2023-05-15Consultancy Services for Single Point of Contact (Renewable Energy) for SEAI (Sustainable Energy Authority of Ireland)
The objective of this RFT is to invite proposals from suitably qualified service providers to research the role of the Single Point of Contact (Renewable Energy) as defined by existing and upcoming EU legislation and examine how this role might best add value to the licensing and permitting system and contribute towards the achievement of the overall aim, which is to speed up the deployment of energy from renewable sources. The final deliverable from this service will be a suite of detailed options for …
View the procurement »
2022-11-23Provision of a Framework Agreement for Civil Works Balance of Plant (CBOP) to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from suitably qualified candidates for inclusion on a Framework Agreement for Civil Works Balance of Plant (CBOP) for a significant pipeline of wind development projects. Please find attached our expression of interest document (in PDF and Word format) which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-11-02Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements.
Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-05-17MTU SPARES (Irish Naval Service)
The Irish Naval Service seeks tenders from economic operators for the supply of Original Equipment Manufacturer (OEM) Parts to enable the INS carry out the servicing and routine maintenance of the twelve (12) MTU Diesel Engines fitted onboard four Naval Service vessels.
View the procurement » Mentioned suppliers:AVK SEG LUK LTD
2022-04-14The Irish Defence Forces Corps of Engineers requires generator sets suitable for expeditionary deployments as part... (Irish Defence Forces)
The Irish Defence Forces Corps of Engineers requires generator sets suitable for expeditionary deployments as part of self-sustaining military camp infrastructure that will provide a power generation facility to a 600 person camp where no power grid or pre-existing electrical infrastructure is in place. The generators (and associated equipment) will be required to meet a variety of standards as laid down by the Defence Forces Corps of Engineers. The generator sets required must be able to withstand the …
View the procurement » Mentioned suppliers:Electrogen Int. Ltd
2022-03-28Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots):
1. Land Identification and Mapping
2. Land Agency Services
3. Turbine Delivery Route Assessment
4, Declaration of Identity Services
5. Other Land Based Services
Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements.
View the procurement »
2022-03-02Civil Balance of Plant for Derrinlough Wind Farm (Bord Na Mona)
The Company intends to procure to procure works, supplies and design and build services related to the civil balance of plant for the Derrinlough Wind Farm project. The Company plans to develop the project commencing in 2022. The scope of work for Contract shall include the design, procurement, and installation. Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice for further information on the scope and tender process.
View the procurement » Mentioned suppliers:Bam Civil Limited
2021-12-17Inclusion on a Framework Agreement for provision of legal services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland (the “Contracting Entity”) are seeking to invite suitably qualified firms who are interested in participating in this competition for inclusion on a Framework Agreement regarding the provision legal services.
The core scope of services required from the selected candidate(s) will include, but is not limited, to the items set out in the Pre-Qualification Questionnaire (PQQ) attached to this notice. Please note that the services are categorised into four lots. Candidates may apply for …
View the procurement »
2021-11-10Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following …
View the procurement » Mentioned suppliers:Vestas
2021-09-27Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following …
View the procurement »
2021-03-04Civil Balance of Plant for Derryadd Wind Farm (Bord Na Mona)
The company intends to procure to procure works, supplies and design and build services related to civil balance of plant for the Derryadd wind farm project.
The company plans to develop the project commencing in 2021. The scope of work for contract shall include the design, procurement and installation.
View the procurement »
2021-01-21Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme …
View the procurement »
2020-08-05DPS for the Provision of Goods and Services for Energy and Climate Action Consultancy Projects and for the Provision... (3 Counties Energy Agency)
The 3 Counties Energy Agency (‘3CEA’) (the ‘Contracting Authority’) is issuing this request for applications to participate (‘RFATP’) in a Dynamic Purchasing System (‘DPS’) on its own behalf and on behalf of other agencies and public bodies such as SEAI Sustainable Energy Communities, members of the Association of Irish Energy Agencies (AIEA), One-Stop-Shops under the aegis of the National Retrofit Delivery Body, local authorities and LEADER companies. The DPS will be coordinated and managed by the 3CEA.
