Recent procurements of works for complete or part construction and civil engineering work in Ireland
2023-10-24UCDOPP5287 Grounds Maintenance and Sports Pitches (including Artificial Surfaces) Maintenance to University College Dublin (University College Dublin UCD)
University College Dublin is seeking to establish a sustainable Multi Supplier Framework Agreement for the provision of Grounds Maintenance and Sports Pitches including Artificial Surfaces Maintenance to University College Dublin. There are six Lots as follows Lot 1. Grounds Maintenance, Lot 2. Sports Pitch and Artificial Surfaces Maintenance, Lot 3. Road Maintenance including Gritting, Snow Ploughing, Road Sweeping and Road Drainage Maintenance, Lot 4. Tree Surgery, Lot 5. Grounds Maintenance Projects …
View the procurement »
2023-10-19Construction of single carriageway urban road Beckett Link Road, Dun Laoghaire, Co Dublin (Dun Laoghaire-Rathdown County Council)
The works comprise the construction of c. 1.6km 2-way single carriageway urban road (Level 2 (50km/h)), linking Cherrywood Avenue (Node H) to Bishop Street (Node F), Lehaunstown Greenway and the junction between Mercer's Road and Gun and Drum Hill (Node E2). The scope includes the construction of an underpass below the Wyattville Link Road (WLR) The Proposed Scheme is located within the Cherrywood SDZ lands primarily within Development Area 7 (Macnebury) and extends south into Development Area 6 (Bride’s …
View the procurement »
2023-10-19Proposed Military Medical Facility (MMF) at Casement Aerodrome, Baldonnel, Co. Dublin (Department of Defence)
“This is a Call for Tender in respect of Construction Works/Services” . • Please note that: • tenderers must associate themselves with this Competition in order to access the tender documents, ask and receive clarifications and submit a tender response. To do so you must ensure you click “Proceed with Association”. This can only be done via login. • all responses must be submitted in a zipped file format and must be accurately named. • the Contracting Authority are not in a position to answer queries …
View the procurement »
2023-10-13Conservation works to The Tholsel West Street, Drogheda, Co. Louth (Louth County Council_381)
The project consists of conservation works to the dome roof, the clock faces and the clock tower as detailed in the pricing document and design drawings and specifications. Please refer to the attached drawing, methods statements indicating the areas where works are required. A pricing document has been prepared for the build and for the preliminaries pertaining to the contract. The attached pricing document is to be read in conjunction with the drawings and specification and method statements. All …
View the procurement »
2023-10-11Construction of new Coast Guard Station in Greystones, Co. Wicklow: Pre-Qualification of Main Works Contractors and... (Office of Public Works OPW)
PROJECT DESCRIPTION: Construction of a new Coast Guard Station at Greystones harbour with a floor area of 259 square metres. Accommodation includes a boathouse and vehicle store, along with an office and changing facilities. The single storey concrete building will be designed to withstand severe exposure to waves over-topping the pier. The extremely exposed site is at the end of a harbour pier and the very high lateral wave forces to which the building will be subject will require specialised building …
View the procurement »
2023-10-06Est Constr: Cork University Clinical Medical School at Cork University Hospital for The Health Service Executive (Health Service Executive HSE)
The Works comprise the construction of a three storey Clinical Medical School Building (3,240 SqM in Floor Area) with double height plantrooms over together with the structural provision in terms of substructure, roof and frame to allow for a future two storey extension plus the routing of communication services through the corridors of the Main Hospital itself all on a confined site including extensive Mechanical and Electrical Services Installations and all associated extensive external works including …
View the procurement »
2023-10-05Est Constr: Cork University Clinical Medical School at Cork University Hospital for The Health Service Executive (Health Service Executive HSE)
The Works comprise the construction of a three storey Clinical Medical School Building (3,240 SqM in Floor Area) with double height plantrooms over together with the structural provision in terms of substructure, roof and frame to allow for a future two storey extension plus the routing of communication services through the corridors of the Main Hospital itself all on a confined site including extensive Mechanical and Electrical Services Installations and all associated extensive external works including …
View the procurement »
2023-10-05Donegal County Council Road Improvement Works -N56 Letterilly to Kilraine Phase 2 Part 1 and 2 (Donegal County Council_1193)
The road scheme will comprise of overlay and reconstruction (inlay) and online widening of the existing single carriageway, with the construction of a 2.5m wide cycle track adjacent to the existing road. The total length of the scheme is 2600m. The major elements of the works include the establishment, maintenance, and removal of traffic management for the Works, Fencing, Drainage, Earthworks, Pavement Works, Eir Temporary and Permanent Diversions, Road Restraint Systems, Kerbing, Footways and Cycle …
View the procurement »
2023-10-04TEN2300219 - RFT for the Construction Works of the Shannon Pot Discovery Centre and Cavan Burren Park, Co. Cavan (Cavan County Council)
Cavan County Council intends to appoint a suitability qualified building contractor to carry out the construction works of the Shannon Pot Discovery Centre and Cavan Burren Park, Co. Cavan. The sites are approx. 5km apart: 1. Development of a new entrance road, upgrade of existing carpark, new Discovery Centre and new walkways at Shannon Pot in the townlands of Derrylahan, Co. Cavan. The development may be carried out in phases subject to available funding. The proposed development will include the …
View the procurement »
2023-10-04Construction of Temporary Bus Depot at Jamestown (National Transport Authority_1149)
The proposed temporary depot will include provision for parking, maintenance and dispatch of buses to the public transport network serving the Dublin City urban areas and associated support infrastructure and amenity for drivers and support staff operating from the facility.This proposed depot will be located 7 km north of the city centre along the Jamestown Rd. The proposed depot will include 180 bus parking bays, a maintenance building (1000m2) and an administration building (700m2).
View the procurement »
2023-10-03IDA Ireland Athlone Business and Technology Park Landscape Upgrade (IDA Ireland)
The works are located in IDA Athlone Business and Technology Park. The upgrade works include but are not limited to the following: Tree, Hedge, and Ornamental Planting as outlined on the Drawings. Vegetation removal as required, Footpath and Cycleway construction, The Full scopes of the works and the obligations of the contractor are to be ascertained by reference to the Contract Documents and Drawing as a whole.
View the procurement »
2023-10-02On-Bus Works - Framework for Technology and Fabrication Works on Public Transport Buses 2024 to 2028 (National Transport Authority_1149)
The NTA is currently in procurement for two major projects: • Next Generation Automatic Vehicle Location (“NG AVL”); and • Next Generation Ticketing (“NGT”). These procurements will progress to implementation phases starting in Q4 2023 and they will require vehicle location, displays, sensors and ticketing equipment to be installed on all NTA buses (existing and new) in the coming years. This tender competition aims to put in place a Framework Agreement to enable Clients to perform enabling works on …
View the procurement »
2023-09-29Lough Scur Bridge Masonry Repair Work Contract 2023 (Waterways Ireland_225)
Repair works at Lough Scur Bridge will involve the repair of masonry arch bridge structure, i.e rebuild of damaged parapet,, reset of copings and repointing using a natural hydraulic lime mortar. Works are to be treated as a conservation / restoration activity, with care taken to maintain the original appearance and use of traditional materials, i.e. hydraulic lime mortars. Existing materials are to be reused where possible and matched as appropriate. Road closures /diversions may be required, and will …
View the procurement »
2023-09-29CLG An Clochan Liath - New Training Pitch (CLG An Clochan Liath)
Construction of new Sand carpet pitch at Clg An Clochan Liath, Rosses Park, Carnmore Road, Dungloe, Co. Donegal, F94 KW65. The stone sub-grade platform has been prepared by others in advance. The contractor will confirm that the platform has been installed in accordance with the design levels and signify their acceptance of same in writing in advance of any works commencing. The contractor will note the presence of peat-based soil / sand mix for use on the new pitch construction and the laboratory report …
View the procurement »
2023-09-28Consultancy Services, provision of Environmental Services(SEA/AA/SFRA)for Review of National Ports Policy to... (Department of Transport)
The services comprise : Consultancy Services (a) this is a non-SEA/AA/SFRA element of the consultancy services required.In phase one of the National Ports Policy Review, which involves the publication of an Issues Paper on National Ports Policy, the successful supplier will be required to review, examine and to collate by topic all submissions received by the Department to the public consultation on its National Ports Policy Issues Paper. Identifying common themes or recurring points received in …
View the procurement »
2023-09-27Emergency works (Scoil Mhuire Na Trocaire Ardee)
Emergency works at Scoil Mhuire Na Trocaire, Hale Street, Ardee, Co. Louth, A92 FR58. Works include a small extension, 2 No. platform lifts, internal alterations, resurfacing of existing play area and pathways, and surface drainage.
View the procurement »
2023-09-26MUTLI DISCIPLINARY CONSULTANCY FOR NAVAN LINE (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) through a single party framework requires the services of a multi-disciplinary consultant to support the the delivery of PMP Phases 1 – 6 (Project Scope and Approvals through to Construction) services for the Navan Rail Line Project. It is anticipated that the services for Phases 1-2 will be required for an initial period of 30 months with the option to extend by a period of 12 months at IÉ’s discretion, and with Phases 3-6, encompassing Preliminary Design, the Planning & Statutory …
View the procurement »
2023-09-25EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there …
View the procurement »
2023-09-25EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there …
View the procurement »
2023-09-21Donegal County Council - Dungloe Local Link Project, Dungloe, Co Donegal (Donegal County Council_1193)
Donegal County Council intends to carry out the development of local link transport infrastructure along with the installation of additional street furniture in Dungloe, Co Donegal. The scope of the Works involves everything that is contained within the Volume A - Works Requirements Documents and contract documents, as a guide the project comprises, but not limited to: Site clearance. Removal of items of street furniture. Development of a local link bus stop area and related ancillary works in a public …
View the procurement »