2023-10-23   GWM14870 Framework Agreement to Complete Generator Rotor Removal, Inspection, Electrical Testing and... (Electricity Supply Board ESB)
GWM14870 Framework Agreement for Contractor/Service Provider to provide Resources/Manpower, Tooling and Test Equipment to Complete Generator Rotor Removal, Inspection, Electrical Testing and Generator/Turbine Realignment of Two Hydro Units at Electricity Supply Board (ESB) Ardnacrusha Generating Station Located in the Republic of Ireland. View the procurement »
2023-08-22   8498 - Corporate Power Purchase Agreement for Iarnród Éireann (Iarnrod Eireann-Irish Rail)
Call to competition by Iarnród Éireann (IÉ) for the procurement of financially-settled renewable electricity and the associated guarantee of origin certificates (GOs) via a newly built offsite corporate power purchase agreement (CPPA) View the procurement »
2023-05-15   Consultancy Services for Single Point of Contact (Renewable Energy) for SEAI (Sustainable Energy Authority of Ireland)
The objective of this RFT is to invite proposals from suitably qualified service providers to research the role of the Single Point of Contact (Renewable Energy) as defined by existing and upcoming EU legislation and examine how this role might best add value to the licensing and permitting system and contribute towards the achievement of the overall aim, which is to speed up the deployment of energy from renewable sources. The final deliverable from this service will be a suite of detailed options for … View the procurement »
2023-04-04   Environmental Assessment of Services for the Review of the National Ports Policy (Department of Transport)
Strategic Environmental Assessment (SEA) Services, Appropriate Assessment (AA) Services and Strategic Flood Risk Assessment (SFRA) Services for The Review of National Ports Policy incorporating the Policy Statement on the facilitation of Offshore Renewable Energy by Commercial Ports in Ireland . View the procurement »
2022-11-23   Provision of a Framework Agreement for Civil Works Balance of Plant (CBOP) to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from suitably qualified candidates for inclusion on a Framework Agreement for Civil Works Balance of Plant (CBOP) for a significant pipeline of wind development projects. Please find attached our expression of interest document (in PDF and Word format) which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-11-04   Rosslare Europort Offshore Renewable Energy Hub Project (ORE) Phases 3 and 4 Consultancy (Iarnrod Eireann-Irish Rail)
Deliver consultancy services for the Rosslare Europort Offshore Renewable Energy Hub project View the procurement »
2022-11-02   Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-07-13   FW Supply & Delivery Wind Turbine Components Ireland 1228 (SSE Renewables Wind Farms (Ireland) Limited)
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
2022-06-28   Grant Making Organisation for Community Benefit Funds for the Island of Ireland (Electricity Supply Board ( ESB ))
ESB seeks to award a contract for provision of Community Benefit Funds for all renewable projects. View the procurement »
Mentioned suppliers: SECAD Partnership CLG
2022-05-17   MTU SPARES (Irish Naval Service)
The Irish Naval Service seeks tenders from economic operators for the supply of Original Equipment Manufacturer (OEM) Parts to enable the INS carry out the servicing and routine maintenance of the twelve (12) MTU Diesel Engines fitted onboard four Naval Service vessels. View the procurement »
Mentioned suppliers: AVK SEG LUK LTD
2022-04-14   The Irish Defence Forces Corps of Engineers requires generator sets suitable for expeditionary deployments as part... (Irish Defence Forces)
The Irish Defence Forces Corps of Engineers requires generator sets suitable for expeditionary deployments as part of self-sustaining military camp infrastructure that will provide a power generation facility to a 600 person camp where no power grid or pre-existing electrical infrastructure is in place. The generators (and associated equipment) will be required to meet a variety of standards as laid down by the Defence Forces Corps of Engineers. The generator sets required must be able to withstand the … View the procurement »
Mentioned suppliers: Electrogen Int. Ltd
2022-03-28   Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots): 1. Land Identification and Mapping 2. Land Agency Services 3. Turbine Delivery Route Assessment 4, Declaration of Identity Services 5. Other Land Based Services Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements. View the procurement »
2022-03-02   Civil Balance of Plant for Derrinlough Wind Farm (Bord Na Mona)
The Company intends to procure to procure works, supplies and design and build services related to the civil balance of plant for the Derrinlough Wind Farm project. The Company plans to develop the project commencing in 2022. The scope of work for Contract shall include the design, procurement, and installation. Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice for further information on the scope and tender process. View the procurement »
Mentioned suppliers: Bam Civil Limited
2021-12-17   Expression of interest for an Innovative Partnership Process between FuturEnergy Ireland and Candidate Long Duration... (FuturEnergy Ireland Development DAC)
The purpose of this pre-qualification questionnaire is to identify suitably qualified technology providers developing long duration storage technologies with the potential to cost effectively solve grid congestion and system integration challenges on a power system with up to 80% renewables (primarily wind energy). The ultimate aim / ambition of this process is the deployment of at least 500MW of 12-100hr storage on the Irish power system by 2030. Please find pre-qualification questionnaire attached with … View the procurement »
2021-12-17   Inclusion on a Framework Agreement for provision of legal services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland (the “Contracting Entity”) are seeking to invite suitably qualified firms who are interested in participating in this competition for inclusion on a Framework Agreement regarding the provision legal services. The core scope of services required from the selected candidate(s) will include, but is not limited, to the items set out in the Pre-Qualification Questionnaire (PQQ) attached to this notice. Please note that the services are categorised into four lots. Candidates may apply for … View the procurement »
2021-11-10   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Mentioned suppliers: Vestas
2021-10-11   Provision of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm – Coillte CGA (Coillte CGA)
Coillte invites expressions of interest from suitable candidates in respect of Electrical Works Balance of Plant (EBOP) & Grid Works for a Utility Scale Wind Farm. Please refer to the expression of interest document (PQQ) attached for further details on requirements. Please also note that this document must be completed and returned by the deadline cited. View the procurement »
2021-10-07   Provision of Civil Works Balance of Plant (CBOP) for a Utility Scale Wind Farm – Coillte CGA (Coillte CGA)
Coillte CGA invite expressions of interest from suitably qualified candidates in respect of Civil Works Balance of Plant (CBOP) for a Utility Scale Wind Farm. Please refer to the expression of interest document (PQQ) attached for further details on requirements. Please also note that this document must be completed and returned by the deadline cited. View the procurement »
2021-09-27   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-03-04   Civil Balance of Plant for Derryadd Wind Farm (Bord Na Mona)
The company intends to procure to procure works, supplies and design and build services related to civil balance of plant for the Derryadd wind farm project. The company plans to develop the project commencing in 2021. The scope of work for contract shall include the design, procurement and installation. View the procurement »
2021-01-21   Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
2020-08-05   DPS for the Provision of Goods and Services for Energy and Climate Action Consultancy Projects and for the Provision... (3 Counties Energy Agency)
The 3 Counties Energy Agency (‘3CEA’) (the ‘Contracting Authority’) is issuing this request for applications to participate (‘RFATP’) in a Dynamic Purchasing System (‘DPS’) on its own behalf and on behalf of other agencies and public bodies such as SEAI Sustainable Energy Communities, members of the Association of Irish Energy Agencies (AIEA), One-Stop-Shops under the aegis of the National Retrofit Delivery Body, local authorities and LEADER companies. The DPS will be coordinated and managed by the 3CEA. View the procurement »
2020-06-17   Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use. The equipment for sale includes: • gas turbines, • gas turbine spares (unused), • fuel handling plant for solid fuels, • gas fired boiler, • solid fuel boilers, • condensing steam turbines, • generators, • transformers, • associated equipment with above, • other associated spare parts for above (unused). Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical. Interested parties … View the procurement »
2020-05-29   Inclusion on a Framework Agreement for Provision of Grid Services to Coillte’s Renewable Energy Business (Coillte CGA)
Coillte wishes to appoint a framework of grid consultants to provide advice and support related to the grid connection, substation design, electrical balance of plant (EBOP) and civil balance of plant (CBOP) of various renewable energy and energy storage projects, and associated electrical infrastructure. To this end we now invite suitably qualified candidates to express an interest in this competition in respect of the areas of expertise (lots) outlined in the summary document attached. Please note that … View the procurement »
