2023-05-03   Multi-party Framework Agreement & Schedule of Rates Tender for Minor Civil Engineering and Associated Works 2023 (Tipperary County Council)
The Contracting Authority intends to enter into a multi-party Framework Agreement for minor civil engineering and associated works on public roads, streetscapes, public open spaces and in other public areas based on a suitability assessment and a schedule of rates document. Work contracts will be awarded from 7 work Lots, in each of Tipperary County Council's 5 Municipal/Borough Districts. Drawdown from the Framework will be by cascade only based on the separate schedules of rates for each of the Borough โ€ฆ View the procurement ยป
Mentioned suppliers: Dermot F Kinane Ltd. Dunne Brothers Ltd English Tarmac Ltd Eugene Fallon Plant Hire Ltd FM Estimating & Building Design Neville Civil Works Ltd Rathcabin Tarmacadam Ltd Ri na mona Sean Smith and Associates Ltd Suir Plant Ltd TOM DELAHUNTY PLANT HIRE LTD V Plant Construction Ltd
2023-03-29   Hydraulic dredging and levelling/ploughing Services. Mechanical dredging works are not included within the DPDF... (Dublin Port Company)
DPC intends to engage in a competitive process to procure dredging services using a Multi-Party Framework Agreement to maintain their operational marine areas. This is referred to as the Dublin Port Dredging Framework (DPDF) and is being established and operated in accordance with the EU Utilities Directive Dir.2014/25/EC and the associated Irish Statutory Instrument, SI 286 of 5th May 2016 implementing that Directive with binding force specificity, precision and clarity, in accordance with Irelands โ€ฆ View the procurement ยป
2022-08-05   Stormwater Pump Stations - Athlone Flood Alleviation Scheme (Office of Public Works (OPW))
Selection, supply, installation and commissioning of pumping stations in accordance with the specification as part of the Athlone Flood Alleviation Scheme. View the procurement ยป
2022-04-01   Smooth Point Pier Extension Completion Contract, Killybegs F.H.C (Department of Agriculture, Food and the Marine)
Extension of the existing quay wall at Killybegs F.H.C in the vacinity of Smooth Point which will include the construction of new combined quay wall structure, dredging in rock and removal of dredged rock to a storage site within Killybegs F.H.C. Construction of a piled releaving slab and installation of associated services. View the procurement ยป
Mentioned suppliers: Sorensen Civil Engineering Ltd
2021-12-13   Supply of Mobile Diesel Powered Pumps for the Springfield Flood Relief Scheme (Office of Public Works (OPW))
Supply of 2 No. 400mm diameter (16 inch) Mobile Diesel Powered Pumps & Accessories - Springfield Flood Relief Scheme View the procurement ยป
Mentioned suppliers: Gormann-Rupp Europe BV Meneen
2021-07-06   Dredging Campaign for Foynes Harbour and Limerick Port (Shannon Foynes Port Company)
The contracting entity is looking to engage with an economic operator to provide services in line with the requirements set out in the tender documents to perform a Dredging Campaign in Foynes Harbour and Limerick Port. View the procurement ยป
Mentioned suppliers: Boskalis Westminster Ltd
2019-12-20   Maintenance Dredging Works 2020-2029 (Port of Cork Company)
The Port of Pork (PoC) intends to procure maintenance dredging services using a multi-party framework agreement (MPFA) to maintain their operational marine areas. The MPFA constitutes a means of establishing overall terms and conditions whereby individual contracts may be awarded in an expeditious manner. Dredging contractors will be appointed to the framework in accordance with these instructions, the framework agreement and based on meeting the minimum quality scoring criteria outlined herein. Under โ€ฆ View the procurement ยป
Mentioned suppliers: Jan de Nul
2018-05-03   Pre-qualification to Restricted Tender Panel for Smooth Point Pier Extension, Killybegs Fishery Harbour Centre,... (Department of Agriculture, Food and the Marine)
The Department of Agriculture, Food and the Marine are undertaking a pre-qualification process to assess the suitability of prospective tenderers for the main construction and dredging contract relating to the smooth point pier extension project in Killybegs Fishery Harbour Centre, Co. Donegal. This project is part supported by the Irish government and the European Maritime & Fisheries Fund as part of the EMFF operational programme for 2014-2020. Further details in relation to the proposed works to which โ€ฆ View the procurement ยป
Mentioned suppliers: ABCO Marine (IRL) Ltd
2018-04-09   Multi-Party Framework Agreement for Dredging Works at Dublin Port (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide and other relevant works. View the procurement ยป
2017-11-06   Pre-Qualification Process to access suitability of Tenderers for the Dinish Wharf Expansion at Castletownbere... (Department of Agriculture, Food and the Marine)
Pre-Qualification Process โ€” Expressions of interest are sought from suitably experienced building contractors who can demonstrate experience relevant to the required works and who can mobilise sufficient plant and labour resources. The proposed development is to facilitate the provision of an additional 216 m of berthage at Dinish Island, Castletownbere Fishery Harbour Centre, Co. Cork. The works include but are not limited to site clearance, dredging/excavations, infilling/reclamation, quay wall โ€ฆ View the procurement ยป
Mentioned suppliers: L&M Keating Ltd
2017-06-23   Capital Dredging Works at Dublin Port โ€” 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 mยณ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month โ€ฆ View the procurement ยป
2017-06-09   Enabling Works Contract, Smooth Point, Killybegs Fishery Harbour Centre (Department of Agriculture, Food and the Marine)
The works will comprise the following: Environmental dredging of approximately 24 500 cubic metres of contaminated marine sediments. Stabilisation of the dredge material within the Fishery Harbour Centre. Removal of the stabilised material from site for re-use or disposal. Removal of an existing stockpile of inert clay (circa 13 000 cubic metres) from the harbour. Putting in place all necessary waste permits, licences or permissions required to lawfully stabilise the dredged material and remove it from โ€ฆ View the procurement ยป
Mentioned suppliers: ABCO Marine (IRL) Ltd
2016-09-05   Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly โ€ฆ View the procurement ยป
2016-03-02   Qualification system for maintenance dredging works at Rosslare Europort, Co. Wexford, Ireland (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for the procurement and establishment of a View the procurement ยป
2016-02-24   Ringaskiddy Port Re-development Project (Port of Cork Company)
The proposed works comprise the construction of the marine and civil engineering infrastructure elements for a new container terminal and multi-purpose berth at Ringaskiddy Port, Cork. Key elements may include: โ€” Quay wall structures including marine piling; โ€” Dredging in overburden and rock to a depth of -13,0 m Chart Datum CD); โ€” Reclamation and shore protection; โ€” Quay deck surfacing and quayside crane foundations including piling; โ€” Heavy duty surfacing of existing port lands for use as operational โ€ฆ View the procurement ยป
Mentioned suppliers: BAM Civil Ltd
2013-04-26   Maintenence Dredging at Drogheda Port, Ireland east coast (Drogheda Port Company)
3yr Maintenence dredging contrac t with extension for the dredge maintenenace of the river entrance, seaward approaches, river channel, berths and ship swinging areas, at Drogheda Port View the procurement ยป