compliance with Architects drawings & specification and M&E drawings and specification. Connection into the existing LTHW heating system installation. Biomass boiler will act as primary boiler with natural gas boiler installation as assist and backup in event of failure/downtime of biomass boiler (including all necessary control configuration) Supply and sale of heat/fuel to school for set contract period in the form of wood pellet fuel and operation of the heating biomass boiler for 15 years
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 170 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 9
Legal, economic, financial and technical information Economic and financial standing
Selection criteria as stated in the procurement documents
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2022-10-28
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tender must be valid until: 2022-12-11 ๐
Conditions for opening of tenders: 2022-12-11
12:00 ๐
Complementary information Review body
Name: AFEC International
Postal address: 13 Hand Park
Postal town: Swords
Postal code: K56 XV83
Country: Ireland ๐ฎ๐ช
Phone: +353 87108260๐
E-mail: carl.gahan@afec.ie๐ง
URL: WWW.AFEC.IE๐
Source: OJS 2022/S 189-531334 (2022-09-27)