2023-03-29Hydraulic dredging and levelling/ploughing Services. Mechanical dredging works are not included within the DPDF... (Dublin Port Company)
DPC intends to engage in a competitive process to procure dredging services using a Multi-Party Framework Agreement to maintain their operational marine areas. This is referred to as the Dublin Port Dredging Framework (DPDF) and is being established and operated in accordance with the EU Utilities Directive Dir.2014/25/EC and the associated Irish Statutory Instrument, SI 286 of 5th May 2016 implementing that Directive with binding force specificity, precision and clarity, in accordance with Irelands โฆ
View the procurement ยป
2019-12-20Maintenance Dredging Works 2020-2029 (Port of Cork Company)
The Port of Pork (PoC) intends to procure maintenance dredging services using a multi-party framework agreement (MPFA) to maintain their operational marine areas. The MPFA constitutes a means of establishing overall terms and conditions whereby individual contracts may be awarded in an expeditious manner.
Dredging contractors will be appointed to the framework in accordance with these instructions, the framework agreement and based on meeting the minimum quality scoring criteria outlined herein.
Under โฆ
View the procurement ยป Mentioned suppliers:Jan de Nul
2017-06-23Capital Dredging Works at Dublin Port โ 2017 to 2018 Season (Dublin Port Company)
The required dredging will be undertaken as part of the proposed works to permit access to Alexandra Basin West and provide sufficient water depths for vessels in Alexandra Basin West at all stages of the tide. The contract to be awarded will cover the first seasons dredging and will take place in the outer approach channel. This equates to approximately 1 061 818 mยณ of dredging. It is envisaged that the dredging of uncontaminated material will be carried out during winter months only, within a 6 month โฆ
View the procurement ยป
2017-06-09Enabling Works Contract, Smooth Point, Killybegs Fishery Harbour Centre (Department of Agriculture, Food and the Marine)
The works will comprise the following:
Environmental dredging of approximately 24 500 cubic metres of contaminated marine sediments.
Stabilisation of the dredge material within the Fishery Harbour Centre.
Removal of the stabilised material from site for re-use or disposal.
Removal of an existing stockpile of inert clay (circa 13 000 cubic metres) from the harbour.
Putting in place all necessary waste permits, licences or permissions required to lawfully stabilise the dredged material and remove it from โฆ
View the procurement ยป Mentioned suppliers:ABCO Marine (IRL) Ltd
2016-09-05Multi-Party Framework Agreement for Capital Dredging Works at Dublin Port (Dublin Port Company)
The scope of the multi party framework agreement is for Capital Dredging Works at Dublin Port including but not limited to dredging at Alexandra Basin, maintenance dredging and other relevant works and associated design as required. The Multi Party Framework Agreement will be awarded on foot of an initial contract for Year 1 of the Capital Dredging Works Programme at Alexandra Basin. In addition to the initial contract, the framework agreement may, or may not, be used for the following contracts: Yearly โฆ
View the procurement ยป
2016-02-24Ringaskiddy Port Re-development Project (Port of Cork Company)
The proposed works comprise the construction of the marine and civil engineering infrastructure elements for a new container terminal and multi-purpose berth at Ringaskiddy Port, Cork.
Key elements may include:
โ Quay wall structures including marine piling;
โ Dredging in overburden and rock to a depth of -13,0 m Chart Datum CD);
โ Reclamation and shore protection;
โ Quay deck surfacing and quayside crane foundations including piling;
โ Heavy duty surfacing of existing port lands for use as operational โฆ