Supply and Install of 3no. floating Pontoon Sections using (H piles fixed directly back onto the harbour walls / existing concrete fingers) - typical 12.0m x 2.4m pontoons (3no. total) Supply and Install of typical 11.0m x 2.0m Gangway section to new pontoon sections.
Deadline
The time limit for receipt of tenders was 2023-10-06.
The procurement was published on 2023-09-28.
Contract notice (2023-09-28) Object Scope of the procurement
Title: Harbour equipment
Short description:
โSupply and Install of 3no. floating Pontoon Sections using (H piles fixed directly back onto the harbour walls / existing concrete fingers) - typical 12.0m...โ
Short description
Supply and Install of 3no. floating Pontoon Sections using (H piles fixed directly back onto the harbour walls / existing concrete fingers) - typical 12.0m x 2.4m pontoons (3no. total) Supply and Install of typical 11.0m x 2.0m Gangway section to new pontoon sections.
Show more Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Supplies
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Harbour equipment๐ฆ
Additional CPV: Harbour construction works๐ฆ Place of performance
NUTS region: West๐๏ธ
Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender