2023-05-29UNG ESTATE BAILE AN TSAGAIRT – INFRASTRUCTURE UPGRADE WORKS (Údarás Na Gaeltachta_289)
Eastát Baile an tSagairt is a business park located in An Spidéal, Co. na Gaillimhe. The existing parking and infrastructure within the estate requires upgrades to meet the current and proposed demands of the tenants. The works also include realigning the main access to Eastát Baile an tSagairt from the L53955 local road, new Northern Car Park (55 spaces), new Southern Car Park (21 Spaces), installation of EV car charging points to meet future demands, remedial works to the electrical infrastructure, …
View the procurement »
2021-08-06Tallaght Stadium - Construction of New North Stand & Renovations to West and South Stands (South Dublin County Council)
Construction of proposed new spectator stand at north end of Tallaght Stadium, offices and shop, refurbishment and alterations to the existing West stand, upgrades of accessible seating and new changing places toilet to the existing South stand, and all associated site & development works:
Tallaght Stadium - Construction of new 2,500 seater North Stand with retail areas; extensive internal renovations and media area to the West Stand; adjustments to the disabled seating to the South Stand; including …
View the procurement » Mentioned suppliers:ABM Design & Build Ltd
2021-05-19Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2020-11-05New Student Centre (Completion Contract) (University of Limerick)
The new student centre comprises the construction of a three storey over partial basement student centre, floor area approximately 3 600 m, providing a foyer space, auditorium (150 seat), meeting rooms, offices, a shop and coffee dock, along with new landscape paving and external works including enclosed bicycle shelters.
View the procurement »
2020-09-01N56 Four Lane Road Safety Improvement Scheme (Donegal County Council)
The scheme involves improvement to 1.4 km of the existing N56 Four Lane Road in Letterkenny, Co. Donegal. The scheme upgrades an existing four lane road to an urban dual carriageway. The N56 Four Lane Road is in close proximity to the Lough Swilly SAC. This road is the main traffic artery to Letterkenny with an approximately 32 000 vehicles daily. The main element of the works includes items such as; road and junction works, kerbs, footway and cycleway works, structural flood protection and cycleway …
View the procurement » Mentioned suppliers:Fox Contracts
2020-02-05Enniscorthy Flood Defence Scheme – River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; …
View the procurement »
2018-07-24Works Contractors for UCC Health Innovation Hub for Building Works Design by the Contractor PW-CF2 (University College Cork (UCC))
The project consists of the construction of a new circa 3 750 m building consisting of a ground floor, first floor, second floor and third floor. The building is going to be primarily used as an open plan business innovation space with limited cellular offices on ground to second floors. The second floor North wing and the third floor will not be fitted out as part of these works The building is a concrete frame with RC/block work walls and an architectural precast concrete cladding external wall finish. …
View the procurement »
2018-07-20Ringsend WwTP — Phosphorus Fixation Contract (Irish Water)
The Ringsend WwTP treats most of the wastewater arising in the Greater Dublin Area. Irish Water is currently planning an upgrade to the Ringsend Treatment Plant based on the application of aerobic granular sludge technology (Nereda®) which will provide for nutrient removal, including Enhanced Biological Phosphorus Removal (EBPR). The introduction of aerobic granular sludge and EBNR will be carried out in phased upgrades of the Ringsend plant, with the aim (inter alia) of reducing the Phosphorus (P) …
View the procurement » Mentioned suppliers:Murphy International Ltd
2017-02-21Ringsend WwTP Retrofit Contract Stage 1 (Irish Water)
Ringsend Wastewater Treatment Plant (WwTP) treats most of the wastewater arising in the Greater Dublin Area. Irish Water is inviting tenders for a contract which will comprise the upgrading and retrofitting of between 8 and 11 of the upper deck tanks, and an aerobic granular sludge (AGS) biological treatment process (the Works) for which the Contracting Entity has already procured the proprietary Nereda® process.
Please refer to the PQQ for further details.
View the procurement »
2012-12-21Upper Liffey Valley Regional Sewerage Scheme - Contract No 1 - Osberstown WWTP Upgrade (Kildare County Council)
The contract consists of the expansion and upgrade of the
existing Osberstown waste water and sludge treatment
facility from a population equivalent of 80 000 to 130 000
while maintaining the existing operations and treatment
standards.
The Contracting Authority has determined their
requirements in respect of the treatment process and
general site layout. The Contractor will be required to
assume design responsibility for the Contracting Authority's
selected solution, complete the design, and then …
View the procurement »
2012-02-22Beaufort Maritime & Energy Research Laboratory (University College Cork (UCC))
The works will consist of the development of the new Beaufort Maritime & Energy Research Laboratory having a total floor area of 5,132 m2, demolition of existing warehouse, construction of access road and ancillary site development works, located on a site adjoining the National Maritime College of Ireland (NMCI).
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=370852.
View the procurement »
2012-02-02Cobh Landslides Project: Phase 2 (Cobh Town Council)
Cobh Town Council, as Contracting Authority and Employer, requires the services of a competent Consulting Engineer, with experience of Geotechnical Engineering Works related to Soil and Slope Stability, and the Structural Stability of Retaining Structures in environments similar to those found in Cobh, County Cork, Ireland.
All of the proposed works are located within the administrative area of Cobh Town Council.
The purpose of the project is the protection from landslides and wall collapses of people …
View the procurement » Mentioned suppliers:Malachy Walsh And Partners