2022-11-02   Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-07-13   FW Supply & Delivery Wind Turbine Components Ireland 1228 (SSE Renewables Wind Farms (Ireland) Limited)
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
2022-03-28   Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots): 1. Land Identification and Mapping 2. Land Agency Services 3. Turbine Delivery Route Assessment 4, Declaration of Identity Services 5. Other Land Based Services Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements. View the procurement »
2021-11-10   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Mentioned suppliers: Vestas
2021-09-27   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-01-21   Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
2020-05-27   Service and Availability Agreements for ESB Windfarms in Ireland and UK (Electricity Supply Board (ESB))
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
2020-05-26   Framework Agreement for Provision of Lidar Equipment to Coillte CGA (Coillte CGA)
Coillte CGA invites tenders for provision of LIDAR equipment as per the tender document attached to this notice. The objective of this tender competition is to: A. appoint successful candidate(s) to a framework agreement for LiDAR wind measurement equipment requirements going forward for the life of the framework; and B. purchase three initial LiDAR wind measurement devices that meet the technical criteria outlined in the tender document attached. View the procurement »
2020-05-04   OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
2019-11-25   Wind Turbines Supply for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
Mentioned suppliers: Nordex Energy Ireland
2018-11-21   Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2018-10-16   Supply, Installation and Commissioning of Wind Turbines for Cloncreen Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates for the supply, installation and commissioning of 21 wind turbines and a long term (min 5 years) services and maintenance agreement for Cloncreen Wind Farm. View the procurement »
Mentioned suppliers: Vestas
2017-11-28   Framework Agreement for provision of renewable energy consultancy technical services (Coillte CGA)
Coillte CGA invite tenders for the provision of renewable energy consultancy technical services in respect of three lots. Please find tender documents attached with full details of requirements set out. View the procurement »
2016-06-09   Independent Condition Assessment / Statutory Inspections — ESB Wind Farms (Electricity Supply Board and/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
Frameworks for: 1. Independent Condition Assessment Services. 2. Statutory Inspections. for ESB Wind Farms on the islands of Ireland and Great Britain. View the procurement »
2014-12-03   Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
2014-05-09   PG108T909 – ESB Wind Turbines & Long Term Services & Availability Framework (ESB &/or its Subsidiaries, Associates & Joint Venture Partnerships (hereinafter referred to as ESB))
ESB plans to develop circa 12 wind farms (up to circa 300 MW – with the potential that this may extend to 500 MW – in aggregate) in the period from Q2, 2015 to Q4, 2019. The potential scale of these individual windfarm developments is that they are expected to typically range between 15 MW & 50 MW. There is the potential that certain individual windfarm developments may be up to 100MW. This call for competition is to establish a framework agreement. The scope of supply is the supply, erection and … View the procurement »
Mentioned suppliers: Nordex Energy Ireland Limited Siemens Limited Vestas Ireland Ltd
2014-02-19   SC 02/14 OPL - Supply, erection and commissioning of wind turbines for Oweninny Wind Farm (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Owenniny Power Limited. The Joint Venture parties are Bord Na Mona Energy Limited and ESB Wind Development Limited. Expressions of interest are invited from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Oweninny Wind Farm. Oweninny Wind Farm Phase 1 and Phase 2 will have circa 172 MW capacity. A long term (minimum 5 years) services and maintenance agreement … View the procurement »
2013-12-12   Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2013-08-02   RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
2012-12-19   PG108T829 Raheenleagh Wind Turbines (ESB &/or its Subsidiaries & Joint Venture Partnerships (hereinafter referred to as ESB))
It is ESBs intention to award this contract through a Joint Venture company. ESBs Joint Venture Partner is Coillte. ESB invites expressions of interest from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Raheenleagh Wind Farm. A long term (minimum 2 years) services and maintenance agreement also forms part of the scope of supply. Proposals for assistance in funding the project may also be requested. ESB will use the negotiated … View the procurement »
2012-06-29   IDA 500KW wind turbine supply and installation project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the supply and installation Contractor of a 500KW wind turbine at the IDA Business Park, Mullagharlin, Dundalk, with responsibility to procure, install, commission and complete the Works in accordance with the Works Requirements. The wind turbine must comply with IEC Class 11A and Class 111A. The supply and installation contractor will be novated to … View the procurement »
2012-06-29   IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at … View the procurement »
2012-05-21   FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational … View the procurement »
2012-03-01   Provision of a Wind Turbine Service and Availability contract for one windfarm: Four Gamesa G52 0.85MW wind turbines... (ESB International)
ESBI is seeking tenders for the provision of a Wind Turbine Service and Availability contrcat for four Gamesa G52 0.85MW wind turbines in Ireland. View the procurement »
Mentioned suppliers: Gamesa Ireland Limited
2011-03-03   Multi supplier framework for wind turbine contracts relating to bord gais wind farm developments (Bord Gais Eireann)
The anticipated scope applicable to the framework includes but is not limited to the following works: — Wind turbine generator supply and commission including associated turbine electrical works and SCADA system. The client may also require any one or combination of, the following additional services under the framework. — Wind turbine foundation design, — Wind turbine foundation construction including concrete bases, excavation to suitable formation level and build up to the required level, — Complete … View the procurement »
Mentioned suppliers: Enercon Gmbh Gamesa Eolica S.L.U. Nordex Uk Ltd Siemens Ltd Vestas