Recent procurements of site preparation and clearance work in Ireland
2023-10-04Construction of Temporary Bus Depot at Jamestown (National Transport Authority_1149)
The proposed temporary depot will include provision for parking, maintenance and dispatch of buses to the public transport network serving the Dublin City urban areas and associated support infrastructure and amenity for drivers and support staff operating from the facility.This proposed depot will be located 7 km north of the city centre along the Jamestown Rd. The proposed depot will include 180 bus parking bays, a maintenance building (1000m2) and an administration building (700m2).
View the procurement »
2023-08-31N67 Kinvara Village AT Scheme - Ground Investigations Contract (Galway County Council)
The project involves the gathering, and compilation of ground investigation data to enable the planning, design and construction of the Kinvara Village Active Travel Scheme. This project will consist of the construction of a boardwalk adjacent to the northern side of the existing N67 and the associated civil works (i.e. footpath/kerb realignment, diversion of underground services, pavement works…). Part of this boardwalk may require structural support by means of a cantilever structure founded on piles. …
View the procurement »
2023-08-11Establishment of a Multi-Party Framework Agreement for Public Realm and Civil Engineering Works for Kildare County... (Kildare County Council_385)
Public Realm improvement works to Emily Square including reconfiguration of traffic circulation along the R417, restricted access along west side of Emily Square and closure of local road to the Front of Athy Heritage Centre. The proposed works comprise the upgrade of existing footpaths with paving and concrete, realigning kerblines, the provision of street landscaping, and supply and installation of street furniture inclusive of seating, street lighting, signage, bollards, planters, Interpretive Signage …
View the procurement »
2023-08-09Annaghmeaghera Bog Restoration Works (Department of Housing Local Government and Heritage)
1. Construction of peat dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All tanks and sheds for the storage of fuel.
View the procurement »
2023-08-02Cloncrow Bog NHA Restoration Works (Phase 2) (Department of Housing Local Government and Heritage)
1. Construction of peat dams and plastic dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All tanks and sheds …
View the procurement »
2023-08-02Derrinlough Bog SAC Restoration Works (Department of Housing Local Government and Heritage)
1. Construction of peat dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas and contour bunds on the high bog 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All …
View the procurement »
2023-07-27Lough Forbes Complex SAC South Bog Restoration Works (Department of Housing Local Government and Heritage)
1. Construction of peat dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas and contour bunds on the high bog 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All …
View the procurement »
2023-07-24Lough Forbes Complex SAC North Bog Restoration Works (Department of Housing Local Government and Heritage)
1. Construction of peat dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas and contour bunds on the high bog 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All …
View the procurement »
2023-07-13Raphoe Flood Relief Scheme - G.I for Site Surveys and Topographical surveys (Office of Public Works OPW)
Survey data required within Raphoe in County Donegal to progress the implementation of the flood relief scheme. Survey types required - Site Services Survey - Lot 5 - Survey data required within Raphoe to progress the implementation of the flood relief scheme. Survey types required: Topographic Survey Spec Lot 1 Survey existing control points and establish new survey control points were required. - Topographical survey , Channel and structure survey PW-CF8 v1.4 29/07/2021 Short Investigation Contract
View the procurement »
2023-07-11Cloncrow Bog NHA Restoration Works (Phase 2) (Department of Housing Local Government and Heritage)
1. Construction of peat dams and plastic dams within existing drains on the high bog and cutover. 2. Construction of trench bunds on the cutover areas 3. Installation of plastic sheet piles/pipes to form weirs in the trench bunds where necessary. 4. Erection of Warning Signs cautioning of danger due to deep water. 5. Temporary welfare facilities for the Contractors staff and workers. 6. Everything necessary for the proper storage of materials including sheds, fencing, racks etc. 7. All tanks and sheds …
View the procurement »
2023-07-10N4 Carrick to Dromod Phase 3 Ground Investigation Contract (No. 01) (Leitrim County Council_2136)
