2018-07-02   CNG โ€” Design Build Framework Contract (Ervia)
Multi-supplier Framework Agreement for Design Build and Maintenance of CNG stations including full project life cycle from preliminary design through to construction and commissioning, roles of PSDP and PSCS and handover of the completed station to GNI. Scope includes supply, delivery and installation of fast fill CNG filling station with compressors, high pressure storage and dispensers. Supplier to provide 24 hrs per day, 365 days per year remote support and provision of scheduled and demand โ€ฆ View the procurement ยป
2015-08-27   Enabling Works Contractor and as Project Supervisor for the Construction Stage (PSCS) for a contract for Enabling... (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of: โ€” The demolition of all buildings on the site of the new children's hospital; โ€” Construction of a new children's hospital building and associated helipad; โ€” A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below; โ€” Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps โ€ฆ View the procurement ยป
2015-08-27   Works Specialists with Design Input for the new childrenโ€˜s hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of: โ€” The demolition of all buildings on the site of the new children's hospital; โ€” Construction of a new children's hospital building and associated helipad; โ€” A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below; โ€” Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps โ€ฆ View the procurement ยป
2014-03-21   Tranche 2 Service Areas on the National Roads Network (National Roads Authority)
Tranche 2 Service Areas on the National Roads Network is a PPP Contract (the 'Contract') and is intended to comprise the design, construction, operation, maintenance and financing of two service areas (M6 Athlone & M9 Kilcullen) on the national roads network. The Contract may also include the fit-out and operation of a further service area on the M11 (Gorey), once constructed. The design and construction elements of the Contract are currently intended to comprise (in particular, but without limitation) โ€ฆ View the procurement ยป
2011-05-06   Tranche 2 service areas on the national roads network (National Roads Authority (NRA))
Tranche 2 service areas on the national roads network is a PPP Contract (the "Contract") and is intended to comprise the design, construction, operation, maintenance and financing of two service areas (M6 Athlone & M9 Kilcullen) on the national roads network. The Contract may also include the fit-out and operation of a further service area on the M11 (Gorey), once constructed. The design and construction elements of the Contract are currently intended to comprise (in particular, but without limitation) โ€ฆ View the procurement ยป
2005-09-30   Construction work for highways, roads (National Roads Authority)
Portlaoise Motorway PPP Contract. The Portlaoise Motorway PPP Contract (the "PPP Project") is intended to comprise the design, construction, financing, operation and maintenance (see further detail below regarding the extent of operation and maintenance element) of approximately 41km of standard 2-lane motorway, approximately 3km of single carriageway link roads, approximately 15 km of side roads, 3 grade separated junctions and a Motorway to Motorway Interchange, including a toll collection system, (the โ€ฆ View the procurement ยป