2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-03-13Supply of operation and maintenance services for Coillte Windfarm (Coillte Teoranta)
Including the following (but not limited to):
Review of existing HSE documentation and a ground-level visual inspection of all civil, structural, mechanical electrical infrastructure and works associated with the wind farm facility, shall compile a site-specific Health and Safety Management system including a comprehensive Operations Health and Safety Plan, implement the Renewable UK Wind Turbine Safety Rules (WTSR), shall act as Operational Controller and carry out and record Transfer of Control (TOC) …
View the procurement »
2014-12-03Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire.
Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions.
View the procurement »
2014-03-28Civil Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre-qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2014-02-19SC 02/14 OPL - Supply, erection and commissioning of wind turbines for Oweninny Wind Farm (Oweninny Power Limited)
It is intended to award this contract through a Joint Venture company, Owenniny Power Limited. The Joint Venture parties are Bord Na Mona Energy Limited and ESB Wind Development Limited. Expressions of interest are invited from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Oweninny Wind Farm.
Oweninny Wind Farm Phase 1 and Phase 2 will have circa 172 MW capacity.
A long term (minimum 5 years) services and maintenance agreement …
View the procurement »
2013-12-12Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of Interest document.
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-08-02RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms.
The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot.
Details of each Lot as follows:
Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. …
View the procurement »
2013-02-01RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of:
1) Planning & Environmental Assessment;
2) Archaeological, Architectural & Cultural Heritage;
3) Hydrology, Hydrogeology & Water Quality;
4) Geotechnical;
5) Noise & Vibration;
6) Landscape & Visual Impact Assessment;
7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ;
8) Shadow Flicker Assessment;
9) …
View the procurement »
2012-12-19PG108T829 Raheenleagh Wind Turbines (ESB &/or its Subsidiaries & Joint Venture Partnerships (hereinafter referred to as ESB))
It is ESBs intention to award this contract through a Joint Venture company. ESBs Joint Venture Partner is Coillte.
ESB invites expressions of interest from suitably qualified candidates interested in being considered for the supply, erection and commissioning of wind turbines for Raheenleagh Wind Farm. A long term (minimum 2 years) services and maintenance agreement also forms part of the scope of supply.
Proposals for assistance in funding the project may also be requested.
ESB will use the negotiated …
View the procurement »
2012-10-05Selection of Consultancy Services Panels for Coillte’s Wind Farm Projects (Coillte)
Introduction.
Coillte Wind Energy request expressions of interest for the qualification of service providers for the provision of various services across 5 separate lots as outlined below:
Lot 1: EIA and Engineering Consultancy.
Lot 2: Wind Analysis.
Lot 3: Grid and Electrical Infrastructure.
Lot 4: Mechanical and Electrical Procurement Consultants.
Lot 5: Radio Analysis and Planning Services.
Background to Coillte:
Coillte was established under the Forestry Act 1988, which defines the principal …
View the procurement »
2012-06-29IDA 500KW wind turbine supply and installation project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth.
The successful Applicant will be appointed as the supply and installation Contractor of a 500KW wind turbine at the IDA Business Park, Mullagharlin, Dundalk, with responsibility to procure, install, commission and complete the Works in accordance with the Works Requirements. The wind turbine must comply with IEC Class 11A and Class 111A. The supply and installation contractor will be novated to …
View the procurement »
2012-06-29IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth.
The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at …
View the procurement »
2012-05-21FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational …
View the procurement »
2011-12-16DCU GMP Equipment 2011 (Dublin City University (DCU))
DCU wishes to invite tenders for the supply of the following:
Lot 1: Ref. DCUG11117-01 Two GMP autoclaves.
Lot 2: Ref. DCUG11117-02 Two ultra low temperature freezers.
Lot 3: Ref. DCUG11117-03 One floor standing under-bench low temperature freezer.
Lot 4: Ref. DCUG11117-04 One rocker/shaker platform for gentle mixing of biological samples.
Lot 5: Ref. DCUG11117-05 One incubator for bacteria growth on petri dishes.
Lot 6: Ref. DCUG11117-06 One filter integrity testing instrument.
Lot 7: Ref. DCUG11117-07 …
View the procurement » Mentioned suppliers:Bio-Sciences Ltd.Focus Scientific Solutions LtdMason TechnologyMedical Supply Co Ltd
2011-02-28Multi supplier framework for civil contracts relating to Bord Gáis wind farm development (Bord Gais Eireann)
This pre-qualification questionnaire is issued by Bord Gáis Éireann (“the Client”) for the purposes of providing information to applicants interested in applying to pre-qualify and proceed to the tender stage for the procurement of a framework for the provision of certain civil construction works in connection with the development of wind farms by the client (or any subsidiary of the client).
The anticipated scope of civil works applicable to the framework includes but is not limited to the following …
View the procurement »