2020-05-27   Service and Availability Agreements for ESB Windfarms in Ireland and UK (Electricity Supply Board (ESB))
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
2020-05-26   Framework Agreement for Provision of Lidar Equipment to Coillte CGA (Coillte CGA)
Coillte CGA invites tenders for provision of LIDAR equipment as per the tender document attached to this notice. The objective of this tender competition is to: A. appoint successful candidate(s) to a framework agreement for LiDAR wind measurement equipment requirements going forward for the life of the framework; and B. purchase three initial LiDAR wind measurement devices that meet the technical criteria outlined in the tender document attached. View the procurement »
2020-05-04   OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
2020-04-01   Provision of Corporate Finance Advisory Services for Coillte’s Renewable Energy Business (Coillte CGA)
Coillte CGA (Coillte or the Company) invites expressions of interest in respect of a tender process which it expects to commence in April 2020 for the provision of corporate finance advisory services for its Renewable Energy Business, as described in the summary document attached. View the procurement »
2019-11-25   Wind Turbines Supply for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
Mentioned suppliers: Nordex Energy Ireland
2019-11-22   Inclusion on a Wind Energy Framework Agreement for Provision of Environmental and Planning Services to Coillte CGA (Coillte CGA)
Coillte CGA invites expressions of interest from suitably qualified candidates for inclusion on a wind energy framework agreement for environmental and planning services. Please find attached a summary document which provides further details of our requirements and instructions to candidates. Interested parties must complete the pre-qualification questionnaire attached to this notice and take note of the deadline for receipt of submissions. View the procurement »
2019-06-12   Provision of Environmental and Planning Services for Ballynagree Wind Farm (Coillte CGA)
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached. Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition. View the procurement »
2019-01-17   Integrated 150kW EV Charge Station Supporting Simultaneous Operation of Multiple Power Outlets Via Modular Power Units (Electricity Supply Board (ESB))
Supply integrated 150kW EV charge station supporting simultaneous operation of multiple power outlets via modular power units. View the procurement »
Mentioned suppliers: Delta Electronics (Netherlands) BV
2019-01-17   1) Integrated (Power Components and User Interface Required to be as a Single Unit) EV Charge Station Supporting 50... (Electricity Supply Board (ESB))
1) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 50 kW outlets via CHAdeMO/CCS and 43kW AC outlets; 2) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 25 kW outlets via CHAdeMO/CCS outlet. View the procurement »
Mentioned suppliers: ABB LTD Delta Electronics (Netherlands) BV Efacec Electric Mobility, S.A. Tokheim Ireland Ltd
2018-11-21   Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2018-10-17   Community Services for Renewable Energy Participation/Investment Models (Coillte CGA)
Coillte are seeking expressions of interest from suitably qualified community development advisors to lead the delivery of a number of objectives as set out in the summary document attached. Please also find attached a pre-qualification questionnaire document which will need to be completed by the deadline date stated, It is our intention to use a competitive dialogue procedure for this tender competition. View the procurement »
2018-10-16   Supply, Installation and Commissioning of Wind Turbines for Cloncreen Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates for the supply, installation and commissioning of 21 wind turbines and a long term (min 5 years) services and maintenance agreement for Cloncreen Wind Farm. View the procurement »
Mentioned suppliers: Vestas
2018-08-22   Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in … View the procurement »
2018-05-03   EV Ultra-Fast Charge Point Units (Electricity Supply Board (ESB))
The contracting entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 350kW capacity including associated equipment and services to be delivered in Ireland. These frameworks will not include installation of equipment. Lot 1 – Ultra fast charge points including greater than 100Kw and up to 350Kw dedicated output to CCS and Chademo. Lot 2 – Ultra fast charge points up to 160Kw simultaneous output to CCS and Chademo. Lot 3 – Ultra fast charge … View the procurement »
Mentioned suppliers: ABB LTD Efacec Electric Mobility, S.A.
2018-04-20   EV Charge Points Units up to circa 50kW (Electricity Supply Board (ESB))
The Contracting Entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 50kW capacity including associated equipment and services to be delivered in Ireland. View the procurement »
Mentioned suppliers: Ecotech e.U. Efacec Electric Mobility, S.A.
2018-04-06   Expression of interest in respect of EPC and O&M Services for Battery Energy Storage Systems (Coillte CGA)
Coillte CGA are seeking expressions of interest in respect of EPC and O&M services for Battery energy storage systems. Please find attached an expression of interest document and pre-qualification questionnaire which provides further detail on requirements. View the procurement »
2018-03-23   Soliciting interest to invest in Coillte’s portfolio of recently commissioned operating wind farms (Coillte CGA)
Coillte CGA is inviting potential investors to bring forward proposals for: A— the acquisition of the majority of the equity of Coillte’s share of 4 operating wind farms, in total reflecting 104 MW on a net equity basis (240 MW gross) of operating capacity, and B— the potential future acquisition of 2 projects currently in final planning review, representing 67.5 MW on a net equity ownership basis (90 MW gross), upon achieving either financial close or commercial operations. Coillte reserves the right to … View the procurement »
2018-02-06   Supply of Aircraft Fixed Electrical Ground Power Equipment - Cork and Dublin Airports (daa plc)
The Contracting Authority wishes to appoint a Suppliers to manufacture and supply Fixed Electrical Ground Power (FEGP) convertors and associated equipment on a non-exclusive basis to Cork and Dublin Airports for a five (5) year period with an option to extend for a further two (2) years. View the procurement »
Mentioned suppliers: ITW GSE ApS
2017-11-28   Framework Agreement for provision of renewable energy consultancy technical services (Coillte CGA)
Coillte CGA invite tenders for the provision of renewable energy consultancy technical services in respect of three lots. Please find tender documents attached with full details of requirements set out. View the procurement »
2017-10-18   Supply of an Ignition Quality Tester for the University of Limerick (Education Procurement Service (EPS))
Dear Tenderers, The Education Procurement Service (EPS) on behalf of the University of Limerick (the ‘Contracting Authority’) invites tenders (‘Tenders’) to this request for tenders (‘RFT’) from economic operators (‘Tenderers’) for the Supply of an Ignition Quality Tester for the University of Limerick. Kind regards, EPS Team. View the procurement »
2017-10-11   Request for Tender for provision and service of wind measuring met technologies to Coillte CGA (Coillte CGA)
Coillte invites suitable candidates to tender for provision and service of wind measuring met technologies to Coillte CGA under a Framework Agreement. Please find attached tender documentation and take note of the deadline for receipt of tenders. View the procurement »
2017-09-08   Dublin Airport Static Inverter Upgrade (daa plc)
Please see RFT which is available to download at www.etenders.gov.ie View the procurement »
2016-07-04   Expression of interest in respect of Grid Connection Works Contract for Cullenagh Wind Farm (Coillte Teoranta)
Coilllte invites expressions of interest from suitable candidates to express an interest in grid connection works in respect of its Cullenagh Wind Farm. Please find attached an Expression of Interest Document which details a summary of requirements and a Pre-Qualification Questionnaire for completion. View the procurement »
2016-06-09   Independent Condition Assessment / Statutory Inspections — ESB Wind Farms (Electricity Supply Board and/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
Frameworks for: 1. Independent Condition Assessment Services. 2. Statutory Inspections. for ESB Wind Farms on the islands of Ireland and Great Britain. View the procurement »
2015-05-06   Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document; 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »