2023-03-03Hazardous Waste Disposal Service (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of competent contractors for the provision of Hazardous Waste Disposal Services.
The requirement is split into Lots:
Lot 1 – Container collections by lorry (IBCs, barrels, etc.) also to include contaminated soil removal
Lot 2 – Tanker Truck services which covers:
• Aqueous solution services by tanker truck (coolant, waste oil, oily water from interceptors, tank cleanings) & 24 hour response
• Sewage services by tanker truck (biocycle units, septic tanks, train …
View the procurement »
2019-03-04Douglas FRS_Douglas Works Package (Cork County Council)
Construction of flood defence works in Douglas and environs. The proposed works are described in the drawings and specifications. Works will include the construction of new flood defence walls (reinforced concrete and precast elements), reconstruction of existing bridges, new reinforced concrete culverts, drainage and utility diversions, hard and soft landscaping and other associated works.
View the procurement » Mentioned suppliers:McGinty and O'Shea Ltd
2017-06-23Capital Dredging Works at Dublin Port — 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 m³ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month …
View the procurement »
2017-06-09Enabling Works Contract, Smooth Point, Killybegs Fishery Harbour Centre (Department of Agriculture, Food and the Marine)
The works will comprise the following:
Environmental dredging of approximately 24 500 cubic metres of contaminated marine sediments.
Stabilisation of the dredge material within the Fishery Harbour Centre.
Removal of the stabilised material from site for re-use or disposal.
Removal of an existing stockpile of inert clay (circa 13 000 cubic metres) from the harbour.
Putting in place all necessary waste permits, licences or permissions required to lawfully stabilise the dredged material and remove it from …
View the procurement » Mentioned suppliers:ABCO Marine (IRL) Ltd
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly …
View the procurement »
2015-05-27Ballymun Boilerhouse Repurpose WISER (Working with Industrial Spaces to Exemplify Reuse) Life Project, Ballymun... (Dublin City Council)
The WISER (Working with Industrial Spaces to Exemplify Reuse) project brings together a broad spectrum of interrelated operations and expertise to champion the development of resource efficiency. The aim is to produce a centre to demonstrate excellence in reuse practice including the construction process. The Project seeks to lead change from waste to resource through reuse, redesign, research and education and as such it is desired that tendering contractors should illustrate experience in the …
View the procurement » Mentioned suppliers:Purcell Construction Ltd