2023-09-15IDA Ireland Demolition of Lissywollen House (IDA Ireland)
The proposed works that form part of this package are outlined briefly below; • Demolition of all existing structures on the site • Removal and safe disposal of all materials on the site including tyres. The site is to be left free from all materials. • Following demolition, the contractor is to undertake a topographical survey to tie into the previous survey undertaken on the site to fill in the gaps that would now exist due to the buildings being removed. • Please note that no trees are to be damaged …
View the procurement »
2023-06-14Monaghan County Council’s Multi-Party Contractor Framework Refurbishing Properties 2023-2026 (Monaghan County Council)
Typical refurbishment works undertaken by contractor under the multi-party framework is as follows; Electrical Upgrade, Plumbing Upgrade, Fire Detection (Upgrade Alarms/Doors), Flooring Repairs, Carpets / Floor Coverings, Window / Door Draught replacement / sealing, Attic Insulation, Heating System upgrade, Energy Efficiency upgrade, New Kitchen, New Bathroom, conversion of bedroom to Bathroom, Upgrade Existing Toilets, White Goods, provide Beds/Linen, Furniture, painting and carpentry upgrades, …
View the procurement »
2023-04-28Whitestown Remediation Project - The removal of all waste, contaminated soil and potentially contaminated soil from... (Wicklow County Council)
Works shall include but not limited to;
• Site mobilisation, set up and enabling works.
• Installation of environmental protection measures
o surface water management
o silt fence installation
o installation of additional or replacement monitoring infrastructure
• Staged waste excavation and removal of waste, contaminated and potentially contaminated soil (approximately 175,000m3) and associated reprofiling works
• Landscaping and Fencing
• Demobilisation
• Post Remediation Handover Period
View the procurement »
2022-11-02Pre-Qualification of Works Contractors for Tyndall North New Facility (University College Cork ( UCC ))
The project consists of the construction of a new circa 17,426m2 research building. The building will be primarily used as a research facility with LV labs, packaging, ULV Labs, bio photonics labs, ancillary labs, meeting rooms, offices, roof top plant enclosure, support service areas and roof terraces. The third, fourth and fifth floor will currently not be fitted out as part of this tender.
The building structure is a concrete frame with lightweight internal walls. The external elevation will consist …
View the procurement »
2022-03-03Demolition of Midlands Stations (Electricity Supply Board ( ESB ))
The Contracting Entity intends to procure a contract for the provision of demolition and associated site remediation services at two ESB peat burning plants located at Shannonbridge, Co. Offaly and Lanesborough, Co. Longford.
The contract will be awarded in two Lots,
Lot 1 Demolition and associated site remediation services in Shannonbridge Co. Offaly
Lot 2 Demolition and associated site remediation services in Lanesborough Co. Longford.
The works shall include for the removal of all structures, …
View the procurement »
2021-02-17Dublin Airport (DAP) Works Framework Agreement (daa plc)
The scope of the projects issued under the WP11 Dublin Airport (DAP) works framework agreement comprises the design, procurement, construction, testing, commissioning and putting into service of works and services to safeguard the potential for future development at Dublin Airport and improve the existing infrastructure.
View the procurement »
2020-09-07Demolition of Two ESB Midland Stations (Electricity Supply Board (ESB))
The contracting entity intends to procure a contract with a single contractor for the demolition services in accordance with planning permission for both sites of the two ESB midland stations, located at Shannonbridge, Co. Offaly and Lanesborough, Co. Longford.
The contract shall include for the removal of all structures, buildings and plant components with associated waste disposal as per the stipulations outlined in the planning and environmental regulations for each site.
It is proposed that the …
View the procurement »
2020-08-05UCD Future Campus Phase 1 — New Services, Infrastructure and Utilities Diversions (University College Dublin (UCD))
The proposed works comprise new services including diversions, utilities, attenuation and subase formation for parts of phase 1 of the future campus; approximately 3 hectares in total (part occupied by buildings, car parking, ancillary structures, paving and soft landscaping not part of this contract). The services installations will include polyethylene, clay and PVC pipework for foul and storm water sewers, telecoms, electricity, watermains and gas mains to serve new academic buildings. Excavation …
View the procurement » Mentioned suppliers:Kilwex Ltd
2020-05-15Demolition and Enabling Works Package (Limerick Twenty Thirty Strategic Development DAC)
The opera Site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place. This demolition and enabling works package includes installation of hoarding, site clearance, temporary works, building demolition, surface water management, engagement with local utilities for water, gas and electricity while ensuring that both the conservation buildings on the site and the ecology of the site is protected.
View the procurement » Mentioned suppliers:John Sisk and Son (Holdings) Ltd
2019-02-21Clontarf to City Centre Cycle Route (Dublin City Council)
Dublin City Council wish to engage a Contractor to carry out 2,7 km of urban road reconstruction between Alfie Byrne Road and Talbot Street and 1 km of greenway through Fairview Park along the River Tolka.