View the procurement »
2020-06-17Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use.
The equipment for sale includes:
• gas turbines,
• gas turbine spares (unused),
• fuel handling plant for solid fuels,
• gas fired boiler,
• solid fuel boilers,
• condensing steam turbines,
• generators,
• transformers,
• associated equipment with above,
• other associated spare parts for above (unused).
Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical.
Interested parties …
View the procurement »
2020-05-29Inclusion on a Framework Agreement for Provision of Grid Services to Coillte’s Renewable Energy Business (Coillte CGA)
Coillte wishes to appoint a framework of grid consultants to provide advice and support related to the grid connection, substation design, electrical balance of plant (EBOP) and civil balance of plant (CBOP) of various renewable energy and energy storage projects, and associated electrical infrastructure. To this end we now invite suitably qualified candidates to express an interest in this competition in respect of the areas of expertise (lots) outlined in the summary document attached. Please note that …
View the procurement »
2020-05-26Framework Agreement for Provision of Lidar Equipment to Coillte CGA (Coillte CGA)
Coillte CGA invites tenders for provision of LIDAR equipment as per the tender document attached to this notice.
The objective of this tender competition is to:
A. appoint successful candidate(s) to a framework agreement for LiDAR wind measurement equipment requirements going forward for the life of the framework; and
B. purchase three initial LiDAR wind measurement devices that meet the technical criteria outlined in the tender document attached.
View the procurement »
2020-05-04OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following:
• complete manufacture and supply of entire WTG system;
• transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment;
• design of foundation loadings;
• installation of WTG, commissioning of WTG;
• potential …
View the procurement »
2019-11-22Inclusion on a Wind Energy Framework Agreement for Provision of Environmental and Planning Services to Coillte CGA (Coillte CGA)
Coillte CGA invites expressions of interest from suitably qualified candidates for inclusion on a wind energy framework agreement for environmental and planning services. Please find attached a summary document which provides further details of our requirements and instructions to candidates.
Interested parties must complete the pre-qualification questionnaire attached to this notice and take note of the deadline for receipt of submissions.
View the procurement »
2019-06-12Provision of Environmental and Planning Services for Ballynagree Wind Farm (Coillte CGA)
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached.
Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition.
View the procurement »
2018-10-17Community Services for Renewable Energy Participation/Investment Models (Coillte CGA)
Coillte are seeking expressions of interest from suitably qualified community development advisors to lead the delivery of a number of objectives as set out in the summary document attached.
Please also find attached a pre-qualification questionnaire document which will need to be completed by the deadline date stated,
It is our intention to use a competitive dialogue procedure for this tender competition.
View the procurement »
2018-08-22Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in …
View the procurement »
2018-05-03EV Ultra-Fast Charge Point Units (Electricity Supply Board (ESB))
The contracting entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 350kW capacity including associated equipment and services to be delivered in Ireland.
These frameworks will not include installation of equipment.
Lot 1 – Ultra fast charge points including greater than 100Kw and up to 350Kw dedicated output to CCS and Chademo.
Lot 2 – Ultra fast charge points up to 160Kw simultaneous output to CCS and Chademo.
Lot 3 – Ultra fast charge …
View the procurement » Mentioned suppliers:ABB LTDEfacec Electric Mobility, S.A.
2018-03-23Soliciting interest to invest in Coillte’s portfolio of recently commissioned operating wind farms (Coillte CGA)
Coillte CGA is inviting potential investors to bring forward proposals for:
A— the acquisition of the majority of the equity of Coillte’s share of 4 operating wind farms, in total reflecting 104 MW on a net equity basis (240 MW gross) of operating capacity, and
B— the potential future acquisition of 2 projects currently in final planning review, representing 67.5 MW on a net equity ownership basis (90 MW gross), upon achieving either financial close or commercial operations.
Coillte reserves the right to …
View the procurement »
2015-05-06Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »