2023-05-30   Marina Park Phase 2 (Cork City Council)
The proposed Marina Park Phase 2 is situated between Cork City South Docklands and Blackrock Village. The scheme aims to provide an โ€˜eco-parkโ€™ and an area of high-quality public realm and landscape, while protecting and enhancing the natural heritage and biodiversity of the area. The scheme aims to improve public accessibility and amenities through the site. It includes the restoration and protection of historical structures and the creation of points or interest and park attractions such as โ€œNatureโ€ โ€ฆ View the procurement ยป
2023-04-07   TII369 (Transport Infrastructure Ireland (TII))
The works described below are split into three separate lots to undertake routine maintenance of circa 1800 National Road Bridge structures in the Republic Of Ireland. The Lots are: 1. North West Bridges Term Maintenance Contract No. 4 2. Munster Bridges Term Maintenance Contract No. 4 3. Leinster Bridges Term Maintenance Contract No. 4 The scope includes for Annual Routine Maintenance of bridge structures nationwide within a five year maintenance contract, including vegetation clearance, cleaning โ€ฆ View the procurement ยป
2022-04-04   A Lightweight Modular General Support Bridge (Irish Defence Forces)
In summary, the Goods comprise: The Corps of Engineers are seeking the provision of a lightweight modular military general support bridge to provide a general support bridging capability to the Defence Forces. The bridge must have a span no less than 30m and no more than of 35m across a wet or dry gap with an MLC of 70T. The bridge system must provide a roadway width of 4m with parapet/handrails. The option of segregated walkway with handrails can also be priced. The bridge comprises of a girder bridge โ€ฆ View the procurement ยป
Mentioned suppliers: WFEL Ltd
2022-02-10   Louth County Council Narrow Water bridge Wind study and wind tunnel test (Louth County Council)
This commission seeks to engage a competent and experienced Wind Testing Laboratory to undertake and report on a regime of Wind Tunnel Tests of a cable stayed bridge and rolling bascule opening span. The laboratory will be required to carry out wind climate analysis and several wind tunnel tests of the deck and the tower to assess the aerodynamic behaviour of the structure, such as sectional model tests and assessment of wind shielding efficiency. The laboratory is required to issue a report on the results View the procurement ยป
2021-04-16   Multi Operator Framework Agreement for Bridge Consultancy Services (Westmeath County Council)
Westmeath County Council is seeking suitably, qualified, competent, experienced engineering consultants to form a framework to carry out design, procurement and construction services on a number of bridges at various locations in Westmeath. The consulting engineer shall also be appointed as Project Supervisor Design Process (PSDP) for each project. View the procurement ยป
Mentioned suppliers: O'Connor Sutton Cronin & Associates
2021-04-07   The Irish Defence Forces Corps of Engineers requires Assault Bridging Equipment for Use to Support Defence Forces... (Irish Defence Forces)
The Irish Defence Forces Corps of Engineers requires Assault Bridging Equipment for use to support Defence Forces operations and training activities in Ireland. These bridge systems should be capable of spanning a wet or dry gap up to 30 m in span. The bridge should consist of a series of man portable panels which are joined together and cantilevered across the gap. The Bridge system and all component parts should be stored on a frame/in a container no larger in dimensions than a 20ft ISO Container. The โ€ฆ View the procurement ยป
Mentioned suppliers: Arcon Consultants
2019-09-27   Carrigaline Western Relief Road (Cork County Council)
Construction of a single 750 m carriageway road. The CWRR will run along the southern boundary of Nova Court residential estate, before crossing over the Owenboy River, by means of a 32 m reinfroced concrete river bridge. Current land-use within the CPO lands primarily comprises Greenfield lands; however residential properties and brownfield sites are located in the northern portion of the proposed CWRR route. Pedestrian and traffic lights will be placed at the north, south and central junctions to โ€ฆ View the procurement ยป
Mentioned suppliers: BAM Civil Ltd
2019-06-11   Multi-Party Framework Agreement of Main Contractors for the Dodder Greenway for South Dublin County Council, Dublin... (South Dublin County Council)
For the establishment of a multi-party Framework Agreement of main contractors for construction/upgrade/refurbishment type works for the Dodder Greenway for South Dublin County Council, Dublin City Council and Dun Laoghaire Rathdown County Council. View the procurement ยป
Mentioned suppliers: BAM Contractors Limited Clonmel Enterprises Ltd Farrans Construction trading as a... John Graham Construction Ltd trading as Graham Murphy International Ltd Murphy International Ltd. Noel Regan and Sons (Plant Hire) Ltd Wills Bros Ltd
2015-07-31   Limerick City Footbridge โ€” Consultants โ€” (Lot 1 โ€” Project Manager/Employers Representative and Quantity Surveyor and... (Limerick City and County Council)
Limerick City and County Council (The Authority) wish to appoint a design team to complete the Limerick Footbridge project. Applicants should note that the proposed development will form an iconic landmark on the Limerick City landscape and all members of the design team should have relevant bridge experience and expertise for a project of this nature. The following design team services are required: 1. Lot 1: Project Manager/Employers Representative and Quantity Surveyor, 2. Lot 2: Single Point Design โ€ฆ View the procurement ยป