The N4 Carrick-on-Shannon to Dromod Project aims to identify, evaluate, and resolve the transportation issues in the Carrick-on-Shannon / Cortober area, its environs, and the broader national road network – in particular the N4 corridor, as appropriate. The ground investigation comprises a combined geotechnical, geoenvironmental and hydrogeological investigation as part of Phase 3 for the N4 Carrick-on-Shannon to Dromod Project. There are three sections of the ground investigation, namely the Offline, …
View the procurement »
2023-07-04Est Constr University Hospital Galway Site Clearance Works (Health Service Executive HSE)
The works comprise the removal and disposal of redundant temporary buildings and a single-storey section of permanent buildings, including removal of concrete ramps, steps and railings, redundant drainage and redundant mechanical and electrical services. The site is to be levelled and hoarded off on completion of the works. The works are to be carried out on the site of a fully functioning acute hospital. A section of building will be retained for use as a Neurology OPD adjacent to works to be removed. …
View the procurement »
2023-06-23UCC Prequalification of Works Contractors for Cork University Business School (University College Cork)
The project consists of the construction of a new circa 15,500m2 Business School. The building will include adaptable teaching spaces, lecture theatres, creative and innovation spaces, student and staff learning commons/breakout spaces, offices and a restaurant/café space. It also includes the refurbishment of the existing buildings 18 and 19 on South Terrace. Building structure is steel frame with metal deck and structural concrete floor. The external elevation will consist of high-quality glazing and …
View the procurement »
2023-05-30Marina Park Phase 2 (Cork City Council)
The proposed Marina Park Phase 2 is situated between Cork City South Docklands and Blackrock Village. The scheme aims to provide an ‘eco-park’ and an area of high-quality public realm and landscape, while protecting and enhancing the natural heritage and biodiversity of the area. The scheme aims to improve public accessibility and amenities through the site. It includes the restoration and protection of historical structures and the creation of points or interest and park attractions such as “Nature” …
View the procurement »
2023-05-26N70 Sneem to Blackwater Bridge (Tahila to Doon) Road Project - Ground Investigation Contract (Kerry County Council_1204)
The purpose of this Contract is to carry out Ground Investigation works to provide geotechnical information to inform the design and construction of the N70 Sneem to Blackwater Bridge (Tahila to Doon) Road Project. The Ground Investigation works will consist of fieldwork followed by laboratory testing and factual reporting. The fieldwork will include boreholes/rotary coring, trial pits, slit trenches, dynamic probing, pavement cores and geophysical (hydrographic) surveying.
View the procurement »
2023-05-09Cork City Council Housing Programme 2023-25 (Cork City Council)
The Cork City Council Housing Programme 2023-25 is a part of Cork City Council’s Housing Delivery Action Plan under the Government’s Housing for All - a New Housing Plan for Ireland, although this procurement process may include schemes that will be delivered beyond the lifetime of the Housing For All plan. Cork City Council proposes to deliver both social, affordable and mixed tenure schemes in delivery of its housing programme for the coming years and therefore invites proposals from Candidates which …
View the procurement »
2023-04-28Whitestown Remediation Project - The removal of all waste, contaminated soil and potentially contaminated soil from... (Wicklow County Council)
Works shall include but not limited to;
• Site mobilisation, set up and enabling works.
• Installation of environmental protection measures
o surface water management
o silt fence installation
o installation of additional or replacement monitoring infrastructure
• Staged waste excavation and removal of waste, contaminated and potentially contaminated soil (approximately 175,000m3) and associated reprofiling works
• Landscaping and Fencing
• Demobilisation
• Post Remediation Handover Period
View the procurement »
2023-02-08Framework for Ground Investigation Surveys (National Transport Authority)
The National Transport Authority (NTA) is progressing with BusConnects Dublin, a major investment programme to improve public transport in the Greater Dublin Area. It aims to overhaul the current bus system in Dublin through a 10 year programme of integrated actions to deliver a more efficient, reliable and better bus system for more people.
BusConnects Dublin includes 12 Core Bus Corridor (CBC) schemes.
The National Transport Authority requires utility survey investigation works for 12 schemes, and …
View the procurement »
2023-02-07Tree Felling Works Framework (Bord Na Mona)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for Tree Felling works for the Company. The Company intends to establish a multi supplier Framework Agreement for the provision of these works. The Framework Agreement period will be for four years with the possibility to extend annually for up to four years, subject always to the satisfactory performance of the Framework members.
View the procurement »
2022-11-02Pre-Qualification of Works Contractors for Tyndall North New Facility (University College Cork ( UCC ))
The project consists of the construction of a new circa 17,426m2 research building. The building will be primarily used as a research facility with LV labs, packaging, ULV Labs, bio photonics labs, ancillary labs, meeting rooms, offices, roof top plant enclosure, support service areas and roof terraces. The third, fourth and fifth floor will currently not be fitted out as part of this tender.
The building structure is a concrete frame with lightweight internal walls. The external elevation will consist …
View the procurement »
2022-11-01Works Contract for Devoy Barracks Housing Development (Phase 1) (Land Development Agency)
The Devoy Barracks housing development is a key strategic project located on John Devoy Road, Naas, Co. Kildare, Ireland and forms part of current and future programmes of work to be undertaken by the Contracting Authority to develop affordable sale, cost rental and social housing and apartments.
The development consists of circa 19,650 sqm of accommodation. It will deliver 219 new homes, comprising of a mix of terraced houses, duplexes, apartments, a creche, and all ranging in height from 2 to 5 …
View the procurement »
2022-07-11Residential Development at Stereame, Nenagh, Co. Tipperary (Tipperary County Council)
Candidates with experience in the planning, design, financing, and development of residential developments are invited to make contact with Tipperary Co. Co. via the eTenders portal with a view to the Council inviting them to a meeting to explore their potential interest in this project. Please see additional information below for more details regarding this competition
View the procurement »
2022-07-07Capital Dredging Works for Ros an Mhíl Deep Water Quay, Ros an Mhíl Fishery Harbour Centre, Co Galway (Department of Agriculture, Food and the Marine)
The proposed contract is to engage in rock blast and dredge works to facilitate the navigation to, and construction of, a new 200m long Deep Water Quay located adjacent to the existing Ros an Mhíl Fishery Harbour Centre, Co. Galway, Ireland. The Works and Sections of the Works will be constructed within the specified dates. The Works include drill and blast of an approximate 25,000m³ - 35,000m³ rock (depending on option), dredging in the navigation channel and berthing pocket and follow-on recovery of …
View the procurement »
2022-06-16Works Contract for the Design & Construction of Devoy Barracks Housing Development for The Land Development Agency (Land Development Agency)
Devoy Barracks housing development is a key strategic project located on John Devoy Road, Naas, Co. Kildare, Ireland and forms part of current and future programmes of work to be undertaken by the Contracting Authority to develop affordable sale, cost rental and social housing and apartments.
The Project consists of circa 19,650 sqm of accommodation. It will deliver 219 new homes, comprising of a mix of terraced houses, duplexes, apartments, a creche, and all ranging in height from 2 to 5 …
View the procurement »
2022-05-12Dublin City Council Competitive Dialogue Turnkey Programme (Dublin City Council)
The Dublin City Council Housing Programme 2022-2026 is part of the delivery plan under the new Housing for All plan as approved by Government in 2021. Housing for All plans to deliver over 300,000 new homes including 90,000 social homes and 54,000 affordable homes for purchase or rent by 2030 so as to meet the housing deficit in the State over the time period. There are significant targets to be achieved in Dublin City and the Competitive Dialogue Process, Turnkey Programme serves as one of the delivery …
View the procurement »
2022-02-23Louth County Council Peters Hill, Drogheda (Louth County Council)
Removal of car parking and redesign of the space will allow an open area and vista for the protected structures that front onto Peters Hill meeting space with reallocation of existing Blue Badge or wheelchair accessible parking to adjoining streets.
A retaining structure will be constructed to modify the existing gradient to be more suitable for pedestrian space along with provision of areas of soft planting and street tree planting.
View the procurement » Mentioned suppliers:Glas Civil Engineering Ltd