2015-02-16New Post Primary School at Clifden Community School (Department of Education and Skills)
Construction of a new, part 2-storey and part three-storey post primary school building of ca. 3 900 m², along with temporary classrooms for the duration of the works, a new school entrance and associated internal access roads, parking spaces, landscaping and drainage works including a new on-site waste water treatment plant, while the existing school and gymnasium on the site remain fully operational. Demolition of the existing school building and associated pre-fabricated classroom structures once the …
View the procurement »
2015-01-16Design and construction of 2 no Radiation Oncology centres at Cork and Galway University Hospitals (Health Service Executive (HSE))
Design and construction of 2 no Radiation Oncology centres.
Cork University Hospital (CUH): A new facility of approximately 8 800 square metres (Gross Floor Area) over 3 storeys above ground level, including Bunkers for 7 Linear Accelerators and support accommodation, a Brachytherapy Suite, Shelled Out MRI Suite, 2 no CT Scanners, On-Treatment Support, Technical and Administration support accommodation and associated site works, and University Hospital Galway (UHG): A new facility of approximately 8 000 …
View the procurement »
2015-01-05Automatic Tray Return Systems (ATRS) (daa plc)
Daa currently has a number of passenger search areas in service across its 2 Terminals at Dublin (Terminal 1 and Terminal 2) Airport. These Search areas are an essential component of the Terminal operations at each Airport. As well as being required to be efficient and smooth they must first and foremost comply with both EU and International Compliance Regulations. As a result, daa plc intends to upgrade the existing passenger screening systems between 2015 and 2016 to accommodate enhanced security …
View the procurement »
2015-01-05Airside Electrical Installation Framework (daa plc)
The Contracting Authority proposes to appoint between 4 and 8 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield Electrical construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2015 to 2019 inclusive.
View the procurement »
2014-12-29Oaklee Housing Trust is seeking expressions of interest in the Design and Build of Social Housing on Developer... (Oaklee Housing Trust)
Expressions of interest are sought from suitably resourced and experienced contractors/developers for the Design and Build of social housing on developer owned of controlled land banks. It is envisaged that the developments will consist of between 10 and 50 dwellings (other quantities outside these parameters will be considered based on location, cost and demand) and the sites will be in areas where there is a strong social housing demand. The proposed sites should have the requisite planning consents, …
View the procurement »
2014-11-21Construction of a new Swimming Pool Complex, Outdoor Educational Building and Outdoor Playing Pitches, Athletic... (Mayo County Council)
New development of a Swimming Pool Complex and Outdoor Educational Building, incorporating indoor swimming pools, viewing area, changing and storage facilities, fitness gym, aerobics studio, climbing wall, lecture rooms and associated offices, site services, car-park and pedestrian links at Knockacroghery, Castlebar, Co. Mayo plus New development of Outdoor Playing Pitches, Athletic track and Clubhouse, incorporating changing, toilet and storage facilities and all associated site services, car-parking, …
View the procurement »
2014-11-10Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont... (Beaumont Hospital)
The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric …
View the procurement »
2014-11-10Multi-functional sports building for Galway Mayo Institute of Technology, Dublin Road, Galway (Galway Campus) (Galway Mayo Institute of Technology)
The Galway-Mayo Institute of Technology) is seeking to short-list a maximum of 10 contractors who will be invited to tender for a Multi-functional Sports Building. The development will consist of a 2 storey multi-functional sports building with approximately gross floor area of 2 500 m², car parking, ESB Substation, signage, landscaping and all associated site development works and services. Vehicular access to the development will be via the existing access road off Ballyloughane Road. The proposed …
View the procurement »
2014-11-06Construction Work — Framework Agreement Minor and Major — please see attached work document (Notice — Scope Of... (An Post)
Construction work FWA 1 Minor:
The works covered under this framework agreement would fall into 3 categories:
1. Refurbishment works,
2. Small minor works,
3. Extensions to existing occupied premises.
Most of the work will be carried out in buildings that are occupied and continuity of business will be required at all times.
