2021-05-11N54 Tullybryan Realignment Tullygrimes to Annaghervy, Archaeological Consultancy Services Contract (Stage (I) and (IV) (Monaghan County Council)
The archaeological consultancy services will be required: test excavations and surveys [stage (i)]; pre-excavation services [stage (ii)]; excavation and post-excavation assessment services [stage (iii)]; post-excavation and dissemination [stage (iv)]. The on-site services are to be carried out at between Annaghervy, Drummaconor, Drumacaslan, Annagola, Aghalisk, Kilnahaltar, Tullybryan, Brandrum, Ballyleack, Cornecassa Demesne and Tullygrimes townlands, Co. Monaghan.
The area is shown on the accompanying …
View the procurement »
2020-06-23N59 Derradda to Newport Road Project — Archaeological Consultancy Services (Stage [i]-[iv] Services) (Mayo County Council)
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the N59 Derradda to Newport Road Project. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
View the procurement » Mentioned suppliers:TVAS (Ireland) Ltd
2017-06-23Capital Dredging Works at Dublin Port — 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 m³ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month …
View the procurement »
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly …
View the procurement »
2014-10-02East West Interconnector (EWIC) — Marine Survey 2015 (EirGrid plc)
EirGrid is seeking a provider to perform a marine survey next year (2015) to determine the condition of the recently laid EWIC cables. The marine segment of the EWIC system is 187 km in length. The scope of services required are specified below in Section 3. The Contractor shall have the total responsibility for performing all activities necessary to complete the services, including management, engineering, survey operation and deliverables in accordance with the requirements of the Contract.
View the procurement » Mentioned suppliers:Osiris Projects
2014-02-28ENQEIR399 - EWIC Marine Survey (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who will be invited to tender for a Marine Survey for the Project.
EirGrid is seeking a provider to perform a marine survey this year (2014) to determine the condition of the 2011/12 laid EWIC cables. EWIC runs between Deeside in north Wales and Woodland, County Meath in Ireland, the marine segment being 187km in length. The Contractor shall have the total responsibility for …
View the procurement »
2014-01-2214/003 - Provision of Archaelogical & Ecological Services to Irish Water (Bord Gais Eireann)
Irish Water (IW) is requesting tenders to establish a multi-supplier framework agreement for the provision of all required works and services associated with Archaeological and Ecological Services to support the provision of water services capital investment. It is envisaged that these services will be carried out in a planned manner where work packages are identified in advance of each call off.
The services will be sub-divided into separate Lots detailed below.
— Lot 1: Archaeological Services
— Lot 2: …
View the procurement »
2013-12-09ENQEIR392 – Ireland France Interconnector Project Marine Survey (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who will be invited to tender for a Marine Survey for the Project.
RTE is the French Transmission System Operator (TSO).
The two national Transmission System Operators, EirGrid plc and RTE, have recently signed a Memorandum of Understanding to commission further preliminary studies on the feasibility of building a submarine electricity interconnector between Ireland and France …
View the procurement »
2013-02-01RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of:
1) Planning & Environmental Assessment;
2) Archaeological, Architectural & Cultural Heritage;
3) Hydrology, Hydrogeology & Water Quality;
4) Geotechnical;
5) Noise & Vibration;
6) Landscape & Visual Impact Assessment;
7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ;
8) Shadow Flicker Assessment;
9) …
View the procurement »
2011-10-12Technical specialists in various disciplines (Grangegorman Development Agency)
The Grangegorman Development Authority (GDA) is a statutory agency established in 2006 to redevelop the Grangegorman site in Dublin city centre. The challenge is to plan for and implement a complex, multi-phased development that provides:
— a high quality area with physical linkages to Smithfield, Phibsborough, Prussia Street, and the City Centre,
— new health care facilities for the Health Service Executive (HSE),
— new urban campus for Dublin Institute of Technology (DIT),
— new arts, cultural, …
View the procurement »
2011-02-03Archaeological Services at Thornton Hall (Irish Prison Service)
The Irish Prison Service (IPS) wish to undertake a phase of pre-development archaeological investigations in advance of the construction of the new prison at Thornton Hall, Kilsallaghan, Co Dublin. The results of an extensive series of non-invasive archaeological and architectural surveys, augmented by a phase of testing, previously undertaken as part of the compilation of the Environmental Impact Assessment (EIA) for the proposed works, revealed eight sites of archaeological significance, five of which …
View the procurement »