Works will include but are not limited to:
— upgrade and reconfigure signalised junctions,
— construct new toucan crossings,
— install DCC public lighting and CCTV infrastructure,
— pavement construction,
— granite and concrete paving and kerbing,
— retaining walls,
— drainage and water main works,
— …
View the procurement » Mentioned suppliers:Clonmel Enterprises Ltd
2018-12-19Kerdiffstown Landfill Remediation Project Contract No. 4 - Main Works (Kildare County Council)
Remediation of the former landfill site at Kerdiffstown, Naas, Co. Kildare by capping wastes across the site, by providing a landscaped profile to the site and improving the landfill infrastructure systems, to ultimately provide a multi-use public park. The site occupies approximately 30 hectare and the works include the following;
Installation of an engineered capping system across the site;
Installation of new environmental management and control systems including leachate and landfill …
View the procurement » Mentioned suppliers:Wills Bros Ltd.
2018-08-22LIT Single Operator Framework for Coonagh Internal Fit-Out (Limerick Institute of Technology)
Single Operator Framework for selected works at its new campus located at Coonagh Cross Shopping Centre. The Framework works may include, but are not limited to:
— General Building Works,
— Extensions, Demolitions and Alterations to and of Existing Structures,
— Construction of New Buildings,
— Repair and Refurbishment of Existing Buildings,
— Mechanical and Electrical works through reserved specialist subcontractors,
— Minor Civil Engineering Works,
— Miscellaneous Maintenance Projects.
The works …
View the procurement »
2018-08-07Cork City Water Supply Scheme Networks Upgrades (Irish Water)
Irish Water is responsible for the treatment and distribution of drinking water in Cork City.
As part of the implementation of a Water Conservation Project for the city, watermains in the network have been identified for rehabilitation. These include watermains that:
— Are not suitably responsive to active leakage control measures,
— Have water quality issues,
— Have reached the end of their service life, and
— Have insufficient hydraulic capacity and are impacting on the efficient operation of the …
View the procurement » Mentioned suppliers:Northstone (NI) Lt T/A Farrans Construction
2018-04-13Cork City and Mallow Network Contracts (Irish Water)
Irish Water is responsible for the treatment & distribution of drinking water & the provision of sewer collection systems in Cork City & Co.
— Lot 1: A number of Combined Sewer Overflows (CSOs) have been identified for removal from the sewer network in Mallow as they are currently in breach of the urban wastewater treatment directive & are the subject of an European Court of Justice (ECJ) infringement notice. The removal of these CSOs will necessitate new trunk sewers to be constructed within the town.
— …
View the procurement » Mentioned suppliers:Ward and Burke Construction Ltd
2016-10-11Framework Agreement for Demolition Works Contracts (Limerick City and County Council)
Limerick City and County Council is seeking expressions of interest from Demolition Contractors for inclusion on a framework agreement for demolition works contracts. The works typically involves demolition of both individual houses and blocks of houses. Associated works may include, but is not limited to, asbestos removal, isolation of dwellings to be demolished from adjoining properties, temporary weathering of adjoining gables and new gable wall construction, as well as site perimeter works such as …
View the procurement »
2016-03-24Curragh Racecourse Redevelopment (Contract Phase 1): Contract for the Enabling Works Package (Curragh Racecourse Ltd)
Contract Phase 1: Enabling Works
The enabling works contract involves the demolition of the existing east and west
grandstand, the Turf Club Rooms incorporating the weigh room, existing areas of
hard landscaping, sections of perimeter walls, removal and disposal of asbestos,
termination and diversion of services, installation of new services such as surface
water and wastewater infrastructure within the main site, felling of a select
number of trees and tree protection.
A specialist requirement under the …
View the procurement » Mentioned suppliers:Murphy International Ltd
2016-03-15Single-Party Framework Agreement for the Refurbishment and New Build of the Stable Yard (Curragh Racecourse Ltd)
Contract Phase 2 — Stable Yard: The overall works requirements are split into two
separate contracts.
Contract 1 involves the refurbishment of 76 existing stables. The extent of the
refurbishment works is dependent on the condition of the individual stable.
Applicants should note that there will be limited conservation works to a small
number of stables marked for refurbishment and this will require close
consultation with the project Conservation Architect. It is envisaged that Contract
1 will commence …
View the procurement » Mentioned suppliers:Purcell Construction Ltd
2013-10-11Multi-Party Framework for Demolition Works for Dublin City Council and Fingal County Council (Dublin City Council)
It is proposed to establish a Multi-Party Framework for Demolition Contractors for Dublin City Council and Fingal County Council. As stand-alone demolition projects arise over the life of the framework in the functional areas of the named Local Authorities, contracts will be awarded by competitive tender to contractors listed on the framework. The principal purpose of contracts used to demonstrate
evidence of experience, must be demolition of former flat blocks, old housing stock, derelict buildings and …
View the procurement »