FWA 2 Major:
The works covered under this framework agreement would fall into 4 categories:
1. Significant Refurbishment works,
2. Extensions to existing occupied premises,
3. Fit …
View the procurement »
2014-11-05Proposed Development at Canon Troy Court, Chapelizod Hill, Ballyfermot, Dublin 10 (The Iveagh Trust)
The Iveagh Trust wish to appoint a competent and experienced building contractor with mechanical and electrical works capacity and experience to construct and complete all necessary works to deliver on programme the redevelopment of Canon Troy Court.
The works are for the development of 74 no units (4 705 m² GFA) over 4 storeys on a site of approx. 5.4 hectares. The works comprise the extension and refurbishment of existing block and the construction of new blocks.
Site works will include the …
View the procurement »
2014-10-15Phase 2 Wards/Theatre/A&E Extension Building, Our Lady of Lourdes Hospital Drogheda Co. Louth (Health Service Executive (HSE))
The works consist of a new building constructed next to the phase 1 existing emergency department block. The new block will provide for an A & E extension on the ground floor, Three ward floors to provide approx eighty three new single beds and operating department of five operating theatres on the fourth floor. Initially however only a partial fit out is proposed comprising two ward floors and part of the ground floor.
View the procurement »
2014-10-06Teaching and Learning Centre at Institute of Technology Carlow (Institute of Technology Carlow)
The project consists of the development of a new 3 storey Teaching and Learning Centre of circa 3 100 m² at Institute of Technology Carlow‘s main campus, Kilkenny Road, Carlow. Accommodation includes Lecture Theatres, Classrooms, Project Rooms, IT/Computer facilities, Staff facilities, Administration and Circulation Space. The project also includes ancillary external works.
View the procurement »
2014-08-29Wexford Garda Divisional HQ - Main Contractor - Pre-qualification (Office of Public Works ( OPW ))
The Commissioners of Public Works are seeking applications from experienced building contractors who wish to be pre-qualified to tender for the construction of a new 3 952 sqm Garda Divisional Headquarters on a site circa 2,79 hectares at Mulgannon Road, Wexford, Ireland.
Separate notices will issue in respect of Mechanical, Electrical & Lift Specialists for this project.
View the procurement »
2014-08-19HOB Refurbishment Project (Design and Build) (Dublin Airport Authority plc (DAA))
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the ‘Employers Requirements Documents’. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose.
View the procurement »
2014-08-14Applications for Public Funding for the development of a Multifunctional Event Centre in Cork City (Cork City Council)
The development of a multifunctional venue of scale has been an objective of Cork City Council (the ‘Council’) since the 1990's. The existence of market failure has meant that without some level of public funding or subvention, potential investors would not proceed with the development of such a venue. In recognition of this the Irish Government has made up to 10 000 000 EUR available as part of the public sector support for this project and the Council will make further funding up to EUR4m available as …
View the procurement »
2014-07-11cnpy2014 - Drogheda Port Company are seeking tenders for the provision of a canopy type break bulk store (Drogheda Port Company)
Drogheda Port Company are seeking tenders for the provision of a canopy type break bulk store, comprising of a roof on a steel frame type to cover an existing port storage area of approximately 1500m2. The building fit for purpose in a port environment should conform to the grant of permission issued on 23.6.2014 and certified on completion in accordance with current building regulation requirements and lighting to conform to appropriate electrical industry standards.
View the procurement »
2014-07-04UL0330 – University of Limerick Sport Arena Extension (University of Limerick)
The development will comprise the construction of a circa 4,500 m² extension to the UL Sports Arena on the University of Limerick Campus. The development includes a single storey buidling to provide a 25M X 10M swimming pool and a separate three store extension to provide an elite dry sports training facility. The swimming pool includes a 25M x 10M training pool complete with diving facility to 4m depth at one end, additional squad changing rooms and associated shower areas complete with ancillary pool …
View the procurement »
2014-07-02Galway Garda Regional and Divisional HQ - Main Contractor Pre-qualification (Office of Public Works ( OPW ))
The Commissioners of Public Works are seeking applications from experienced
building contractors who wish to be considered for inclusion on a panel from
which tenders will be invited for the construction of a new Garda Regional and
Divisional Headquarters on a greenfield site at Dublin Road, Galway. A separate
notice has been transmitted for mechanical, electrical and lift specialists.
View the procurement »
2014-06-21ED & Dialysis Fit Out & Other Works Project - New Emergency Department & Dialysis Unit Fit Out & Associated Other... (Health Service Executive (HSE))
The project includes the fit-out for new Emergency and Dialysis Departments
and related other works at University Hospital Limerick. The Emergency Department will be mainly accommodated in a shell building at level 0, part of which is directly underneath the hospital's current live Intensive Care Unit and the remainder of the shell space is underneath another shell space at level 1 which will also be fitted out as part of the works to provide a new dialysis unit for the hospital. The works will include …
View the procurement »
2014-06-13Haddington Road National School (Department of Education & Skills)
Expressions of Interest are invited from suitably qualified building contractors who wish to be considered for of the demolition/removal of all existing buildings and structures on the site and the construction of a new 24 classroom primary school building (approx. 3 800 m²), and ancillary accommodation, over 3 storeys.
View the procurement »
2014-05-29P2352 - T2 MSCP Extension (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to commission a Design & Build contractor to Design and Construct additional floors to the T2 multi-story car park structure at Dublin Airport to facilitate short-term parking spaces to be known as Phase 2.
Phase 2 of the project will be constructed in sub phases to facilitate the current commercial operation of the carpark, which will remain operational during the works.
View the procurement »
2014-05-29Kevin Street Garda Divisional HQ – Phase 2 – Main Contractor Prequalification (Office of Public Works (OPW))
Scope of the proposed work comprises a New Garda Divisional Headquarters (Phase 2) which will be adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace). This project is a 2 phase development, the first phase of which is now complete. This second phase of the works will consist of the construction of a new 6 840 sqm Garda Divisional Headquarters building with a 5 400 sqm double basement. The development consists of a 2-3 storey building …
View the procurement »
2014-05-13Phase 2 Works Contract for the Refurbishment, Construction of Structure 12 (Laundry Building) to form a Primary Care... (Grangegorman Development Agency)
The GDA is seeking to shortlist eight contractors who will be invited to tender for Phase 2, Refurbishment of Structure 12 (Laundry Building) and construction of new three storey extension to form a Primary Care Centre.
By way of indicative summary only the GDA is seeking in broad terms a Works Contractor for Phase 2 of the refurbishment works of an existing building (a protected structure) and construction of new building at Grangegorman, comprising:
(i) Structure 12 - The Laundry Building (Protected …
View the procurement »
2014-04-29Multi-Operator Contractor Framework Agreements (Limerick City and County Council)
Limerick City and County Council intends to establish three Multi-Operator
Contractor Framework Agreements to complete capital works projects associated
with the Limerick City Regeneration Project.
The physical regeneration project involves activity in a number of areas from
small scale environmental improvement works to large scale infrastructural
projects. The delivery of residential units, across a range of unit types including
houses, apartments, duplex units, etc. is an important component of the …
View the procurement »
2014-04-17Courts Bundle Public Private Partnership (PPP) (National Development Finance Agency)
Following on from the Prior Information Notice ("PIN") (RFT 80008), the National Development Finance Agency, acting for and on behalf of the Department of Justice and Equality (“DJE”) (as Sanctioning Authority ) and the Courts Service (as Sponsoring Agency) intends to procure the Courts Bundle PPP (the Project) to design, build and/or extend and/or refurbish (as outlined in the Project Information Memorandum/Pre-Qualification Questionnaire document attached to the eTender's notice), finance and maintain …
View the procurement » Mentioned suppliers:BAM PPP PGGM Infrastructure Cooperatie UA
2014-04-16National Indoor Arena - Design & Build the National Indoor Arena (National Sports Campus Development Authority)
NSCDA will procure the development of the National Indoor Arena as per the Planning Permission granted by Fingal County Council (Planning Reference FW09A/0061, referenced as "Main Core Building) under a design and build works contract(s) (the “Relevant Construction Works”).
The Relevant Construction Works will comprise the development of a signature structure (ranging in height from 12 to 17 metres, with a circa 43 000 sq. metre gross floor area) over two levels, comprising:
- National Gymnastics …
View the procurement »