2022-11-02Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements.
Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-03-28Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots):
1. Land Identification and Mapping
2. Land Agency Services
3. Turbine Delivery Route Assessment
4, Declaration of Identity Services
5. Other Land Based Services
Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements.
View the procurement »
2021-11-10Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following …
View the procurement » Mentioned suppliers:Vestas
2021-09-27Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following …
View the procurement »
2021-01-21Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme …
View the procurement »
2020-05-26Framework Agreement for Provision of Lidar Equipment to Coillte CGA (Coillte CGA)
Coillte CGA invites tenders for provision of LIDAR equipment as per the tender document attached to this notice.
The objective of this tender competition is to:
A. appoint successful candidate(s) to a framework agreement for LiDAR wind measurement equipment requirements going forward for the life of the framework; and
B. purchase three initial LiDAR wind measurement devices that meet the technical criteria outlined in the tender document attached.
View the procurement »
2020-05-04OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following:
• complete manufacture and supply of entire WTG system;
• transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment;
• design of foundation loadings;
• installation of WTG, commissioning of WTG;
• potential …
View the procurement »
2014-12-03Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire.
Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions.
View the procurement »
2014-02-19SC 02/14 OPL - Supply, erection and commissioning of wind turbines for Oweninny Wind Farm (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Owenniny Power Limited. The Joint Venture parties are Bord Na Mona Energy Limited and ESB Wind Development Limited. Expressions of interest are invited from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Oweninny Wind Farm.
Oweninny Wind Farm Phase 1 and Phase 2 will have circa 172 MW capacity.
A long term (minimum 5 years) services and maintenance agreement …
View the procurement »
2013-12-12Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of Interest document.
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-08-02RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms.
The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot.
Details of each Lot as follows:
Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. …
View the procurement »
2012-12-19PG108T829 Raheenleagh Wind Turbines (ESB &/or its Subsidiaries & Joint Venture Partnerships (hereinafter referred to as ESB))
It is ESBs intention to award this contract through a Joint Venture company. ESBs Joint Venture Partner is Coillte.
ESB invites expressions of interest from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Raheenleagh Wind Farm. A long term (minimum 2 years) services and maintenance agreement also forms part of the scope of supply.
Proposals for assistance in funding the project may also be requested.
ESB will use the negotiated …
View the procurement »
2012-06-29IDA 500KW wind turbine supply and installation project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth.
The successful Applicant will be appointed as the supply and installation Contractor of a 500KW wind turbine at the IDA Business Park, Mullagharlin, Dundalk, with responsibility to procure, install, commission and complete the Works in accordance with the Works Requirements. The wind turbine must comply with IEC Class 11A and Class 111A. The supply and installation contractor will be novated to …
View the procurement »
2012-06-29IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth.
The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at …
View the procurement »
2012-05-21FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational …
View the procurement »